blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3369294

EP3369294 - PLASMA ACCELERATOR WITH MODULATED THRUST AND SPACE BORN VEHICLE WITH THE SAME [Right-click to bookmark this link]
Former [2018/36]PLASMA ACCELERATOR WITH MODULATED THRUST
[2019/09]
StatusNo opposition filed within time limit
Status updated on  17.04.2020
Database last updated on 05.02.2025
FormerThe patent has been granted
Status updated on  10.05.2019
FormerGrant of patent is intended
Status updated on  11.03.2019
FormerRequest for examination was made
Status updated on  03.08.2018
FormerThe international publication has been made
Status updated on  05.05.2017
Most recent event   Tooltip01.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 03.08.2022  [2022/31]
Applicant(s)For all designated states
Aernnova
Poligono Industrial y Tecnológico Illescas
Avenida de Barajas, 3
45200 Illescas - Toledo / ES
For all designated states
Universidad Politécnica de Madrid
C/ Ramiro de Maeztu 7
28040 Madrid / ES
[2018/36]
Inventor(s)01 / CASTILLO ACERO, Miguel Angel
C/ Princesa de Eboli 9D - 1ª
E-28050 Madrid / ES
02 / CONDE LOPEZ, Luis
C/ General Ampudia 2
8º Izquierda
E-28003 Madrid / ES
03 / DOMENECH GARRET, Juan Luis
Calle Fernando El Católico 77
Esc. Derecha 6º E
E-28015 Madrid / ES
04 / DONOSO VARGAS, José Manuel
Calle Dulzura 4-2
E-28041 Madrid / ES
05 / DEL RIO FERNANDEZ, Ezequiel
Avenida Juan Andrés 30 - 11D
E-28035 Madrid / ES
 [2018/36]
Representative(s)Carvajal y Urquijo, Isabel, et al
Clarke, Modet & Co.
Suero de Quiñones, 34-36
28002 Madrid / ES
[2018/36]
Application number, filing date15790868.227.10.2015
[2018/36]
WO2015EP74879
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017071739
Date:04.05.2017
Language:EN
[2017/18]
Type: A1 Application with search report 
No.:EP3369294
Date:05.09.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 04.05.2017 takes the place of the publication of the European patent application.
[2018/36]
Type: B1 Patent specification 
No.:EP3369294
Date:12.06.2019
Language:EN
[2019/24]
Search report(s)International search report - published on:EP04.05.2017
ClassificationIPC:H05H1/54, F03H1/00
[2018/36]
CPC:
H05H1/54 (EP,US); F03H1/0018 (EP,US); F03H1/0056 (EP,US);
H01J27/205 (US); H05H1/24 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/36]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:PLASMABESCHLEUNIGER MIT MODULIERTEM SCHUB UND RAUMSFAHRZEUG MIT DEMSELBEN[2019/09]
English:PLASMA ACCELERATOR WITH MODULATED THRUST AND SPACE BORN VEHICLE WITH THE SAME[2019/09]
French:ACCÉLÉRATEUR À PLASMA À POUSSÉE MODULÉE ET VEHICULE SPATIAL L'UTILISANT[2019/09]
Former [2018/36]PLASMABESCHLEUNIGER MIT MODULIERTEM SCHUB
Former [2018/36]PLASMA ACCELERATOR WITH MODULATED THRUST
Former [2018/36]ACCÉLÉRATEUR À PLASMA À POUSSÉE MODULÉE
Entry into regional phase13.03.2018National basic fee paid 
13.03.2018Designation fee(s) paid 
13.03.2018Examination fee paid 
Examination procedure24.11.2016Request for preliminary examination filed
International Preliminary Examining Authority: EP
13.03.2018Amendment by applicant (claims and/or description)
13.03.2018Examination requested  [2018/36]
13.03.2018Date on which the examining division has become responsible
12.03.2019Communication of intention to grant the patent
22.04.2019Fee for grant paid
22.04.2019Fee for publishing/printing paid
22.04.2019Receipt of the translation of the claim(s)
Opposition(s)13.03.2020No opposition filed within time limit [2020/21]
Fees paidRenewal fee
13.03.2018Renewal fee patent year 03
25.10.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU27.10.2015
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MK12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
IE27.10.2019
LU27.10.2019
BE31.10.2019
CH31.10.2019
LI31.10.2019
[2022/31]
Former [2021/48]HU27.10.2015
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SI12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
IE27.10.2019
LU27.10.2019
BE31.10.2019
CH31.10.2019
LI31.10.2019
Former [2021/34]HU27.10.2015
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
MT12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
IE27.10.2019
LU27.10.2019
BE31.10.2019
CH31.10.2019
LI31.10.2019
Former [2021/33]HU27.10.2015
AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
IE27.10.2019
LU27.10.2019
BE31.10.2019
CH31.10.2019
LI31.10.2019
Former [2021/26]AL12.06.2019
AT12.06.2019
CY12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
IE27.10.2019
LU27.10.2019
BE31.10.2019
CH31.10.2019
LI31.10.2019
Former [2020/46]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
IE27.10.2019
LU27.10.2019
BE31.10.2019
CH31.10.2019
LI31.10.2019
Former [2020/38]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
LU27.10.2019
BE31.10.2019
CH31.10.2019
LI31.10.2019
Former [2020/36]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
LU27.10.2019
CH31.10.2019
LI31.10.2019
Former [2020/35]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
LU27.10.2019
CH31.10.2019
LI31.10.2019
IS24.02.2020
Former [2020/34]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
CH31.10.2019
LI31.10.2019
IS24.02.2020
Former [2020/29]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
MC12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS24.02.2020
Former [2020/24]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
PL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
IS24.02.2020
Former [2020/22]AL12.06.2019
AT12.06.2019
CZ12.06.2019
DK12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/17]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
TR12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/14]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
SM12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/12]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
IS12.10.2019
PT14.10.2019
Former [2020/11]AL12.06.2019
AT12.06.2019
CZ12.06.2019
EE12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
SK12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/10]AL12.06.2019
AT12.06.2019
CZ12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RO12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
PT14.10.2019
Former [2020/09]AL12.06.2019
CZ12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2020/07]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
NL12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/51]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
BG12.09.2019
NO12.09.2019
GR13.09.2019
Former [2019/50]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
LV12.06.2019
RS12.06.2019
SE12.06.2019
NO12.09.2019
GR13.09.2019
Former [2019/49]AL12.06.2019
FI12.06.2019
HR12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/48]FI12.06.2019
LT12.06.2019
SE12.06.2019
NO12.09.2019
Former [2019/47]FI12.06.2019
LT12.06.2019
NO12.09.2019
Cited inInternational search[A]US3913320  (READER PAUL D, et al) [A] 1-10 * figures 1-3 * * column 3, line 48 - column 7, line 29 *;
 [A]EP0505327  (PROEL TECNOLOGIE SPA [IT]) [A] 1 * figure 1 * * column 4, line 5 - column 5, line 40 *;
 [AD]US5369953  (BROPHY JOHN R [US]) [AD] 1,2 * figure 1 * * column 4, line 4 - column 5, line 14 *;
 [A]WO9928624  (PRIMEX TECH INC [US]) [A] 1* figures 1,5 *;
 [A]US2010207527  (HRUBY VLADIMIR J [US], et al) [A] 1,10 * figure 1 * * paragraph [0027] - paragraph [0032] *;
 [IDA]WO2011088335  (NASA GLENN RES CT [US]) [ID] 1,3-10 * figures 6-10 * * paragraph [0011] * * column 43 - column 77 * [A] 2
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.