| EP3134943 - TERMINAL FITTING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.02.2023 Database last updated on 14.03.2026 | |
| Former | The patent has been granted Status updated on 04.03.2022 | ||
| Former | Grant of patent is intended Status updated on 28.10.2021 | ||
| Former | Examination is in progress Status updated on 07.12.2018 | ||
| Former | Request for examination was made Status updated on 27.01.2017 | ||
| Former | The international publication has been made Status updated on 18.11.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Molex, LLC 2222 Wellington Court Lisle, IL 60532 / US | [2022/16] |
| Former [2017/09] | For all designated states Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | Inventor(s) | 01 /
BHAGYANATHAN SATHIANATHAN, Dwaraganathan 407 Timberlea Dr, Apt 236 Rochester Hills, Michigan 48309 / US | 02 /
LEPOTTIER, Yves c/o Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | 03 /
WANG, Xin c/o Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | 04 /
HEPLER, Eric c/o Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | [2017/18] |
| Former [2017/09] | 01 /
BHAGYANATHAN SATHIANATHAN, Dwaraganathan c/o Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | ||
| 02 /
LEPOTTIER, Yves c/o Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | |||
| 03 /
WANG, Xin c/o Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | |||
| 04 /
HEPLER, Eric c/o Molex Incorporated 2222 Wellington Court Lisle, Illinois 60532 / US | Representative(s) | Blumbach · Zinngrebe Patentanwälte PartG mbB Elisabethenstrasse 11 64283 Darmstadt / DE | [2022/14] |
| Former [2017/09] | Blumbach Zinngrebe Patentanwälte Elisabethenstrasse 11 64283 Darmstadt / DE | Application number, filing date | 15783248.6 | 24.04.2015 | [2017/09] | WO2015US27532 | Priority number, date | US201461983535P | 24.04.2014 Original published format: US 201461983535 P | [2017/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015164754 | Date: | 29.10.2015 | Language: | EN | [2015/43] | Type: | A1 Application with search report | No.: | EP3134943 | Date: | 01.03.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 29.10.2015 takes the place of the publication of the European patent application. | [2017/09] | Type: | B1 Patent specification | No.: | EP3134943 | Date: | 06.04.2022 | Language: | EN | [2022/14] | Type: | B8 Corrected title page of specification | No.: | EP3134943 | Date: | 25.05.2022 | [2022/21] | Search report(s) | International search report - published on: | KR | 29.10.2015 | (Supplementary) European search report - dispatched on: | EP | 15.12.2017 | Classification | IPC: | H01R13/11, H01R4/18, H01R13/187, H01R13/432, H01R43/26, H01R13/18 | [2018/03] | CPC: |
H01R4/185 (EP,US);
H01R13/113 (EP,KR,US);
H01R13/18 (EP,US);
H01R13/187 (EP,KR,US);
H01R13/432 (EP,US);
H01R43/26 (EP,US)
|
| Former IPC [2017/09] | H01R13/11, H01R4/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | ANSCHLUSSSTÜCK | [2017/09] | English: | TERMINAL FITTING | [2017/09] | French: | RACCORD DE BORNE | [2017/09] | Entry into regional phase | 18.11.2016 | National basic fee paid | 18.11.2016 | Search fee paid | 18.11.2016 | Designation fee(s) paid | 18.11.2016 | Examination fee paid | Examination procedure | 18.11.2016 | Examination requested [2017/09] | 18.11.2016 | Date on which the examining division has become responsible | 27.06.2018 | Amendment by applicant (claims and/or description) | 05.12.2018 | Despatch of a communication from the examining division (Time limit: M04) | 04.04.2019 | Reply to a communication from the examining division | 04.05.2020 | Despatch of a communication from the examining division (Time limit: M03) | 31.07.2020 | Reply to a communication from the examining division | 29.09.2020 | Despatch of a communication from the examining division (Time limit: M02) | 24.11.2020 | Reply to a communication from the examining division | 29.10.2021 | Communication of intention to grant the patent | 24.02.2022 | Fee for grant paid | 24.02.2022 | Fee for publishing/printing paid | 24.02.2022 | Receipt of the translation of the claim(s) | Divisional application(s) | EP22158544.1 / EP4024623 | EP22158553.2 / EP4024617 | Opposition(s) | 10.01.2023 | No opposition filed within time limit [2023/11] | Fees paid | Renewal fee | 10.04.2017 | Renewal fee patent year 03 | 11.04.2018 | Renewal fee patent year 04 | 15.04.2019 | Renewal fee patent year 05 | 31.03.2020 | Renewal fee patent year 06 | 15.04.2021 | Renewal fee patent year 07 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.04.2015 | AL | 06.04.2022 | AT | 06.04.2022 | BG | 06.04.2022 | CY | 06.04.2022 | CZ | 06.04.2022 | DK | 06.04.2022 | EE | 06.04.2022 | ES | 06.04.2022 | FI | 06.04.2022 | HR | 06.04.2022 | IT | 06.04.2022 | LT | 06.04.2022 | LV | 06.04.2022 | MC | 06.04.2022 | MK | 06.04.2022 | MT | 06.04.2022 | NL | 06.04.2022 | PL | 06.04.2022 | RO | 06.04.2022 | RS | 06.04.2022 | SE | 06.04.2022 | SI | 06.04.2022 | SK | 06.04.2022 | SM | 06.04.2022 | TR | 06.04.2022 | IE | 24.04.2022 | LU | 24.04.2022 | BE | 30.04.2022 | CH | 30.04.2022 | LI | 30.04.2022 | NO | 06.07.2022 | GR | 07.07.2022 | IS | 06.08.2022 | PT | 08.08.2022 | [2026/04] |
