EP3124282 - COUNTERFEIT PREVENTION MEDIUM, AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 23.10.2020 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 15.11.2019 | ||
Former | Grant of patent is intended Status updated on 04.08.2019 | ||
Former | Request for examination was made Status updated on 30.12.2016 | ||
Former | The international publication has been made Status updated on 06.12.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Toppan Printing Co., Ltd. 5-1, Taito 1-chome Taito-ku Tokyo 110-0016 / JP | [2017/05] | Inventor(s) | 01 /
OKAWA, Mihoko c/o TOPPAN PRINTING CO. LTD. 5-1 Taito 1-chome Taito-ku Tokyo 110-0016 / JP | 02 /
OCHIAI, Hideki c/o TOPPAN PRINTING CO. LTD. 5-1 Taito 1-chome Taito-ku Tokyo 110-0016 / JP | 03 /
ICHIKAWA, Koji c/o TOPPAN PRINTING CO. LTD. 5-1 Taito 1-chome Taito-ku Tokyo 110-0016 / JP | 04 /
KOTEGAWA, Yuki c/o TOPPAN PRINTING CO. LTD. 5-1 Taito 1-chome Taito-ku Tokyo 1100016 / JP | [2017/05] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2017/05] | Application number, filing date | 15768882.1 | 26.03.2015 | [2017/05] | WO2015JP59402 | Priority number, date | JP20140063729 | 26.03.2014 Original published format: JP 2014063729 | [2017/05] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015147176 | Date: | 01.10.2015 | Language: | JA | [2015/39] | Type: | A1 Application with search report | No.: | EP3124282 | Date: | 01.02.2017 | Language: | EN | [2017/05] | Type: | B1 Patent specification | No.: | EP3124282 | Date: | 18.12.2019 | Language: | EN | [2019/51] | Search report(s) | International search report - published on: | JP | 01.10.2015 | (Supplementary) European search report - dispatched on: | EP | 13.02.2018 | Classification | IPC: | B42D25/391, B42D25/364, B42D25/23, B42D25/24, B42D25/29, B42D25/40, B42D25/41, B42D25/47, B41M5/26, G02B5/30 | [2018/11] | CPC: |
B42D25/364 (EP,US);
B42D25/30 (CN);
B41M3/14 (EP,US);
B42D25/21 (US);
B42D25/23 (EP,US);
B42D25/24 (EP,US);
B42D25/29 (EP,US);
B42D25/36 (EP,US);
B42D25/378 (EP,US);
B42D25/382 (US);
B42D25/387 (US);
B42D25/391 (EP,US);
B42D25/40 (CN);
B42D25/41 (EP,US);
B42D25/435 (US);
B42D25/47 (EP,US);
G02B5/30 (US);
G02B5/3016 (CN,US);
|
Former IPC [2017/47] | B42D25/391, B42D25/364, B42D25/23, B42D25/24, B42D25/40, B42D25/41, B42D25/47, B41M5/26, G02B5/30 | ||
Former IPC [2017/05] | B42D25/364, B41M5/26, B42D25/40, B42D25/41, G02B5/30 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | FÄLSCHUNGSSCHUTZMEDIUM UND VERFAHREN ZUR HERSTELLUNG DAVON | [2017/05] | English: | COUNTERFEIT PREVENTION MEDIUM, AND METHOD FOR MANUFACTURING SAME | [2017/05] | French: | SUPPORT A PREVENTION DE CONTREFAÇON, ET SON PROCÉDÉ DE FABRICATION | [2017/05] | Entry into regional phase | 31.03.2016 | Translation filed | 31.03.2016 | National basic fee paid | 31.03.2016 | Search fee paid | 31.03.2016 | Designation fee(s) paid | 31.03.2016 | Examination fee paid | Examination procedure | 31.03.2016 | Examination requested [2017/05] | 31.03.2016 | Date on which the examining division has become responsible | 03.09.2018 | Amendment by applicant (claims and/or description) | 05.08.2019 | Communication of intention to grant the patent | 08.11.2019 | Fee for grant paid | 08.11.2019 | Fee for publishing/printing paid | 08.11.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 21.09.2020 | No opposition filed within time limit [2020/48] | Fees paid | Renewal fee | 13.03.2017 | Renewal fee patent year 03 | 21.03.2018 | Renewal fee patent year 04 | 15.03.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 26.03.2015 | AL | 18.12.2019 | AT | 18.12.2019 | CY | 18.12.2019 | CZ | 18.12.2019 | DK | 18.12.2019 | EE | 18.12.2019 | ES | 18.12.2019 | FI | 18.12.2019 | HR | 18.12.2019 | IT | 18.12.2019 | LT | 18.12.2019 | LV | 18.12.2019 | MC | 18.12.2019 | MK | 18.12.2019 | MT | 18.12.2019 | NL | 18.12.2019 | PL | 18.12.2019 | RO | 18.12.2019 | RS | 18.12.2019 | SE | 18.12.2019 | SI | 18.12.2019 | SK | 18.12.2019 | SM | 18.12.2019 | TR | 18.12.2019 | BG | 18.03.2020 | NO | 18.03.2020 | GR | 19.03.2020 | IE | 26.03.2020 | LU | 26.03.2020 | BE | 31.03.2020 | IS | 18.04.2020 | PT | 13.05.2020 | [2022/32] |
