| EP3128601 - BACKUP POWER SOURCE SYSTEM AND METHOD THEREOF [Right-click to bookmark this link] | |||
| Former [2017/06] | BACKUP POWER SOURCE SYSTEM, DEGRADATION ESTIMATION DEVICE, AND DEGRADATION ESTIMATION METHOD | ||
| [2019/40] | Status | No opposition filed within time limit Status updated on 12.02.2021 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 21.02.2020 | ||
| Former | Grant of patent is intended Status updated on 24.09.2019 | ||
| Former | Request for examination was made Status updated on 06.01.2017 | ||
| Former | The international publication has been made Status updated on 04.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Kabushiki Kaisha Toshiba 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | [N/P] |
| Former [2017/06] | For all designated states Kabushiki Kaisha Toshiba 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | Inventor(s) | 01 /
UCHIDA Katsuya c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | 02 /
HOSHINO Masayuki c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | 03 /
OKABE Ryo c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | 04 /
KANEKO Norihiro c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | 05 /
SATO Makoto c/o IP Div. Toshiba Corp. (K. K. TOSHIBA) 1-1 Shibaura 1-chome Minato-ku Tokyo 105-8001 / JP | [2017/06] | Representative(s) | AWA Sweden AB Junkersgatan 1 582 35 Linköping / SE | [2020/13] |
| Former [2017/06] | Awapatent AB Junkersgatan 1 582 35 Linköping / SE | Application number, filing date | 15773111.8 | 23.02.2015 | [2017/06] | WO2015JP55046 | Priority number, date | JP20140073955 | 31.03.2014 Original published format: JP 2014073955 | [2017/06] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015151649 | Date: | 08.10.2015 | Language: | JA | [2015/40] | Type: | A1 Application with search report | No.: | EP3128601 | Date: | 08.02.2017 | Language: | EN | [2017/06] | Type: | B1 Patent specification | No.: | EP3128601 | Date: | 25.03.2020 | Language: | EN | [2020/13] | Search report(s) | International search report - published on: | JP | 08.10.2015 | (Supplementary) European search report - dispatched on: | EP | 04.10.2017 | Classification | IPC: | H02J7/00, G01R31/36 | [2017/44] | CPC: |
G01R31/392 (EP,US);
G01R31/3835 (EP,US);
G01R31/389 (US);
H02J7/82 (EP,US);
H02J7/84 (EP,US);
H01M10/441 (EP,US);
|
| Former IPC [2017/06] | H01M10/48, G01R31/36, H01M10/44, H02J7/00, H02J7/02 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Title | German: | RESERVESTROMQUELLENSYSTEM UND UND VERFAHREN DAFÜR | [2019/40] | English: | BACKUP POWER SOURCE SYSTEM AND METHOD THEREOF | [2019/40] | French: | SYSTÈME SOURCE D'ALIMENTATION DE SECOURS ET PROCÉDÉ ASSOCIÉ | [2019/40] |
| Former [2017/06] | RESERVESTROMQUELLENSYSTEM, DEGRADATIONSSCHÄTZUNGSVORRICHTUNG UND DEGRADATIONSSCHÄTZUNGSVERFAHREN | ||
| Former [2017/06] | BACKUP POWER SOURCE SYSTEM, DEGRADATION ESTIMATION DEVICE, AND DEGRADATION ESTIMATION METHOD | ||
| Former [2017/06] | SYSTÈME SOURCE D'ALIMENTATION DE SECOURS, DISPOSITIF D'ESTIMATION DE DÉGRADATION ET PROCÉDÉ D'ESTIMATION DE DÉGRADATION | Entry into regional phase | 26.09.2016 | Translation filed | 26.09.2016 | National basic fee paid | 26.09.2016 | Search fee paid | 26.09.2016 | Designation fee(s) paid | 26.09.2016 | Examination fee paid | Examination procedure | 26.09.2016 | Examination requested [2017/06] | 26.09.2016 | Date on which the examining division has become responsible | 25.04.2018 | Amendment by applicant (claims and/or description) | 25.09.2019 | Communication of intention to grant the patent | 24.01.2020 | Fee for grant paid | 24.01.2020 | Fee for publishing/printing paid | 24.01.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 12.01.2021 | No opposition filed within time limit [2021/11] | Fees paid | Renewal fee | 17.01.2017 | Renewal fee patent year 03 | 14.02.2018 | Renewal fee patent year 04 | 13.02.2019 | Renewal fee patent year 05 | 13.02.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 23.02.2015 | AT | 25.03.2020 | CY | 25.03.2020 | CZ | 25.03.2020 | DK | 25.03.2020 | EE | 25.03.2020 | ES | 25.03.2020 | FI | 25.03.2020 | HR | 25.03.2020 | IT | 25.03.2020 | LT | 25.03.2020 | LV | 25.03.2020 | MC | 25.03.2020 | MK | 25.03.2020 | MT | 25.03.2020 | NL | 25.03.2020 | PL | 25.03.2020 | RO | 25.03.2020 | RS | 25.03.2020 | SE | 25.03.2020 | SI | 25.03.2020 | SK | 25.03.2020 | SM | 25.03.2020 | TR | 25.03.2020 | BG | 25.06.2020 | NO | 25.06.2020 | GR | 26.06.2020 | IS | 25.07.2020 | PT | 18.08.2020 | [2024/41] |
| Former [2024/29] | HU | 23.02.2015 | |
| AT | 25.03.2020 | ||
| CY | 25.03.2020 | ||
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| MC | 25.03.2020 | ||