| Former [2024/51] | HU | 24.04.2015 | |
| AL | 06.04.2022 | ||
| AT | 06.04.2022 | ||
| BG | 06.04.2022 | ||
| CY | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| IT | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| MK | 06.04.2022 | ||
| MT | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SI | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2024/41] | HU | 24.04.2015 | |
| AL | 06.04.2022 | ||
| AT | 06.04.2022 | ||
| CY | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| IT | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| MK | 06.04.2022 | ||
| MT | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SI | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2024/22] | HU | 24.04.2015 | |
| AL | 06.04.2022 | ||
| AT | 06.04.2022 | ||
| CY | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| IT | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| MK | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SI | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2024/20] | HU | 24.04.2015 | |
| AL | 06.04.2022 | ||
| AT | 06.04.2022 | ||
| CY | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| IT | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SI | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2024/18] | HU | 24.04.2015 | |
| AL | 06.04.2022 | ||
| AT | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| IT | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SI | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2024/11] | AL | 06.04.2022 | |
| AT | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| IT | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SI | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2023/25] | AL | 06.04.2022 | |
| AT | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SI | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2023/20] | AL | 06.04.2022 | |
| AT | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| IE | 24.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2023/17] | AL | 06.04.2022 | |
| AT | 06.04.2022 | ||
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2023/10] | AT | 06.04.2022 | |
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| LU | 24.04.2022 | ||
| BE | 30.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2023/09] | AT | 06.04.2022 | |
| CZ | 06.04.2022 | ||
| DK | 06.04.2022 | ||
| EE | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RO | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| SK | 06.04.2022 | ||
| SM | 06.04.2022 | ||
| LU | 24.04.2022 | ||
| CH | 30.04.2022 | ||
| LI | 30.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2023/08] | AT | 06.04.2022 | |
| DK | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| MC | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| LU | 24.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2023/07] | AT | 06.04.2022 | |
| DK | 06.04.2022 | ||
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2022/51] | AT | 06.04.2022 | |
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| IS | 06.08.2022 | ||
| PT | 08.08.2022 | ||
| Former [2022/50] | AT | 06.04.2022 | |
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| PL | 06.04.2022 | ||
| RS | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| PT | 08.08.2022 | ||
| Former [2022/49] | AT | 06.04.2022 | |
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| HR | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| LV | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| BG | 06.07.2022 | ||
| NO | 06.07.2022 | ||
| GR | 07.07.2022 | ||
| PT | 08.08.2022 | ||
| Former [2022/47] | AT | 06.04.2022 | |
| ES | 06.04.2022 | ||
| FI | 06.04.2022 | ||
| LT | 06.04.2022 | ||
| NL | 06.04.2022 | ||
| SE | 06.04.2022 | ||
| NO | 06.07.2022 | ||
| PT | 08.08.2022 | ||
| Former [2022/44] | NL | 06.04.2022 | Documents cited: | Search | [XY] US2014030934 (WIRTH KARL et al.) [X] 1,4,5 * figures 2, 3, 4 *[Y] 2,3,6-12,20 | [Y] EP1291979 (DELPHI TECH INC et al.) [Y] 2,3 * figure 3 * | [Y] US2012094551 (CORMAN NED et al.) [Y] 8-12 * figures 8, 10 * | [Y] US2006172618 (YAMASHITA KAZUNORI et al.) [Y] 6,7,20 * paragraph [0031]; figure 28 * | [A] US2007123093 (LUTSCH HARALD M et al.) [A] 1-12,20 * figure 8 * | [A] US6102752 (BOMMEL CHRISTIAN OTTO et al.) [A] 1-12,20 * figure 4 * | International search | [YA] JP5334753 [Y] 13-17 * See paragraphs [0016]-[0022], claim 1 and figures 1-7. *[A] 1-12, 18-20 | [Y] US2012244756 (JOUAS VALERIE et al.) [Y] 13-17 * See paragraphs [0033]-[0051] and figures 1-13. * | [A] US2007149050 (OKA TAICHI et al.) [A] 1-20 * See paragraphs [0065]-[0088] and figures 1-8. * | [A] US5162004 (KUZUNO KATSUTOSHI et al.) [A] 1-20 * See column 6, line 52 - column 9, line 52 and figures 3-7C. * | [A] US4632483 (VERIN PIERRE et al.) [A] 1-20 * See column 1, line 63 - column 2, line 61 and figures 1-6. * | by applicant | US2014030934 | EP1291979 | US2012094551 | US2006172618 | US2006123093 | US6102752 |