EP3201261 - METHOD FOR CURING CURABLE COMPOSITIONS [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 09.11.2018 | ||
Former | Grant of patent is intended Status updated on 25.06.2018 | ||
Former | Request for examination was made Status updated on 07.07.2017 | ||
Former | The international publication has been made Status updated on 21.04.2017 | Most recent event Tooltip | 01.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 03.08.2022 [2022/31] | Applicant(s) | For all designated states BASF SE 67056 Ludwigshafen / DE | [2018/50] |
Former [2017/32] | For all designated states BASF SE 67056 Ludwigshafen / DE | Inventor(s) | 01 /
FEICHTENSCHLAGER, Bernhard Kolpingstraße 11 83278 Traunstein / DE | 02 /
SMEETS, Alfons Haushoferstrasse 15 83358 Seebruck / DE | 03 /
BRUCHMANN, Bernd Bahnhofstr. 58 67251 Freinsheim / DE | 04 /
THOMAS, Hans-Josef Rheydter Straße 200 A 41352 Korschenbroich / DE | 05 /
FLEISCHEL, Olivier 18 Rue du Commerce F-67201 Eckbolsheim / FR | [2017/32] | Representative(s) | BASF IP Association BASF SE G-FLP-C006 67056 Ludwigshafen / DE | [2018/50] |
Former [2017/32] | Büchel, Edwin Isenbruck Bösl Hörschler LLP Patentanwälte Eastsite One Seckenheimer Landstraße 4 68163 Mannheim / DE | Application number, filing date | 15756121.8 | 06.08.2015 | [2017/32] | WO2015EP68137 | Priority number, date | EP20140187375 | 01.10.2014 Original published format: EP 14187375 | [2017/32] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016050398 | Date: | 07.04.2016 | Language: | DE | [2016/14] | Type: | A1 Application with search report | No.: | EP3201261 | Date: | 09.08.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 07.04.2016 takes the place of the publication of the European patent application. | [2017/32] | Type: | B1 Patent specification | No.: | EP3201261 | Date: | 12.12.2018 | Language: | DE | [2018/50] | Search report(s) | International search report - published on: | EP | 07.04.2016 | Classification | IPC: | C08J3/24, C09J133/14, C08J5/04, C08J5/24 | [2017/32] | CPC: |
C08J3/247 (EP,CN,US);
C08J5/042 (EP,CN,US);
C08J5/043 (US);
C08J2361/00 (EP,CN,US);
C08J2367/06 (EP,CN,US);
C09J133/064 (EP,CN,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN ZUR HÄRTUNG VON HÄRTBAREN ZUSAMMENSETZUNGEN | [2017/32] | English: | METHOD FOR CURING CURABLE COMPOSITIONS | [2017/32] | French: | PROCÉDÉ POUR FAIRE DURCIR DES COMPOSITIONS DURCISSABLES | [2017/32] | Entry into regional phase | 02.05.2017 | National basic fee paid | 02.05.2017 | Designation fee(s) paid | 02.05.2017 | Examination fee paid | Examination procedure | 20.04.2017 | Date on which the examining division has become responsible | 02.05.2017 | Examination requested [2017/32] | 21.11.2017 | Amendment by applicant (claims and/or description) | 26.06.2018 | Communication of intention to grant the patent | 25.10.2018 | Fee for grant paid | 25.10.2018 | Fee for publishing/printing paid | 25.10.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 13.09.2019 | No opposition filed within time limit [2019/47] | Fees paid | Renewal fee | 31.08.2017 | Renewal fee patent year 03 | 31.08.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 06.08.2015 | AL | 12.12.2018 | CY | 12.12.2018 | CZ | 12.12.2018 | EE | 12.12.2018 | FI | 12.12.2018 | HR | 12.12.2018 | LT | 12.12.2018 | LV | 12.12.2018 | MC | 12.12.2018 | MK | 12.12.2018 | MT | 12.12.2018 | RO | 12.12.2018 | RS | 12.12.2018 | SI | 12.12.2018 | SK | 12.12.2018 | SM | 12.12.2018 | TR | 12.12.2018 | BG | 12.03.2019 | NO | 12.03.2019 | GR | 13.03.2019 | IS | 12.04.2019 | PT | 12.04.2019 | IE | 06.08.2019 | LU | 06.08.2019 | [2022/31] |
