| EP3113351 - MOTOR CONTROL SYSTEM AND MOTOR CONTROL METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 01.10.2021 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 23.10.2020 | ||
| Former | Grant of patent is intended Status updated on 11.06.2020 | ||
| Former | Examination is in progress Status updated on 05.07.2019 | ||
| Former | Request for examination was made Status updated on 02.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Hitachi Automotive Systems, Ltd. 2520 Takaba Hitachinaka-shi, Ibaraki 312-8503 / JP | [2017/01] | Inventor(s) | 01 /
NAOI Shigeru c/o HITACHI AUTOMOTIVE SYSTEMS, LTD. 2520 Takaba Hitachinaka-shi Ibaraki 312-8503 / JP | 02 /
UEHARA Atsushi c/o HITACHI AUTOMOTIVE SYSTEMS, LTD. 2520 Takaba Hitachinaka-shi Ibaraki 312-8503 / JP | 03 /
NAGAI Takashi c/o HITACHI CAR ENGINEERING CO., LTD. 2477 Takaba Hitachinaka-shi Ibaraki 312-8503 / JP | [2020/48] |
| Former [2017/01] | 01 /
NAOI Shigeru c/o HITACHI AUTOMOTIVE SYSTEMS LTD. 2520 Takaba Hitachinaka-shi Ibaraki 312-8503 / JP | ||
| 02 /
UEHARA Atsushi c/o HITACHI AUTOMOTIVE SYSTEMS LTD. 2520 Takaba Hitachinaka-shi Ibaraki 312-8503 / JP | |||
| 03 /
NAGAI Takashi c/o HITACHI CAR ENGINEERING CO. LTD. 2477 Takaba Hitachinaka-shi Ibaraki 312-8503 / JP | Representative(s) | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Straße 29 80336 München / DE | [N/P] |
| Former [2017/01] | MERH-IP Matias Erny Reichl Hoffmann Patentanwälte PartG mbB Paul-Heyse-Strasse 29 80336 München / DE | Application number, filing date | 15754943.7 | 14.01.2015 | [2017/01] | WO2015JP50708 | Priority number, date | JP20140033951 | 25.02.2014 Original published format: JP 2014033951 | [2017/01] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015129311 | Date: | 03.09.2015 | Language: | JA | [2015/35] | Type: | A1 Application with search report | No.: | EP3113351 | Date: | 04.01.2017 | Language: | EN | [2017/01] | Type: | B1 Patent specification | No.: | EP3113351 | Date: | 25.11.2020 | Language: | EN | [2020/48] | Search report(s) | International search report - published on: | JP | 03.09.2015 | (Supplementary) European search report - dispatched on: | EP | 30.11.2017 | Classification | IPC: | H02P5/00, G05B9/03, B60W50/029, G05B23/02, H02P29/032 | [2018/01] | CPC: |
B60W50/029 (EP,US);
G05B23/0286 (US);
G05B9/03 (EP,US);
H02P29/032 (EP,US);
H02P5/00 (EP);
H02P6/04 (US)
|
| Former IPC [2017/01] | H02P5/00, G05B9/03, B60W50/029 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/01] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | MOTORSTEUERUNGSSYSTEM UND MOTORSTEUERUNGSVERFAHREN | [2017/01] | English: | MOTOR CONTROL SYSTEM AND MOTOR CONTROL METHOD | [2017/01] | French: | SYSTÈME DE COMMANDE DE MOTEUR ET PROCÉDÉ DE COMMANDE DE MOTEUR | [2017/01] | Entry into regional phase | 14.07.2016 | Translation filed | 26.09.2016 | National basic fee paid | 26.09.2016 | Search fee paid | 26.09.2016 | Designation fee(s) paid | 26.09.2016 | Examination fee paid | Examination procedure | 14.07.2016 | Date on which the examining division has become responsible | 26.09.2016 | Examination requested [2017/01] | 15.03.2018 | Amendment by applicant (claims and/or description) | 09.07.2019 | Despatch of a communication from the examining division (Time limit: M04) | 19.11.2019 | Reply to a communication from the examining division | 12.06.2020 | Communication of intention to grant the patent | 19.10.2020 | Fee for grant paid | 19.10.2020 | Fee for publishing/printing paid | 19.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 26.08.2021 | No opposition filed within time limit [2021/44] | Fees paid | Renewal fee | 31.01.2017 | Renewal fee patent year 03 | 31.01.2018 | Renewal fee patent year 04 | 31.01.2019 | Renewal fee patent year 05 | 31.01.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.01.2015 | AL | 25.11.2020 | AT | 25.11.2020 | CY | 25.11.2020 | CZ | 25.11.2020 | DK | 25.11.2020 | EE | 25.11.2020 | ES | 25.11.2020 | FI | 25.11.2020 | HR | 25.11.2020 | IT | 25.11.2020 | LT | 25.11.2020 | LV | 25.11.2020 | MC | 25.11.2020 | MK | 25.11.2020 | MT | 25.11.2020 | NL | 25.11.2020 | PL | 25.11.2020 | RO | 25.11.2020 | RS | 25.11.2020 | SE | 25.11.2020 | SI | 25.11.2020 | SK | 25.11.2020 | SM | 25.11.2020 | TR | 25.11.2020 | IE | 14.01.2021 | LU | 14.01.2021 | FR | 25.01.2021 | BE | 31.01.2021 | CH | 31.01.2021 | LI | 31.01.2021 | BG | 25.02.2021 | GB | 25.02.2021 | NO | 25.02.2021 | GR | 26.02.2021 | IS | 25.03.2021 | PT | 25.03.2021 | [2024/41] |
| Former [2024/29] | HU | 14.01.2015 | |
| AL | 25.11.2020 | ||
| AT | 25.11.2020 | ||
| CY | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| MK | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| TR | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2024/22] | HU | 14.01.2015 | |
