EP3200963 - ELÉMENT DE CONSTRUCTION INCORPORANT UN SYSTÈME ÉLECTRONIQUE ET SON PROCÉDÉ DE FABRICATION [Right-click to bookmark this link] | |||
Former [2017/32] | CONSTRUCTION ELEMENT INCORPORATING AN ELECTRONIC SYSTEM AND METHOD FOR THE PRODUCTION THEREOF | ||
[2021/17] | Status | No opposition filed within time limit Status updated on 08.07.2022 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 30.07.2021 | ||
Former | Grant of patent is intended Status updated on 15.04.2021 | ||
Former | Request for examination was made Status updated on 07.07.2017 | ||
Former | The international publication has been made Status updated on 20.02.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Melet, Rolland 201 chemin de Combeferris 83780 Flayosc / FR | [2017/32] | Inventor(s) | 01 /
see applicant ... | [2017/32] | Representative(s) | Macquet, Christophe Macquet & Associés Arche des Dolines 7, rue Soutrane 06560 Sophia Antipolis / FR | [2017/32] | Application number, filing date | 15786993.4 | 16.09.2015 | [2017/32] | WO2015FR00183 | Priority number, date | FR20140002219 | 02.10.2014 Original published format: FR 1402219 | [2017/32] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2016051030 | Date: | 07.04.2016 | Language: | FR | [2016/14] | Type: | A1 Application with search report | No.: | EP3200963 | Date: | 09.08.2017 | Language: | FR | The application published by WIPO in one of the EPO official languages on 07.04.2016 takes the place of the publication of the European patent application. | [2017/32] | Type: | B1 Patent specification | No.: | EP3200963 | Date: | 01.09.2021 | Language: | FR | [2021/35] | Search report(s) | International search report - published on: | EP | 07.04.2016 | Classification | IPC: | B28B23/00, G06K19/077 | [2017/32] | CPC: |
B28B23/0031 (EP,US);
E04B1/34384 (US);
F16M13/005 (US);
G01C9/06 (US);
G01S13/12 (US);
G06K19/077 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/32] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | 20.02.2017 | Title | German: | BAUELEMENT MIT EINEM ELEKTRONISCHEN SYSTEM UND VERFAHREN ZUR HERSTELLUNG DAVON | [2017/32] | English: | ELÉMENT DE CONSTRUCTION INCORPORANT UN SYSTÈME ÉLECTRONIQUE ET SON PROCÉDÉ DE FABRICATION | [2021/17] | French: | ELÉMENT DE CONSTRUCTION INCORPORANT UN SYSTÈME ÉLECTRONIQUE ET SON PROCÉDÉ DE FABRICATION | [2017/32] |
Former [2017/32] | CONSTRUCTION ELEMENT INCORPORATING AN ELECTRONIC SYSTEM AND METHOD FOR THE PRODUCTION THEREOF | Entry into regional phase | 20.02.2017 | National basic fee paid | 20.02.2017 | Designation fee(s) paid | 20.02.2017 | Examination fee paid | Examination procedure | 20.02.2017 | Examination requested [2017/32] | 20.02.2017 | Date on which the examining division has become responsible | 04.01.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 08.03.2018 | Amendment by applicant (claims and/or description) | 16.04.2021 | Communication of intention to grant the patent | 22.07.2021 | Fee for grant paid | 22.07.2021 | Fee for publishing/printing paid | 22.07.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 02.06.2022 | No opposition filed within time limit [2022/32] | Request for further processing for: | 08.03.2018 | Request for further processing filed | 08.03.2018 | Full payment received (date of receipt of payment) Request granted | 21.03.2018 | Decision despatched | Fees paid | Renewal fee | 29.09.2017 | Renewal fee patent year 03 | 28.09.2018 | Renewal fee patent year 04 | 30.09.2019 | Renewal fee patent year 05 | 30.09.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.09.2015 | AL | 01.09.2021 | AT | 01.09.2021 | CY | 01.09.2021 | CZ | 01.09.2021 | DK | 01.09.2021 | EE | 01.09.2021 | ES | 01.09.2021 | FI | 01.09.2021 | HR | 01.09.2021 | IT | 01.09.2021 | LT | 01.09.2021 | LV | 01.09.2021 | MC | 01.09.2021 | MK | 01.09.2021 | MT | 01.09.2021 | NL | 01.09.2021 | PL | 01.09.2021 | RO | 01.09.2021 | RS | 01.09.2021 | SE | 01.09.2021 | SI | 01.09.2021 | SK | 01.09.2021 | SM | 01.09.2021 | IE | 16.09.2021 | LU | 16.09.2021 | BE | 30.09.2021 | BG | 01.12.2021 | NO | 01.12.2021 | GR | 02.12.2021 | IS | 01.01.2022 | PT | 03.01.2022 | [2024/41] |
Former [2024/22] | HU | 16.09.2015 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
