blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3192230

EP3192230 - SYSTEM AND METHOD FOR PROVIDING AN INTEGRATED FIREWALL FOR SECURE NETWORK COMMUNICATION IN A MULTI-TENANT ENVIRONMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  13.09.2019
Database last updated on 05.10.2024
FormerThe patent has been granted
Status updated on  05.10.2018
FormerGrant of patent is intended
Status updated on  30.05.2018
FormerRequest for examination was made
Status updated on  16.06.2017
FormerThe international publication has been made
Status updated on  20.03.2017
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Oracle International Corporation
500 Oracle Parkway
M/S 5OP7
Redwood Shores, California 94065 / US
[2017/29]
Inventor(s)01 / MAKHERVAKS, Vadim
14000 SE 64th Street
Bellevue, Washington 98006 / US
02 / MOUSSEAU, Richard P.
32 Pinewood Drive
Stratham, New Hampshire 03885 / US
03 / JOHNSEN, Bjørn Dag
Vilberggrenda 9
N-0687 Oslo / NO
04 / CHATTERJEE, Sumanta
3183 Belmont Terrace
Fremont California 94539 / US
05 / PANT, Avneesh
500 Oracle Parkway
Redwood Shores, California 94065 / US
06 / DE LAVARENE, Jean
16 Rue du Maréchal de Lattre de Tassigny
78000 Versailles / FR
07 / PATEL, Kant C.
34215 Mimosa Terrace
Fremont, California 94555 / US
08 / MATHUR, Bhaskar
E-004
Concorde Manhattans
Opp Wipro Gate 16
Electronic City Phase 1
Bangalore 560076 / IN
09 / KHAN, Feroz Alam
B-501
Nagarjuna Maple Heights
Outer Ring Road
B Narayanapura
Bangalore 560076 / IN
10 / REGUNA, Sudeep Vatsanath
No 7/3 D&F Block
Khan Bahadur Abdul Rahman
Austin Town
Bangalore 560047 / IN
 [2018/45]
Former [2017/29]01 / MAKHERVAKS, Vadim
14000 SE 64th Street
Bellevue, Washington 98006 / US
02 / MOUSSEAU, Richard P.
32 Pinewood Drive
Stratham, New Hampshire 03885 / US
03 / JOHNSEN, Bjørn Dag
Vilberggrenda 9
N-0687 Oslo / NO
04 / CHATTERJEE, Sumanta
3183 Belmont Terrace
Fremont California 94539 / US
05 / PANT, Avneesh
500 Oracle Parkway
Redwood Shores, California 94065 / US
06 / DE LAVARENE, Jean
81 Rue Aristide Briand
F-92300 Levallois Perret / FR
07 / PATEL, Kant C.
34215 Mimosa Terrace
Fremont, California 94555 / US
08 / MATHUR, Bhaskar
E-004
Concorde Manhattans
Opp Wipro Gate 16
Electronic City Phase 1
Bangalore 560076 / IN
09 / KHAN, Feroz Alam
B-501
Nagarjuna Maple Heights
Outer Ring Road
B Narayanapura
Bangalore 560076 / IN
10 / REGUNA, Sudeep Vatsanath
No 7/3 D&F Block
Khan Bahadur Abdul Rahman
Austin Town
Bangalore 560047 / IN
Representative(s)D Young & Co LLP
3 Noble Street
London EC2V 7BQ / GB
[N/P]
Former [2017/29]D Young & Co LLP
120 Holborn
London EC1N 2DY / GB
Application number, filing date15767397.109.09.2015
[2017/29]
WO2015US49193
Priority number, dateUS201462048096P09.09.2014         Original published format: US 201462048096 P
US20151484810908.09.2015         Original published format: US201514848109
US20151484811108.09.2015         Original published format: US201514848111
[2017/29]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016040485
Date:17.03.2016
Language:EN
[2016/11]
Type: A1 Application with search report 
No.:EP3192230
Date:19.07.2017
Language:EN
The application published by WIPO in one of the EPO official languages on 17.03.2016 takes the place of the publication of the European patent application.
[2017/29]
Type: B1 Patent specification 
No.:EP3192230
Date:07.11.2018
Language:EN
[2018/45]
Search report(s)International search report - published on:EP17.03.2016
ClassificationIPC:H04L29/06
[2017/29]
CPC:
H04L63/101 (EP,CN,KR,US); H04L63/0236 (EP,CN,KR,US); H04L63/0254 (EP,CN,KR,US);
H04L63/1458 (EP,CN,KR,US); H04L63/20 (KR,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/29]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:SYSTEM UND VERFAHREN ZUR BEREITSTELLUNG EINER INTEGRIERTEN FIREWALL FÜR SICHERE NETZWERKKOMMUNIKATION IN EINER MANDANTENFÄHIGEN UMGEBUNG[2017/29]
English:SYSTEM AND METHOD FOR PROVIDING AN INTEGRATED FIREWALL FOR SECURE NETWORK COMMUNICATION IN A MULTI-TENANT ENVIRONMENT[2017/29]
French:SYSTÈME ET PROCÉDÉ POUR FOURNIR UN PARE-FEU INTÉGRÉ POUR DES COMMUNICATIONS DE RÉSEAU SÉCURISÉES DANS UN ENVIRONNEMENT À PLUSIEURS DÉTENTEURS[2017/29]
Entry into regional phase10.04.2017National basic fee paid 
10.04.2017Designation fee(s) paid 
10.04.2017Examination fee paid 
Examination procedure20.03.2017Date on which the examining division has become responsible
10.04.2017Examination requested  [2017/29]
27.10.2017Amendment by applicant (claims and/or description)
31.05.2018Communication of intention to grant the patent
12.09.2018Receipt of the translation of the claim(s)
28.09.2018Fee for grant paid
28.09.2018Fee for publishing/printing paid
Opposition(s)08.08.2019No opposition filed within time limit [2019/42]
Fees paidRenewal fee
12.09.2017Renewal fee patent year 03
11.09.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.09.2015
AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MK07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
[2022/31]
Former [2021/34]HU09.09.2015
AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
MT07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2021/32]HU09.09.2015
AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2021/26]AL07.11.2018
AT07.11.2018
CY07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2020/25]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
MC07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2020/17]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
TR07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/50]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SI07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/40]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SK07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/37]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
EE07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RO07.11.2018
RS07.11.2018
SE07.11.2018
SM07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/35]AL07.11.2018
AT07.11.2018
CZ07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
PL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/34]AL07.11.2018
AT07.11.2018
DK07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
IT07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/26]AL07.11.2018
AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
PT07.03.2019
Former [2019/25]AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
RS07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/24]AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
SE07.11.2018
BG07.02.2019
NO07.02.2019
GR08.02.2019
IS07.03.2019
Former [2019/23]AT07.11.2018
ES07.11.2018
FI07.11.2018
HR07.11.2018
LT07.11.2018
LV07.11.2018
NL07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/22]FI07.11.2018
LT07.11.2018
BG07.02.2019
NO07.02.2019
IS07.03.2019
Former [2019/21]FI07.11.2018
LT07.11.2018
NO07.02.2019
IS07.03.2019
Former [2019/20]LT07.11.2018
NO07.02.2019
Cited inInternational search[A]US2010037309  (DARGIS ANTHONY [US]) [A] 1-21 * abstract * * page 1, paragraph 4 * * page 2, paragraph 17 - page 3, paragraph 33 * * claims 1-20 *;
 [A]US2012284786  (SOMANI HANIFF [US], et al) [A] 1-21 * abstract * * page 1, paragraph 7 - page 2, paragraph 28 ** claims 1-18 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.