Former [2021/34] | HU | 06.08.2015 | |
AL | 12.12.2018 | ||
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
MT | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 06.08.2019 | ||
LU | 06.08.2019 | ||
Former [2021/32] | HU | 06.08.2015 | |
AL | 12.12.2018 | ||
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 06.08.2019 | ||
LU | 06.08.2019 | ||
Former [2021/26] | AL | 12.12.2018 | |
CY | 12.12.2018 | ||
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 06.08.2019 | ||
LU | 06.08.2019 | ||
Former [2021/08] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 06.08.2019 | ||
LU | 06.08.2019 | ||
Former [2020/36] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
IE | 06.08.2019 | ||
LU | 06.08.2019 | ||
Former [2020/25] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
MC | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
LU | 06.08.2019 | ||
Former [2020/17] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
TR | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/50] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SI | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/39] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SK | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
IS | 12.04.2019 | ||
PT | 12.04.2019 | ||
Former [2019/37] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
EE | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RO | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
SM | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/35] | AL | 12.12.2018 | |
CZ | 12.12.2018 | ||
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/33] | AL | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
PT | 12.04.2019 | ||
Former [2019/26] | AL | 12.12.2018 | |
FI | 12.12.2018 | ||
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/25] | FI | 12.12.2018 | |
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
RS | 12.12.2018 | ||
SE | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
GR | 13.03.2019 | ||
Former [2019/23] | FI | 12.12.2018 | |
HR | 12.12.2018 | ||
LT | 12.12.2018 | ||
LV | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/22] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
BG | 12.03.2019 | ||
NO | 12.03.2019 | ||
Former [2019/21] | FI | 12.12.2018 | |
LT | 12.12.2018 | ||
NO | 12.03.2019 | ||
Former [2019/20] | LT | 12.12.2018 | |
NO | 12.03.2019 | Cited in | International search | [A]WO2011006947 (BASF SE [DE], et al) [A] 1-15 * page 4, line 18 * * page 9, line 17 * * page 11, line 25 *; | [XA]WO2011141424 (BASF SE [DE], et al) [X] 17-19 * page 24, line 30; claim 1 *[A] 1-16; | [AP]WO2015067478 (CONSTR RES & TECH GMBH [DE]) [AP] 1-19 * page 3, line 5; claim 1 * | by applicant | EP0007508 | EP0057474 | EP0495751 | EP0615980 | US5380901 | DE19618720 | WO9828252 | WO9833761 | DE19826712 | DE19913353 | DE19957900 | EP1275668 | WO2005057286 | EP2287229 | WO2011141424 | WO2012126695 | WO2014152850 | - A.K. O'BRIAN; N.B. CRAMER; C.N. BOWMAN, "Oxygen inhibition in Thiol-Acrylate Photopolymerizations", J. POLYM. SCI., PART A: POLYM. CHEM, (2006), vol. 44, pages 2007 - 2014 | - "Methode zur Bestimmung der Polydispersität ist", Analytiker Taschenbuch, (1984), vol. 4, pages 433 - 442 | - Ullmanns Enzyklopädie der technischen Chemie, vol. 19, pages 62 - 65 | - H. FREY ET AL., ACTA POLYM., (1997), vol. 48, pages 30 - 35 | - Advances in Polymer Science, SPRINGER, (1974), vol. 14 | - "Chemistry and Technology of UV- and EB-Formulation for Coatings, Inks and Paints", K. K. DIETLIKER, Photoinitiators for Free Radical and Cationic Polymerization, SI-TA TECHNOLOGY LTD, vol. 3 |