| EP3189244 - TOLERANCE RING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.09.2022 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 24.09.2021 | ||
| Former | Grant of patent is intended Status updated on 15.04.2021 | ||
| Former | Examination is in progress Status updated on 22.11.2019 | ||
| Former | Request for examination was made Status updated on 09.06.2017 | ||
| Former | The international publication has been made Status updated on 27.03.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Saint-Gobain Performance Plastics Rencol Limited Saint-Gobain House East Leake, Loughborough Leicestershire LE12 6JU / GB | [2021/44] |
| Former [2021/43] | For all designated states Saint-Gobain Performance Plastics Rencol Limited Saint-Gobain House Binley Business Park Coventry CV3 2TT / GB | Inventor(s) | 01 /
JAMES, Neil 2 Milton Road Newport Gwent NP19 8HW / GB | [2021/43] | Representative(s) | Zimmermann & Partner Patentanwälte mbB Postfach 330 920 80069 München / DE | [2021/43] | Application number, filing date | 15757481.5 | 01.09.2015 | [2021/43] | WO2015EP69934 | Priority number, date | US201462044752P | 02.09.2014 Original published format: US 201462044752 P | [2021/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016034577 | Date: | 10.03.2016 | Language: | EN | [2016/10] | Type: | A1 Application with search report | No.: | EP3189244 | Date: | 12.07.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 10.03.2016 takes the place of the publication of the European patent application. | [2017/28] | Type: | B1 Patent specification | No.: | EP3189244 | Date: | 27.10.2021 | Language: | EN | [2021/43] | Type: | B8 Corrected title page of specification | No.: | EP3189244 | Date: | 01.12.2021 | [2021/48] | Search report(s) | International search report - published on: | EP | 10.03.2016 | Classification | IPC: | F16D7/02, F16D3/77, F16D1/08 | [2021/43] | CPC: |
F16D1/0835 (EP,CN,KR,US);
F16D1/08 (CN,US);
B21D53/18 (CN,KR,US);
F16D7/021 (EP,CN,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2021/43] | Title | German: | TOLERANZRING | [2021/43] | English: | TOLERANCE RING | [2021/43] | French: | ANNEAU DE TOLERANCE | [2021/43] | Entry into regional phase | 27.03.2017 | National basic fee paid | 27.03.2017 | Designation fee(s) paid | 27.03.2017 | Examination fee paid | Examination procedure | 27.03.2017 | Examination requested [2017/28] | 27.03.2017 | Date on which the examining division has become responsible | 23.10.2017 | Amendment by applicant (claims and/or description) | 26.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 02.04.2020 | Reply to a communication from the examining division | 06.05.2020 | Despatch of a communication from the examining division (Time limit: M04) | 08.09.2020 | Reply to a communication from the examining division | 16.04.2021 | Communication of intention to grant the patent | 16.08.2021 | Fee for grant paid | 16.08.2021 | Fee for publishing/printing paid | 16.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 28.07.2022 | No opposition filed within time limit [2022/40] | Fees paid | Renewal fee | 22.09.2017 | Renewal fee patent year 03 | 21.09.2018 | Renewal fee patent year 04 | 19.09.2019 | Renewal fee patent year 05 | 17.09.2020 | Renewal fee patent year 06 | 21.09.2021 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.09.2015 | AL | 27.10.2021 | AT | 27.10.2021 | CY | 27.10.2021 | DK | 27.10.2021 | EE | 27.10.2021 | FI | 27.10.2021 | HR | 27.10.2021 | LT | 27.10.2021 | LV | 27.10.2021 | MC | 27.10.2021 | MK | 27.10.2021 | MT | 27.10.2021 | NL | 27.10.2021 | RO | 27.10.2021 | RS | 27.10.2021 | SE | 27.10.2021 | SI | 27.10.2021 | SK | 27.10.2021 | SM | 27.10.2021 | BG | 27.01.2022 | NO | 27.01.2022 | GR | 28.01.2022 | IS | 27.02.2022 | PT | 28.02.2022 | [2024/41] |
| Former [2024/27] | HU | 01.09.2015 | |
| AL | 27.10.2021 | ||
| AT | 27.10.2021 | ||
| CY | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| MK | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2024/21] | HU | 01.09.2015 | |
| AL | 27.10.2021 | ||
| AT | 27.10.2021 | ||
| CY | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2024/18] | HU | 01.09.2015 | |
| AL | 27.10.2021 | ||
| AT | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2023/22] | AL | 27.10.2021 | |
| AT | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| MC | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2023/01] | AL | 27.10.2021 | |
| AT | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SI | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/49] | AL | 27.10.2021 | |
| AT | 27.10.2021 | ||
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/35] | AT | 27.10.2021 | |
| DK | 27.10.2021 | ||
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/34] | AT | 27.10.2021 | |
| EE | 27.10.2021 | ||
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RO | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/33] | AT | 27.10.2021 | |
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| SM | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/25] | AT | 27.10.2021 | |
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| NO | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/24] | AT | 27.10.2021 | |
| FI | 27.10.2021 | ||
| HR | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| LV | 27.10.2021 | ||
| NL | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| SE | 27.10.2021 | ||
| SK | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| GR | 28.01.2022 | ||
| IS | 27.02.2022 | ||
| PT | 28.02.2022 | ||
| Former [2022/22] | AT | 27.10.2021 | |
| FI | 27.10.2021 | ||
| LT | 27.10.2021 | ||
| RS | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| Former [2022/21] | AT | 27.10.2021 | |
| RS | 27.10.2021 | ||
| BG | 27.01.2022 | ||
| Former [2022/19] | BG | 27.01.2022 | Cited in | International search | [X] EP2612998 (UNITED TECHNOLOGIES CORP et al.) [X] 1,2,5-14 * figure 3 * | [X] DE594484 (BBC BROWN BOVERI & CIE et al.) [X] 1,2,5-7,10,11,13,14 * figure 1 * | [XI] GB1036181 (ANGUS GEORGE CO LTD et al.) [X] 1,5,10 * figures 2,4 *[I] 2-4,11,13-15 | [X] US2011076096 (SLAYNE ANDREW et al.) [X] 3 * figure 1 * |