| MK | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| PL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SI | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| TR | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2024/22] | HU | 23.02.2015 | |
| AT | 25.03.2020 | ||
| CY | 25.03.2020 | ||
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| MC | 25.03.2020 | ||
| MK | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| PL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SI | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2023/30] | HU | 23.02.2015 | |
| AT | 25.03.2020 | ||
| CY | 25.03.2020 | ||
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| MC | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| PL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SI | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2023/27] | HU | 23.02.2015 | |
| AT | 25.03.2020 | ||
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| MC | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| PL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SI | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2021/41] | AT | 25.03.2020 | |
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| MC | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| PL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SI | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2021/24] | AT | 25.03.2020 | |
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| PL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SI | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2021/10] | AT | 25.03.2020 | |
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| PL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2021/09] | AT | 25.03.2020 | |
| CZ | 25.03.2020 | ||
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| IT | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2021/08] | CZ | 25.03.2020 | |
| DK | 25.03.2020 | ||
| EE | 25.03.2020 | ||
| ES | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2020/50] | CZ | 25.03.2020 | |
| EE | 25.03.2020 | ||
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2020/49] | CZ | 25.03.2020 | |
| FI | 25.03.2020 | ||
| HR | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SK | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2020/48] | FI | 25.03.2020 | |
| HR | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RO | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| SM | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| PT | 18.08.2020 | ||
| Former [2020/47] | FI | 25.03.2020 | |
| HR | 25.03.2020 | ||
| LT | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| Former [2020/46] | FI | 25.03.2020 | |
| HR | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| IS | 25.07.2020 | ||
| Former [2020/45] | FI | 25.03.2020 | |
| HR | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| NL | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| Former [2020/39] | FI | 25.03.2020 | |
| HR | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| BG | 25.06.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| Former [2020/38] | FI | 25.03.2020 | |
| HR | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| NO | 25.06.2020 | ||
| GR | 26.06.2020 | ||
| Former [2020/37] | FI | 25.03.2020 | |
| HR | 25.03.2020 | ||
| LV | 25.03.2020 | ||
| RS | 25.03.2020 | ||
| SE | 25.03.2020 | ||
| NO | 25.06.2020 | ||
| Former [2020/35] | FI | 25.03.2020 | |
| NO | 25.06.2020 | Documents cited: | Search | [I] WO2013069328 (SHIN KOBE ELECTRIC MACHINERY et al.) [I] 1-6,9-11 * abstract * * paragraph [0021] - paragraph [0074]; figures 2-4 * | [I] EP2778697 (SHIN KOBE ELECTRIC MACHINERY et al.) * paragraph [0021] - paragraph [0074]; figures 1-4 * | [A] EP2660615 (SANYO ELECTRIC CO et al.) [A] 1-11 * abstract * * paragraph [0024] - paragraph [0051] * | [A] US5406266 (MINO TAKAYUKI et al.) [A] 1-11 * column 3, line 5 - column 4, line 10; figures 2,3 * | International search | [YA] JP2009146843 (PANASONIC CORP et al.) [Y] 1-6, 9-11 * , paragraphs [0019] to [0069]; fig. 1 (Family: none) *[A] 7, 8 | [YA] WO2013069328 (SHIN KOBE ELECTRIC MACHINERY et al.) [Y] 1-6, 9-11 * , paragraphs [0020] to [0048]; fig. 1 to 2 & US 2014/0312915 A & EP 2778699 A1 & CN 103917884 A *[A] 7, 8 | [Y] JPH0817477 (MITSUOKA ELECTRIC MFG et al.) [Y] 4 * , paragraph [0113] (Family: none) * | [Y] JP2001091605 (YUASA BATTERY CO LTD et al.) [Y] 5 * , paragraphs [0027] to [0028] (Family: none) * | [A] JP2012043623 (TOSHIBA CORP et al.) [A] 7, 8 * , entire text; all drawings (Family: none) * | [A] JP2013141379 (TOSHIBA MITSUBISHI ELEC INC et al.) [A] 1-10 * , paragraphs [0016] to [0088]; fig. 1 to 13 (Family: none) * |