Extract from the Register of European Patents

EP About this file: EP3357090

EP3357090 - ELECTROSTATIC DISCHARGE PROTECTION DEVICE AND CIRCUIT APPARATUS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  23.04.2021
Database last updated on 26.03.2026
FormerThe patent has been granted
Status updated on  15.05.2020
FormerGrant of patent is intended
Status updated on  19.01.2020
FormerRequest for examination was made
Status updated on  06.07.2018
FormerThe international publication has been made
Status updated on  08.04.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
TDK Corporation
3-9-1, Shibaura
Minato-ku
Tokyo 108-0023 / JP
[2018/32]
Inventor(s)01 / ZOU, Lei
Marathonvej 2, 1.1
2300 København S / DK
02 / ROCCA, Gino
Havneholmen 62 1MF
1561 Copenhagen / DK
 [2020/25]
Former [2018/32]01 / ZOU, Lei
Marathonvej 2, 1.1
2300 København S. / DK
02 / ROCCA, Gino
Havneholmen 62 1MF
DK-1561 Copenhagen / DK
Representative(s)Epping - Hermann - Fischer
Patentanwaltsgesellschaft mbH
Schloßschmidstraße 5
80639 München / DE
[2018/32]
Application number, filing date15771590.529.09.2015
[2018/32]
WO2015EP72449
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017054849
Date:06.04.2017
Language:EN
[2017/14]
Type: A1 Application with search report 
No.:EP3357090
Date:08.08.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 06.04.2017 takes the place of the publication of the European patent application.
[2018/32]
Type: B1 Patent specification 
No.:EP3357090
Date:17.06.2020
Language:EN
[2020/25]
Search report(s)International search report - published on:EP06.04.2017
ClassificationIPC:H01L27/02, H02H9/04
[2018/32]
CPC:
H02H9/046 (EP,US); H02H1/0007 (US); H10D89/819 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/32]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VORRICHTUNG ZUM SCHUTZ VOR ELEKTROSTATISCHER ENTLADUNG UND SCHALTVORRICHTUNG[2018/32]
English:ELECTROSTATIC DISCHARGE PROTECTION DEVICE AND CIRCUIT APPARATUS[2018/32]
French:DISPOSITIF DE PROTECTION CONTRE LES DÉCHARGES ÉLECTROSTATIQUES ET APPAREIL DE CIRCUIT[2018/32]
Entry into regional phase06.02.2018National basic fee paid 
06.02.2018Designation fee(s) paid 
06.02.2018Examination fee paid 
Examination procedure06.02.2018Examination requested  [2018/32]
06.02.2018Date on which the examining division has become responsible
26.11.2018Amendment by applicant (claims and/or description)
20.01.2020Communication of intention to grant the patent
05.05.2020Fee for grant paid
05.05.2020Fee for publishing/printing paid
05.05.2020Receipt of the translation of the claim(s)
Opposition(s)18.03.2021No opposition filed within time limit [2021/21]
Fees paidRenewal fee
06.02.2018Renewal fee patent year 03
25.09.2018Renewal fee patent year 04
23.09.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.09.2015
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MK17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
GB29.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS17.10.2020
PT19.10.2020
[2022/32]
Former [2022/28]HU29.09.2015
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MC17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
GB29.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS17.10.2020
PT19.10.2020
Former [2022/27]HU29.09.2015
AL17.06.2020
AT17.06.2020
CY17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
MT17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
TR17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
GB29.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/38]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
GB29.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/37]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IE29.09.2020
LU29.09.2020
BE30.09.2020
CH30.09.2020
FR30.09.2020
LI30.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/36]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
LU29.09.2020
BE30.09.2020
FR30.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/35]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
LU29.09.2020
FR30.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/27]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
LU29.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/24]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SI17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/21]AL17.06.2020
AT17.06.2020
CZ17.06.2020
DK17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/10]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
PL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SK17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
IS17.10.2020
PT19.10.2020
Former [2021/09]AL17.06.2020
AT17.06.2020
CZ17.06.2020
EE17.06.2020
ES17.06.2020
FI17.06.2020
HR17.06.2020
IT17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RO17.06.2020
RS17.06.2020
SE17.06.2020
SM17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
PT19.10.2020
Former [2021/04]AL17.06.2020
FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
NL17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2021/01]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
BG17.09.2020
NO17.09.2020
GR18.09.2020
Former [2020/51]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
RS17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/50]FI17.06.2020
HR17.06.2020
LT17.06.2020
LV17.06.2020
SE17.06.2020
NO17.09.2020
GR18.09.2020
Former [2020/48]FI17.06.2020
LT17.06.2020
SE17.06.2020
NO17.09.2020
Former [2020/47]LT17.06.2020
NO17.09.2020
Cited inInternational search[XI] US2013100561  (SENOUCI NOUREDDINE et al.) [X] 1-4,8 * abstract * * paragraphs [0012] - [0018]; figures 1,2 *[I] 5-7,9-12
 [XI] US2010149701  (DRAPKIN OLEG et al.) [X] 1-4,8 * abstract * * figures 1-6 * * paragraphs [0015] - [0022] *[I] 5-7,9-12
 [XI] US2009197377  (CHALAMALA SREENIVASA et al.) [X] 1-4,7,8 * paragraphs [0007] , [0009] , [0010] , [0011] , [0014] , [0015] , [0029] - [0039] *[I] 5,6,9-12
 [XI] US2011317319  (WU CHIEN MING et al.) [X] 1-5 * abstract * * figure 1 * * paragraphs [0026] - [0034] *[I] 6-12
 [XI] US2005237681  (CHEN CHUNG-HUI et al.) [X] 1-5,9 * abstract * * paragraphs [0019] - [0021] - [0024] , [0025]; figures 1A,1B *[I] 6-8,10-12
 [XI] US2007285854  (RODGERS THURMAN JOHN et al.) [X] 1-5,7 * abstract * * paragraphs [0044] - [0063] - [0068] - [0070] *[I] 6,8-12
 [A] US2003076639  (CHEN WEI-FAN et al.) [A] 1-12 * abstract *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.