Former [2022/27] | HU | 26.03.2015 | |
AL | 18.12.2019 | ||
AT | 18.12.2019 | ||
CY | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
IT | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
MT | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
TR | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IE | 26.03.2020 | ||
LU | 26.03.2020 | ||
BE | 31.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2021/10] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
IT | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
PL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IE | 26.03.2020 | ||
LU | 26.03.2020 | ||
BE | 31.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2021/08] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IE | 26.03.2020 | ||
LU | 26.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2021/04] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
LU | 26.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/50] | AL | 18.12.2019 | |
AT | 18.12.2019 | ||
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
MC | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SI | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/47] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
DK | 18.12.2019 | ||
EE | 18.12.2019 | ||
ES | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/40] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
IS | 18.04.2020 | ||
PT | 13.05.2020 | ||
Former [2020/37] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
SK | 18.12.2019 | ||
SM | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/36] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
EE | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
PT | 13.05.2020 | ||
Former [2020/35] | AL | 18.12.2019 | |
CZ | 18.12.2019 | ||
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RO | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/32] | AL | 18.12.2019 | |
FI | 18.12.2019 | ||
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
NL | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/25] | FI | 18.12.2019 | |
HR | 18.12.2019 | ||
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
RS | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/23] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
LV | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
GR | 19.03.2020 | ||
Former [2020/22] | FI | 18.12.2019 | |
LT | 18.12.2019 | ||
SE | 18.12.2019 | ||
BG | 18.03.2020 | ||
NO | 18.03.2020 | ||
Former [2020/21] | NO | 18.03.2020 | Documents cited: | Search | [Y]EP0980536 (ROLIC AG [CH]) [Y] 2,4-6 * paragraph [0027] - paragraph [0084]; figures 1,2,4-12; claims 1-5 *; | [XY]EP1189079 (TOPPAN PRINTING CO LTD [JP]) [X] 1,3,7 * paragraph [0046] - paragraph [0196]; figures 1-22; claims 1-31 * [Y] 2,4-6; | [XY]WO2006018172 (GIESECKE & DEVRIENT GMBH [DE], et al) [X] 1,3,7 * page 10, line 6 - page 37, line 20; figures 1-9, 13; claims 1-46 * [Y] 2,4-6,10; | [XY]US2008250954 (DEPTA GEORG [DE], et al) [X] 8,9 * paragraph [0009] - paragraph [0070]; figures 1-14; claims 1-38 * [Y] 10; | [Y]US2009008926 (DEPTA GEORG [DE], et al) [Y] 10* paragraph [0053] - paragraph [0078]; figures 1-3; claim 1 * | International search | [A]JP2000242748 (DAINIPPON PRINTING CO LTD) [A] 1-10 * , paragraph [0047]; fig. 8 (Family: none) *; | [A]JP2001239762 (RICOH KK) [A] 1-10 * , entire text; all drawings (Family: none) *; | [A]JP2007001130 (NITTO DENKO CORP, et al) [A] 1-10* , paragraph [0004] & US 2010/0123943 A1 & WO 2006/137442 A1 & EP 1900509 A1 & KR 10-2008-0007596 A & CN 101218090 A & KR 10-0934886 B1 * |