| EP3146445 - CONTINUATION OF PLAYBACK OF MEDIA CONTENT BY DIFFERENT OUTPUT DEVICES [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.01.2023 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 11.02.2022 | ||
| Former | Grant of patent is intended Status updated on 21.10.2021 | ||
| Former | Examination is in progress Status updated on 16.02.2019 | ||
| Former | Request for examination was made Status updated on 24.02.2017 | ||
| Former | The international publication has been made Status updated on 21.12.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Google LLC 1600 Amphitheatre Parkway Mountain View, CA 94043 / US | [2022/11] |
| Former [2017/45] | For all designated states Google LLC 1600 Amphitheatre Parkway Mountain View, CA 94043 / US | ||
| Former [2017/13] | For all designated states Google Inc. 1600 Amphitheatre Parkway Mountain View, CA 94043 / US | Inventor(s) | 01 /
LEWIS, Justin 1600 Amphitheatre Parkway Mountain View, CA 94043 / US | 02 /
PAUN, Ruxandra, Geogiana 1600 Amphitheatre Parkway Mountain View, CA 94043 / US | [2017/13] | Representative(s) | Maikowski & Ninnemann Patentanwälte Partnerschaft mbB Kurfürstendamm 54-55 10707 Berlin / DE | [2022/11] |
| Former [2017/13] | Betten & Resch Patent- und Rechtsanwälte PartGmbB Maximiliansplatz 14 80333 München / DE | Application number, filing date | 15764024.4 | 02.09.2015 | [2017/13] | WO2015US48144 | Priority number, date | US201414488260 | 16.09.2014 Original published format: US201414488260 | [2017/13] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016043976 | Date: | 24.03.2016 | Language: | EN | [2016/12] | Type: | A1 Application with search report | No.: | EP3146445 | Date: | 29.03.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 24.03.2016 takes the place of the publication of the European patent application. | [2017/13] | Type: | B1 Patent specification | No.: | EP3146445 | Date: | 16.03.2022 | Language: | EN | [2022/11] | Search report(s) | International search report - published on: | EP | 24.03.2016 | Classification | IPC: | G06F16/487 | [2021/45] | CPC: |
G06F16/487 (EP,CN,US);
G06F3/04842 (US);
G06F3/011 (US);
H04L65/60 (US)
|
| Former IPC [2017/13] | G06F17/30 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/13] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | FORTSETZUNG DER WIEDERGABE VON MEDIENINHALT AUF VERSCHIEDENEN AUSGABEGERÄTEN | [2021/45] | English: | CONTINUATION OF PLAYBACK OF MEDIA CONTENT BY DIFFERENT OUTPUT DEVICES | [2017/13] | French: | POURSUITE DE LA LECTURE DE CONTENUS MÉDIA PAR DIFFÉRENTS DISPOSITIFS DE SORTIE | [2021/45] |
| Former [2017/13] | FORTSETZUNG DER WIEDERGABE VON MEDIENINHALT DURCH UNTERSCHIEDLICHE AUSGABEVORRICHTUNGEN | ||
| Former [2017/13] | CONTINUATION DE REPRODUCTION D'UN CONTENU DE MÉDIA PAR DES DISPOSITIFS DE SORTIE DIFFÉRENTS | Entry into regional phase | 21.12.2016 | National basic fee paid | 21.12.2016 | Designation fee(s) paid | 21.12.2016 | Examination fee paid | Examination procedure | 21.12.2016 | Amendment by applicant (claims and/or description) | 21.12.2016 | Examination requested [2017/13] | 21.12.2016 | Date on which the examining division has become responsible | 20.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 12.06.2019 | Reply to a communication from the examining division | 14.12.2020 | Despatch of a communication from the examining division (Time limit: M04) | 09.04.2021 | Reply to a communication from the examining division | 21.10.2021 | Communication of intention to grant the patent | 07.02.2022 | Fee for grant paid | 07.02.2022 | Fee for publishing/printing paid | 07.02.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22162235.0 / EP4033375 | Opposition(s) | 19.12.2022 | No opposition filed within time limit [2023/08] | Fees paid | Renewal fee | 27.09.2017 | Renewal fee patent year 03 | 27.09.2018 | Renewal fee patent year 04 | 27.09.2019 | Renewal fee patent year 05 | 28.09.2020 | Renewal fee patent year 06 | 27.09.2021 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 02.09.2015 | AL | 16.03.2022 | AT | 16.03.2022 | CY | 16.03.2022 | CZ | 16.03.2022 | DK | 16.03.2022 | EE | 16.03.2022 | ES | 16.03.2022 | FI | 16.03.2022 | HR | 16.03.2022 | IT | 16.03.2022 | LT | 16.03.2022 | LV | 16.03.2022 | MC | 16.03.2022 | MK | 16.03.2022 | MT | 16.03.2022 | PL | 16.03.2022 | RO | 16.03.2022 | RS | 16.03.2022 | SE | 16.03.2022 | SI | 16.03.2022 | SK | 16.03.2022 | SM | 16.03.2022 | TR | 16.03.2022 | BG | 16.06.2022 | NO | 16.06.2022 | GR | 17.06.2022 | IS | 16.07.2022 | PT | 18.07.2022 | IE | 02.09.2022 | LU | 02.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | LI | 30.09.2022 | [2026/04] |
| Former [2024/41] | HU | 02.09.2015 | |
| AL | 16.03.2022 | ||
| AT | 16.03.2022 | ||
| CY | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| IT | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| MK | 16.03.2022 | ||
| MT | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| IE | 02.09.2022 | ||
| LU | 02.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2024/27] | HU | 02.09.2015 | |
| AL | 16.03.2022 | ||
| AT | 16.03.2022 | ||