| AL | 25.11.2020 | ||
| AT | 25.11.2020 | ||
| CY | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| MK | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2023/30] | HU | 14.01.2015 | |
| AL | 25.11.2020 | ||
| AT | 25.11.2020 | ||
| CY | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2023/27] | HU | 14.01.2015 | |
| AL | 25.11.2020 | ||
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/34] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BE | 31.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/23] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/10] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/09] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| GB | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2022/07] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| IE | 14.01.2021 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/52] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| CH | 31.01.2021 | ||
| LI | 31.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/51] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| ES | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/50] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SI | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/48] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| IT | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| LU | 14.01.2021 | ||
| FR | 25.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/46] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| NL | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| LU | 14.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/45] | AL | 25.11.2020 | |
| AT | 25.11.2020 | ||
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| LU | 14.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/43] | AT | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| LU | 14.01.2021 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/40] | AT | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| MC | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/37] | AT | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| DK | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/36] | AT | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| EE | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/35] | AT | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RO | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SK | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/34] | AT | 25.11.2020 | |
| CZ | 25.11.2020 | ||
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/33] | AT | 25.11.2020 | |
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LT | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/32] | AT | 25.11.2020 | |
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| SM | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/28] | AT | 25.11.2020 | |
| FI | 25.11.2020 | ||
| HR | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/25] | AT | 25.11.2020 | |
| FI | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| PL | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| IS | 25.03.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/23] | AT | 25.11.2020 | |
| FI | 25.11.2020 | ||
| LV | 25.11.2020 | ||
| RS | 25.11.2020 | ||
| SE | 25.11.2020 | ||
| BG | 25.02.2021 | ||
| NO | 25.02.2021 | ||
| GR | 26.02.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/22] | FI | 25.11.2020 | |
| RS | 25.11.2020 | ||
| NO | 25.02.2021 | ||
| PT | 25.03.2021 | ||
| Former [2021/21] | FI | 25.11.2020 | |
| PT | 25.03.2021 | ||
| Former [2021/20] | FI | 25.11.2020 | Documents cited: | Search | [XAY] US2002099487 (SUGANUMA TAKESHI et al.) [X] 1,2,15 * abstract * * figure - * * paragraph [0011] - paragraph [0015] * * paragraph [0053] - paragraph [0076] *[A] 12,13 [Y] 3-11,14 | [YA] EP1426266 (TOYODA MACHINE WORKS LTD et al.) [Y] 3-11,14 * the whole document *[A] 1,15 | [A] US2011266964 (SCHLENK MANFRED et al.) [A] 1-15 * abstract * * figures 1-3 * * paragraph [0006] - paragraph [0014] * | International search | [YA] JP2008005624 (HITACHI LTD et al.) [Y] 1-3, 5-7, 15 * , paragraphs [0015] to [0032]; fig. 1 to 3 & US 2008/0007196 A1 & CA 2592354 A1 *[A] 4, 8-14 | [YA] JP2008248732 (MITSUBISHI HEAVY IND LTD et al.) [Y] 1-3, 5-7, 15 * , paragraphs [0022] to [0032]; fig. 1 to 2 (Family: none) *[A] 8 | [Y] JP2013141370 (MITSUBISHI ELECTRIC CORP et al.) [Y] 2 * , paragraphs [0026] to [0038]; fig. 3 to 4 (Family: none) * | [Y] JPH08116675 (MEIDENSHA ELECTRIC MFG CO LTD et al.) [Y] 5-6 * , fig. 1 to 2 (Family: none) * | [A] US2010188055 (PATTERSON STANLEY C et al.) [A] 1-15 * , entire text; all drawings (Family: none) * | Examination | US5372540 | US4141066 | US5115415 |