MK | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 16.09.2021 | ||
LU | 16.09.2021 | ||
BE | 30.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/30] | HU | 16.09.2015 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CY | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 16.09.2021 | ||
LU | 16.09.2021 | ||
BE | 30.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2023/27] | HU | 16.09.2015 | |
AL | 01.09.2021 | ||
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 16.09.2021 | ||
LU | 16.09.2021 | ||
BE | 30.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/36] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
IT | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SI | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 16.09.2021 | ||
LU | 16.09.2021 | ||
BE | 30.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/35] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
DK | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
IE | 16.09.2021 | ||
LU | 16.09.2021 | ||
BE | 30.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/34] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
LU | 16.09.2021 | ||
BE | 30.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/33] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
MC | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BE | 30.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/29] | AL | 01.09.2021 | |
AT | 01.09.2021 | ||
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/25] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
SM | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/24] | AT | 01.09.2021 | |
CZ | 01.09.2021 | ||
EE | 01.09.2021 | ||
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
NL | 01.09.2021 | ||
PL | 01.09.2021 | ||
RO | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
SK | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
IS | 01.01.2022 | ||
PT | 03.01.2022 | ||
Former [2022/21] | AT | 01.09.2021 | |
ES | 01.09.2021 | ||
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/10] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
HR | 01.09.2021 | ||
LT | 01.09.2021 | ||
LV | 01.09.2021 | ||
PL | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
GR | 02.12.2021 | ||
Former [2022/09] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
RS | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/08] | ES | 01.09.2021 | |
FI | 01.09.2021 | ||
LT | 01.09.2021 | ||
SE | 01.09.2021 | ||
BG | 01.12.2021 | ||
NO | 01.12.2021 | ||
Former [2022/07] | LT | 01.09.2021 | |
NO | 01.12.2021 | Cited in | International search | [A]JP2005267227 (MITSUBISHI MATERIALS CORP) [A] 1* abstract *; | [A]JP2008137284 (SUMITOMO OSAKA CEMENT CO LTD, et al) [A] 1 * abstract *; | [X]US2009072978 (TILSON JR THOMAS M [US]) [X] 11 * "To help the worker locate the RFID tag 104 from inside the concrete component 400, a mark may be placed on the inside surface of the concrete component 400 indicating where, on the outside surface of the concrete component 400, the RFID tag 104 is located. For example, the RFID tag 104 may be placed at a location on the outer jacket 204 of the mold that is aligned with a weld line along the inner jacket 202 of the mold 200. When the concrete component 400 is cast, this weld line produces a visible line down the inside surface of the concrete component 400. The worker may locate this visible line and activate the reader 708 at this location. "; paragraph [0045]; figures 1,2,3,4,5,6,7 *; | [XA]US2014030026 (KIEST JR LARRY W [US]) [X] 11 * fig 3, item 50 ; "[0029] FIG. 4 is a sectional view of the manhole 10 after the resinous material has cured and hardened and the bladder 32 has been removed from the manhole 10. " "[0027] The transmitter 50 is connected to the manhole liner 40 on either side of the manhole liner body 42. Furthermore, when the manhole liner 40 comprises multiple layers, the transmitter 50 may be housed between the layers of the liner. The transmitter 50 includes at least a radio frequency identification tag (RFID tag 52"; paragraph [0027]; figures 2,3,4 * * paragraph [0029] * [A] 1 | by applicant | EP1909218 | FR2977583 |