blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3118283

EP3118283 - PULVERIZED COAL FOR PIG-IRON MAKING COMPRISING COW MANURE, AND PIG-IRON PRODUCTION METHOD USING SAME [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.03.2024
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  24.03.2023
FormerGrant of patent is intended
Status updated on  15.11.2022
FormerExamination is in progress
Status updated on  09.10.2020
FormerRequest for examination was made
Status updated on  16.12.2016
FormerThe international publication has been made
Status updated on  21.11.2016
Most recent event   Tooltip24.05.2024Lapse of the patent in a contracting state
New state(s): IT
published on 26.06.2024  [2024/26]
Applicant(s)For all designated states
Hyundai Steel Company
63 Jungbong-daero
Dong-gu
Incheon 401-712 / KR
[2017/03]
Inventor(s)01 / KIM, Byong Chul
109-301
792 Sinpyeong-ro
Sinpyeong-myeon
Dangjin-si Chungcheongnam-do 343-812 / KR
02 / LEE, Hong Seug
104-1510
6216 Seohae-ro
Dangjin-si Chungcheongnam-do 343-060 / KR
03 / CHOI, Won Seok
111-1504
15 Bungmun-ro
Dangjin-si Chungcheongnam-do 343-010 / KR
 [2017/03]
Representative(s)Viering, Jentschura & Partner mbB Patent- und Rechtsanwälte
Am Brauhaus 8
01099 Dresden / DE
[2017/03]
Application number, filing date15761078.311.03.2015
[2017/03]
WO2015KR02377
Priority number, dateKR2014002855411.03.2014         Original published format: KR 20140028554
[2017/03]
Filing languageKO
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015137737
Date:17.09.2015
Language:KO
[2015/37]
Type: A1 Application with search report 
No.:EP3118283
Date:18.01.2017
Language:EN
[2017/03]
Type: B1 Patent specification 
No.:EP3118283
Date:26.04.2023
Language:EN
[2023/17]
Search report(s)International search report - published on:KR17.09.2015
(Supplementary) European search report - dispatched on:EP07.09.2017
ClassificationIPC:C10L5/00, C10L5/04, C10L5/36, C10L5/42
[2022/42]
CPC:
C10L5/04 (EP,US); C10L5/02 (KR); C21B3/02 (US);
C10L5/00 (EP,US); C10L5/366 (EP,US); C10L5/42 (EP,KR,US);
C21B13/00 (KR); C10L2250/06 (EP,US); C10L2290/08 (EP,US);
C10L2290/24 (EP,US); C10L2290/28 (EP,US); Y02E50/10 (EP,US);
Y02E50/30 (EP,US) (-)
Former IPC [2017/41]C10L5/00, C10L5/36, C10L5/42
Former IPC [2017/03]C10L5/42
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/03]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:KOHLENSTAUB ZUR ROHEISENHERSTELLUNG MIT KUHGÜLLE UND VERFAHREN ZUR HERSTELLUNG VON ROHEISEN DAMIT[2017/03]
English:PULVERIZED COAL FOR PIG-IRON MAKING COMPRISING COW MANURE, AND PIG-IRON PRODUCTION METHOD USING SAME[2017/03]
French:CHARBON PULVÉRISÉ CONTENANT DU FUMIER DE VACHE ENTRANT DANS LA FABRICATION DE LA FONTE BRUTE, ET PROCÉDÉ DE FABRICATION DE FONTE BRUTE L'UTILISANT[2017/03]
Entry into regional phase07.09.2016Translation filed 
07.09.2016National basic fee paid 
07.09.2016Search fee paid 
07.09.2016Designation fee(s) paid 
07.09.2016Examination fee paid 
Examination procedure07.09.2016Examination requested  [2017/03]
07.09.2016Date on which the examining division has become responsible
25.03.2018Amendment by applicant (claims and/or description)
09.10.2020Despatch of a communication from the examining division (Time limit: M04)
08.02.2021Reply to a communication from the examining division
16.11.2022Communication of intention to grant the patent
15.03.2023Fee for grant paid
15.03.2023Fee for publishing/printing paid
15.03.2023Receipt of the translation of the claim(s)
Opposition(s)29.01.2024No opposition filed within time limit [2024/14]
Fees paidRenewal fee
20.01.2017Renewal fee patent year 03
16.01.2018Renewal fee patent year 04
29.03.2019Renewal fee patent year 05
31.03.2020Renewal fee patent year 06
10.03.2021Renewal fee patent year 07
24.02.2022Renewal fee patent year 08
12.01.2023Renewal fee patent year 09
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipCZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
IT26.04.2023
LT26.04.2023
LV26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
[2024/26]
Former [2024/24]CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SI26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/10]CZ26.04.2023
DK26.04.2023
EE26.04.2023
ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
PL26.04.2023
RO26.04.2023
RS26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/08]ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
PL26.04.2023
RS26.04.2023
SK26.04.2023
SM26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/03]ES26.04.2023
FI26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
PL26.04.2023
RS26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2024/01]ES26.04.2023
HR26.04.2023
LT26.04.2023
LV26.04.2023
PL26.04.2023
RS26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/51]ES26.04.2023
HR26.04.2023
PL26.04.2023
RS26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/50]ES26.04.2023
PL26.04.2023
NO26.07.2023
GR27.07.2023
IS26.08.2023
PT28.08.2023
Former [2023/48]ES26.04.2023
NO26.07.2023
PT28.08.2023
Former [2023/46]ES26.04.2023
PT28.08.2023
Documents cited:Search[A]US48439  (REDLICH HENRY) [A] 1-6 * the whole document *;
 [A]US712635  (BARTLETT JAMES F [US]) [A] 1-6 * the whole document *;
 [A]US881192  (MANNEWITZ AUGUST M [US]) [A] 1-6 * the whole document *;
 [IA]DE4123368  (BERGWERKSVERBAND GMBH) [I] 1,2 * column 1, line 3 - line 8 * * column 2, line 61 - column 4, line 5 * * example -; claim - * [A] 3-6;
 [A]  - JOHN G MATHIESON ET AL, "Potential for the use of biomass in the iron and steel industry", CHEMECA 2011: ENGINEERING A BETTER WORLD: SYDNEY HILTON HOTEL, NSW, AUSTRALIA, 18-21 SEPTEMBER 2011, Barton, A.C.T, (20110101), ISBN 978-0-85825-967-6, pages 1065 - 1076, XP055402453 [A] 1-6 * abstract *
International search[X]KR20130134275  (BK CO., LTD.) [X] 1-6 * See abstract; paragraphs [0020]-[0074], [0101]-[0144]; claims 2-3, 13 and figures 1-6. *;
 [A]KR20120069765  (JFE STEEL CORP) [A] 1-6 * See abstract; paragraphs [0026]-[0048]; claims 1-4, 8 and figure 1. *;
 [A]KR20120069766  (JFE STEEL CORP) [A] 1-6 * See abstract; paragraphs [0026]-[0060]; claims 1-2, 8-10 and figures 1-6. *;
 [A]JP2010037420  (NIPPON STEEL ENG CO., LTD) [A] 1-6 * See abstract; paragraphs [0030]-[0058]; claims 1-2, 8, 14 and figures 1-4. *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.