| CY | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| IT | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| MK | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| IE | 02.09.2022 | ||
| LU | 02.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2024/21] | HU | 02.09.2015 | |
| AL | 16.03.2022 | ||
| AT | 16.03.2022 | ||
| CY | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| IT | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| IE | 02.09.2022 | ||
| LU | 02.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2024/18] | HU | 02.09.2015 | |
| AL | 16.03.2022 | ||
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| IT | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| IE | 02.09.2022 | ||
| LU | 02.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2023/42] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| IT | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| IE | 02.09.2022 | ||
| LU | 02.09.2022 | ||
| BE | 30.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2023/35] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| IT | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| IE | 02.09.2022 | ||
| LU | 02.09.2022 | ||
| CH | 30.09.2022 | ||
| LI | 30.09.2022 | ||
| Former [2023/33] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| IE | 02.09.2022 | ||
| LU | 02.09.2022 | ||
| Former [2023/30] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| LU | 02.09.2022 | ||
| Former [2023/22] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| MC | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| Former [2023/10] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SI | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| Former [2023/07] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| DK | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| Former [2023/01] | AL | 16.03.2022 | |
| AT | 16.03.2022 | ||
| CZ | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| Former [2022/51] | AT | 16.03.2022 | |
| CZ | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| IS | 16.07.2022 | ||
| PT | 18.07.2022 | ||
| Former [2022/50] | AT | 16.03.2022 | |
| CZ | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| PL | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| PT | 18.07.2022 | ||
| Former [2022/49] | AT | 16.03.2022 | |
| CZ | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SK | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| PT | 18.07.2022 | ||
| Former [2022/48] | AT | 16.03.2022 | |
| CZ | 16.03.2022 | ||
| EE | 16.03.2022 | ||
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| PT | 18.07.2022 | ||
| Former [2022/47] | AT | 16.03.2022 | |
| ES | 16.03.2022 | ||
| FI | 16.03.2022 | ||
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| RO | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| SM | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| PT | 18.07.2022 | ||
| Former [2022/39] | FI | 16.03.2022 | |
| HR | 16.03.2022 | ||
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| Former [2022/36] | HR | 16.03.2022 | |
| LT | 16.03.2022 | ||
| LV | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| GR | 17.06.2022 | ||
| Former [2022/35] | HR | 16.03.2022 | |
| LT | 16.03.2022 | ||
| RS | 16.03.2022 | ||
| SE | 16.03.2022 | ||
| BG | 16.06.2022 | ||
| NO | 16.06.2022 | ||
| Former [2022/33] | LT | 16.03.2022 | |
| NO | 16.06.2022 | Cited in | International search | [Y] EP2582146 (SONY MOBILE COMM AB et al.) [Y] 1-20 * abstract * * paragraph [0004] - paragraph [0011] * * paragraph [0024] - paragraph [0028] * * paragraph [0036] - paragraph [0038] * * figure 2 * | [XI] YI CUI ET AL: "Seamless User-Level Handoff in Ubiquitous Multimedia Service Delivery", MULTIMEDIA TOOLS AND APPLICATIONS, KLUWER ACADEMIC PUBLISHERS, BO, vol. 22, no. 2, 1 February 2004 (2004-02-01), pages 137 - 170, XP019213823, ISSN: 1573-7721, DOI: 10.1023/B:MTAP.0000011932.28891.A0 [X] 1-5,7,8,16 * abstract * * page 150, line 1 - line 23 * * page 158, line 5 - page 159, line 4 * * page 142, line 1 - line 6 * * table 1 * * page 145, line 1 - line 15 * * page 147, line 3 - line 16 * * page 159, line 16 - page 160, line 5 * * figures 9,16,17 * [I] 6,9-15,17-20 DOI: http://dx.doi.org/10.1023/B:MTAP.0000011932.28891.a0 | [Y] RAWASHDEH M ET AL: "Seamless video handoff in session mobility over the IMS network", WORLD OF WIRELESS, MOBILE AND MULTIMEDIA NETWORKS&WORKSHOPS, 2009. WOWMOM 2009. IEEE INTERNATIONAL SYMPOSIUM ON A, IEEE, PISCATAWAY, NJ, USA, 15 June 2009 (2009-06-15), pages 1 - 6, XP031543613, ISBN: 978-1-4244-4440-3 [Y] 1-20 * abstract * * Section 3.1 * * Section 4 * * Section 5 * * figures 3,4 * | [A] XU MINGQIANG DAISAKU KOMIYA SACHIKO KAWAGUCHI MAHFUZUR RAHMAN BRIJESH KUMAR PANASONIC: "Buffer Handling Media Attribute in Session Description Protocol (SDP) for Seamless Session Mobility; draft-mingqiang-mmusic-session-mobility-attribute-00.txt", 5. JCT-VC MEETING; 96. MPEG MEETING; 16-3-2011 - 23-3-2011; GENEVA; (JOINT COLLABORATIVE TEAM ON VIDEO CODING OF ISO/IEC JTC1/SC29/WG11 AND ITU-T SG.16 ); URL: HTTP://WFTP3.ITU.INT/AV-ARCH/JCTVC-SITE/, INTERNET ENGINEERING TASK FORCE, IETF, CH, 31 March 2005 (2005-03-31), XP015039435, ISSN: 0000-0004 [A] 1-20 * the whole document * | Examination | GB2499494 |