EP3183583 - METHOD FOR SELECTING A TRANSPLANTATION DONOR OR DONOR MATERIAL USING LOW OR INTERMEDIATE HLA TYPING INFORMATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 19.05.2023 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 10.06.2022 | ||
Former | Grant of patent is intended Status updated on 12.04.2022 | ||
Former | Examination is in progress Status updated on 04.05.2020 | ||
Former | Request for examination was made Status updated on 26.05.2017 | ||
Former | The international publication has been made Status updated on 24.02.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states PIRCHE AG Stuttgarter Platz 2 10627 Berlin / DE | [2022/32] |
Former [2017/26] | For all designated states PIRCHE AG Am Karlsbad 15 10785 Berlin / DE | Inventor(s) | 01 /
MCCLOSKEY, Daniel 225 Langley Way West Wickham Kent BR4 0DW / GB | [2017/26] | Representative(s) | Hertin und Partner Rechts- und Patentanwälte PartG mbB Kurfürstendamm 54/55 10707 Berlin / DE | [2017/26] | Application number, filing date | 15757188.6 | 20.08.2015 | [2017/26] | WO2015EP69163 | Priority number, date | EP20140181626 | 20.08.2014 Original published format: EP 14181626 | US201462041295P | 25.08.2014 Original published format: US 201462041295 P | [2017/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016026934 | Date: | 25.02.2016 | Language: | EN | [2016/08] | Type: | A1 Application with search report | No.: | EP3183583 | Date: | 28.06.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 25.02.2016 takes the place of the publication of the European patent application. | [2017/26] | Type: | B1 Patent specification | No.: | EP3183583 | Date: | 13.07.2022 | Language: | EN | [2022/28] | Type: | B8 Corrected title page of specification | No.: | EP3183583 | Date: | 17.08.2022 | [2022/33] | Search report(s) | International search report - published on: | EP | 25.02.2016 | Classification | IPC: | G01N33/68 | [2022/08] | CPC: |
G16B20/20 (EP,US);
G01N33/6878 (EP,US);
G16B20/00 (EP,US);
G16B99/00 (EP,US);
G16H50/20 (US);
G01N2333/70539 (EP,US);
|
Former IPC [2017/26] | G01N33/68, G06F19/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/26] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN ZUR AUSWAHL EINES TRANSPLANTATIONSSPENDERS ODER SPENDERMATERIALS MITINFORMATIONEN ÜBER HLA-TYPISIERUNG MIT NIEDRIGER ODER MITTLERER AUFLÖSUNG | [2017/26] | English: | METHOD FOR SELECTING A TRANSPLANTATION DONOR OR DONOR MATERIAL USING LOW OR INTERMEDIATE HLA TYPING INFORMATION | [2017/26] | French: | MÉTHODE DE SÉLECTION D'UNE MATIÈRE DE TYPE DONNEUR OU D'UN DONNEUR DE TRANSPLANTATION À L'AIDE D'INFORMATIONS DE TYPAGE HLA FAIBLE OU INTERMÉDIAIRE | [2017/26] | Entry into regional phase | 23.02.2017 | National basic fee paid | 23.02.2017 | Designation fee(s) paid | 23.02.2017 | Examination fee paid | Examination procedure | 17.06.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 23.02.2017 | Examination requested [2017/26] | 23.02.2017 | Date on which the examining division has become responsible | 28.09.2017 | Amendment by applicant (claims and/or description) | 08.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.09.2020 | Reply to a communication from the examining division | 09.04.2021 | Despatch of a communication from the examining division (Time limit: M06) | 11.10.2021 | Reply to a communication from the examining division | 13.04.2022 | Communication of intention to grant the patent | 02.06.2022 | Fee for grant paid | 02.06.2022 | Fee for publishing/printing paid | 02.06.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 14.04.2023 | No opposition filed within time limit [2023/25] | Fees paid | Renewal fee | 31.07.2017 | Renewal fee patent year 03 | 09.08.2018 | Renewal fee patent year 04 | 06.08.2019 | Renewal fee patent year 05 | 12.08.2020 | Renewal fee patent year 06 | 12.08.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.08.2015 | AL | 13.07.2022 | AT | 13.07.2022 | BG | 13.07.2022 | CY | 13.07.2022 | CZ | 13.07.2022 | EE | 13.07.2022 | ES | 13.07.2022 | FI | 13.07.2022 | HR | 13.07.2022 | IT | 13.07.2022 | LT | 13.07.2022 | LV | 13.07.2022 | MC | 13.07.2022 | MK | 13.07.2022 | MT | 13.07.2022 | PL | 13.07.2022 | RO | 13.07.2022 | RS | 13.07.2022 | SE | 13.07.2022 | SI | 13.07.2022 | SK | 13.07.2022 | SM | 13.07.2022 | IE | 20.08.2022 | LU | 20.08.2022 | BE | 31.08.2022 | CH | 31.08.2022 | LI | 31.08.2022 | NO | 13.10.2022 | GR | 14.10.2022 | IS | 13.11.2022 | PT | 14.11.2022 | [2024/41] |
Former [2024/34] | HU | 20.08.2015 | |
AL | 13.07.2022 | ||
AT | 13.07.2022 | ||
BG | 13.07.2022 | ||
CY | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
MK | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2024/27] | HU | 20.08.2015 | |
AL | 13.07.2022 | ||
AT | 13.07.2022 | ||
CY | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
MK | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2024/21] | HU | 20.08.2015 | |
AL | 13.07.2022 | ||
AT | 13.07.2022 | ||
CY | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2024/18] | HU | 20.08.2015 | |
AL | 13.07.2022 | ||
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2024/11] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
IT | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/42] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
BE | 31.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/37] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SI | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/33] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
IE | 20.08.2022 | ||
LU | 20.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/29] | AL | 13.07.2022 | |
AT | 13.07.2022 | ||
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
LU | 20.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/23] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
EE | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SK | 13.07.2022 | ||
SM | 13.07.2022 | ||
LU | 20.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/22] | AT | 13.07.2022 | |
CZ | 13.07.2022 | ||
ES | 13.07.2022 | ||
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
MC | 13.07.2022 | ||
PL | 13.07.2022 | ||
RO | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
LU | 20.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/21] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
LU | 20.08.2022 | ||
CH | 31.08.2022 | ||
LI | 31.08.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/20] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
SM | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/12] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
IS | 13.11.2022 | ||
PT | 14.11.2022 | ||
Former [2023/11] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
PL | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/10] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
HR | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
GR | 14.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/09] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
LT | 13.07.2022 | ||
LV | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | ||
PT | 14.11.2022 | ||
Former [2023/08] | ES | 13.07.2022 | |
FI | 13.07.2022 | ||
LT | 13.07.2022 | ||
RS | 13.07.2022 | ||
SE | 13.07.2022 | ||
NO | 13.10.2022 | Cited in | International search | [E]WO2015169597 (CYTOLON AG [DE], et al) [E] 33 * claim - *; | [I] - KIRSTEN GENEUGELIJK ET AL, "Predicting Alloreactivity in Transplantation", JOURNAL OF IMMUNOLOGY RESEARCH, (20140101), vol. 32, no. 9, doi:10.1146/annurev.immunol.23.021704.115658, ISSN 2314-8861, pages 2510 - 12, XP055201699 [I] 1-33 * Section 5; page 6 * DOI: http://dx.doi.org/10.1155/2014/159479 | Examination | WO2011030159 |