blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3104581

EP3104581 - MESSAGE PROCESSING METHOD AND ACCESS CONTROLLER [Right-click to bookmark this link]
Former [2016/50]MESSAGE PROCESSING METHOD, ACCESS CONTROLLER AND NETWORK NODE
[2021/04]
StatusNo opposition filed within time limit
Status updated on  06.05.2022
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  28.05.2021
FormerGrant of patent is intended
Status updated on  04.02.2021
FormerExamination is in progress
Status updated on  15.03.2019
FormerRequest for examination was made
Status updated on  11.11.2016
Most recent event   Tooltip14.06.2024Lapse of the patent in a contracting state
New state(s): TR
published on 17.07.2024  [2024/29]
Applicant(s)For all designated states
Huawei Technologies Co., Ltd.
Huawei Administration Building
Bantian
Longgang District
Shenzhen, Guangdong 518129 / CN
[2016/50]
Inventor(s)01 / ZHENG, Ruobin
Huawei Administration Building
Bantian
Longgang District
Shenzhen Guangdong 518129 / CN
 [2016/50]
Representative(s)Maiwald GmbH
Elisenhof
Elisenstraße 3
80335 München / DE
[N/P]
Former [2021/26]Maiwald Patent- und Rechtsanwaltsgesellschaft mbH
Elisenhof
Elisenstraße 3
80335 München / DE
Former [2016/50]Maiwald Patentanwalts GmbH
Engineering
Elisenhof
Elisenstrasse 3
80335 München / DE
Application number, filing date15761952.926.02.2015
[2016/50]
WO2015CN73304
Priority number, dateCN2014108800011.03.2014         Original published format: CN201410088000
[2016/50]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2015135425
Date:17.09.2015
Language:ZH
[2015/37]
Type: A1 Application with search report 
No.:EP3104581
Date:14.12.2016
Language:EN
[2016/50]
Type: B1 Patent specification 
No.:EP3104581
Date:30.06.2021
Language:EN
[2021/26]
Search report(s)International search report - published on:CN17.09.2015
(Supplementary) European search report - dispatched on:EP21.06.2017
ClassificationIPC:H04L29/12, H04L29/06
[2016/50]
CPC:
H04L61/5014 (EP,US); H04L61/503 (US); H04L61/103 (US);
H04L63/0892 (US); H04L63/10 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2016/50]
Extension statesBANot yet paid
MENot yet paid
TitleGerman:NACHRICHTENVERARBEITUNGSVERFAHREN UND ZUGANGSSTEUERGERÄT[2021/04]
English:MESSAGE PROCESSING METHOD AND ACCESS CONTROLLER[2021/04]
French:PROCÉDÉ DE TRAITEMENT DE MESSAGE ET CONTRÔLEUR D'ACCÈS[2021/04]
Former [2016/50]NACHRICHTENVERARBEITUNGSVERFAHREN, ZUGANGSSTEUERGERÄT UND NETZWERKKNOTEN
Former [2016/50]MESSAGE PROCESSING METHOD, ACCESS CONTROLLER AND NETWORK NODE
Former [2016/50]PROCÉDÉ DE TRAITEMENT DE MESSAGE, CONTRÔLEUR D'ACCÈS ET NOEUD DE RÉSEAU
Entry into regional phase06.09.2016Translation filed 
06.09.2016National basic fee paid 
06.09.2016Search fee paid 
06.09.2016Designation fee(s) paid 
06.09.2016Examination fee paid 
Examination procedure06.09.2016Examination requested  [2016/50]
06.09.2016Date on which the examining division has become responsible
05.01.2018Amendment by applicant (claims and/or description)
19.03.2019Despatch of a communication from the examining division (Time limit: M04)
29.07.2019Reply to a communication from the examining division
09.07.2020Despatch of a communication from the examining division (Time limit: M04)
04.11.2020Reply to a communication from the examining division
17.11.2020Despatch of a communication from the examining division (Time limit: M01)
21.12.2020Reply to a communication from the examining division
05.02.2021Communication of intention to grant the patent
20.05.2021Receipt of the translation of the claim(s)
23.05.2021Fee for grant paid
23.05.2021Fee for publishing/printing paid
Divisional application(s)EP21171842.4  / EP3930294
Opposition(s)31.03.2022No opposition filed within time limit [2022/23]
Fees paidRenewal fee
28.02.2017Renewal fee patent year 03
15.02.2018Renewal fee patent year 04
28.02.2019Renewal fee patent year 05
25.02.2020Renewal fee patent year 06
26.02.2021Renewal fee patent year 07
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU26.02.2015
AL30.06.2021
AT30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
MK30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
TR30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
[2024/29]
Former [2024/22]HU26.02.2015
AL30.06.2021
AT30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
MK30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2024/20]HU26.02.2015
AL30.06.2021
AT30.06.2021
CY30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2024/18]HU26.02.2015
AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/19]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LT30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/10]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE26.02.2022
LU26.02.2022
BE28.02.2022
CH28.02.2022
LI28.02.2022
Former [2023/09]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
IE26.02.2022
LU26.02.2022
CH28.02.2022
LI28.02.2022
Former [2022/47]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
LU26.02.2022
Former [2022/44]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
MC30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/29]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SI30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/26]AL30.06.2021
AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/21]AT30.06.2021
CZ30.06.2021
DK30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/10]AT30.06.2021
CZ30.06.2021
EE30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
PL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
IS30.10.2021
PT02.11.2021
Former [2022/09]AT30.06.2021
CZ30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RO30.06.2021
RS30.06.2021
SE30.06.2021
SK30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
PT02.11.2021
Former [2022/07]AT30.06.2021
FI30.06.2021
HR30.06.2021
LV30.06.2021
NL30.06.2021
RS30.06.2021
SE30.06.2021
SM30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/51]FI30.06.2021
HR30.06.2021
LV30.06.2021
RS30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/49]FI30.06.2021
HR30.06.2021
LV30.06.2021
SE30.06.2021
BG30.09.2021
NO30.09.2021
GR01.10.2021
Former [2021/47]FI30.06.2021
BG30.09.2021
Former [2021/46]FI30.06.2021
Documents cited:Search[A]US2007076607  (VOIT ERIC [US], et al) [A] 1-16 * paragraph [0031] - paragraph [0032] * * paragraph [0041] - paragraph [0042] *;
 [X]US2011002342  (ZHENG RUOBIN [CN]) [X] 1-16 * paragraph [0118] - paragraph [0180] *;
 [A]WO2012163178  (HUAWEI TECH CO LTD [CN], et al) [A] 1-16 * abstract *;
 [P]US2014143428  (ZHENG RUOBIN [CN])
International search[A]CN1984499  (HUAWEI TECH CO LTD [CN]) [A] 1-22 * , the whole document *;
 [A]CN101516048  (FIBERHOME TELECOMM TECH CO LTD [CN]) [A] 1-22* , the whole document *;
 [X]CN102088391  (HUAWEI TECH CO LTD) [X] 1, 5-12, 16-22 * , claims 1-23, and description, paragraphs [0037]-[0067], [0173]-[0198] and [0230]-[0258] *;
 [A]CN103210630  (ERICSSON TELEFON AB L M) [A] 1-22 * , the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.