EP3142961 - BEVERAGE DISPENSER [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.10.2022 Database last updated on 18.11.2024 | |
Former | The patent has been granted Status updated on 12.11.2021 | ||
Former | Grant of patent is intended Status updated on 07.07.2021 | ||
Former | Request for examination was made Status updated on 17.02.2017 | ||
Former | The international publication has been made Status updated on 09.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states The Coca-Cola Company One Coca-Cola Plaza, NW Atlanta, GA 30313 / US | [2017/12] | Inventor(s) | 01 /
GATIPON, Shaun B. 2000 Westover Lane N.W. Kennesaw, Georgia 30152 / US | [2017/12] | Representative(s) | Dehns 10 Old Bailey London EC4M 7NG / GB | [N/P] |
Former [2021/50] | Dehns St. Bride's House 10 Salisbury Square London EC4Y 8JD / GB | ||
Former [2017/12] | Jackson, Robert Patrick Dehns St Bride's House 10 Salisbury Square London EC4Y 8JD / GB | Application number, filing date | 15792098.4 | 13.05.2015 | [2017/12] | WO2015US30469 | Priority number, date | US201461993463P | 15.05.2014 Original published format: US 201461993463 P | [2017/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015175598 | Date: | 19.11.2015 | Language: | EN | [2015/46] | Type: | A1 Application with search report | No.: | EP3142961 | Date: | 22.03.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.11.2015 takes the place of the publication of the European patent application. | [2017/12] | Type: | B1 Patent specification | No.: | EP3142961 | Date: | 15.12.2021 | Language: | EN | [2021/50] | Search report(s) | International search report - published on: | KR | 19.11.2015 | (Supplementary) European search report - dispatched on: | EP | 02.01.2018 | Classification | IPC: | B67D3/00, B67D1/08, B67D1/12 | [2017/12] | CPC: |
B67D1/0007 (EP,US);
B67D1/0888 (US);
B67D1/0025 (EP,US);
B67D1/0037 (EP,US);
B67D1/0877 (US);
B67D1/0878 (US);
B67D1/1231 (EP,US);
G06F3/0482 (US);
G06F9/451 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | GETRÄNKESPENDER | [2017/12] | English: | BEVERAGE DISPENSER | [2017/12] | French: | DISTRIBUTEUR DE BOISSON | [2017/12] | Entry into regional phase | 08.12.2016 | National basic fee paid | 08.12.2016 | Search fee paid | 08.12.2016 | Designation fee(s) paid | 08.12.2016 | Examination fee paid | Examination procedure | 08.12.2016 | Examination requested [2017/12] | 08.12.2016 | Date on which the examining division has become responsible | 04.09.2018 | Despatch of communication that the application is deemed to be withdrawn, reason: reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report not received in time | 14.11.2018 | Amendment by applicant (claims and/or description) | 08.07.2021 | Communication of intention to grant the patent | 04.11.2021 | Fee for grant paid | 04.11.2021 | Fee for publishing/printing paid | 04.11.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 16.09.2022 | No opposition filed within time limit [2022/47] | Request for further processing for: | The application is deemed to be withdrawn due to failure to reply to the Extended European Search Report/Written Opinion of the International Searching Authority/International Preliminary Examination Report/Supplementary international search report/Supplementary European search report | 14.11.2018 | Request for further processing filed | 14.11.2018 | Full payment received (date of receipt of payment) Request granted | 26.11.2018 | Decision despatched | Fees paid | Renewal fee | 24.05.2017 | Renewal fee patent year 03 | 25.05.2018 | Renewal fee patent year 04 | 21.05.2019 | Renewal fee patent year 05 | 20.05.2020 | Renewal fee patent year 06 | 19.05.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 13.05.2015 | AL | 15.12.2021 | AT | 15.12.2021 | CY | 15.12.2021 | CZ | 15.12.2021 | DK | 15.12.2021 | EE | 15.12.2021 | ES | 15.12.2021 | FI | 15.12.2021 | HR | 15.12.2021 | IT | 15.12.2021 | LT | 15.12.2021 | LV | 15.12.2021 | MC | 15.12.2021 | MK | 15.12.2021 | MT | 15.12.2021 | NL | 15.12.2021 | PL | 15.12.2021 | RO | 15.12.2021 | RS | 15.12.2021 | SE | 15.12.2021 | SI | 15.12.2021 | SK | 15.12.2021 | SM | 15.12.2021 | BG | 15.03.2022 | NO | 15.03.2022 | GR | 16.03.2022 | IS | 15.04.2022 | PT | 18.04.2022 | IE | 13.05.2022 | LU | 13.05.2022 | BE | 31.05.2022 | CH | 31.05.2022 | LI | 31.05.2022 | [2024/41] |
Former [2024/22] | HU | 13.05.2015 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CY | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
MK | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 13.05.2022 | ||
LU | 13.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/20] | HU | 13.05.2015 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CY | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 13.05.2022 | ||
LU | 13.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2024/18] | HU | 13.05.2015 | |
AL | 15.12.2021 | ||
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 13.05.2022 | ||
LU | 13.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/25] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
IT | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 13.05.2022 | ||
LU | 13.05.2022 | ||
BE | 31.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/20] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
IE | 13.05.2022 | ||
LU | 13.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/09] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
LU | 13.05.2022 | ||
CH | 31.05.2022 | ||
LI | 31.05.2022 | ||
Former [2023/08] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
LU | 13.05.2022 | ||
Former [2023/06] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
MC | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2023/01] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SI | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/49] | AL | 15.12.2021 | |
AT | 15.12.2021 | ||
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/46] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
DK | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/42] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
IS | 15.04.2022 | ||
PT | 18.04.2022 | ||
Former [2022/36] | AT | 15.12.2021 | |
CZ | 15.12.2021 | ||
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
PL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/35] | CZ | 15.12.2021 | |
EE | 15.12.2021 | ||
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SK | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/34] | EE | 15.12.2021 | |
ES | 15.12.2021 | ||
FI | 15.12.2021 | ||
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RO | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
PT | 18.04.2022 | ||
Former [2022/33] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
SM | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/30] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
NL | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/25] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
NO | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/24] | FI | 15.12.2021 | |
HR | 15.12.2021 | ||
LT | 15.12.2021 | ||
LV | 15.12.2021 | ||
RS | 15.12.2021 | ||
SE | 15.12.2021 | ||
BG | 15.03.2022 | ||
GR | 16.03.2022 | ||
Former [2022/22] | FI | 15.12.2021 | |
LT | 15.12.2021 | ||
RS | 15.12.2021 | ||
BG | 15.03.2022 | ||
Former [2022/21] | RS | 15.12.2021 | |
BG | 15.03.2022 | ||
Former [2022/19] | BG | 15.03.2022 | Documents cited: | Search | [XI]US6751525 (CRISP III HARRY LEE [US]) [X] 1-6,9,14,15 * column 11, lines 24-43 * * column 15, lines 44-57 * [I] 7,8; | [Y]US2004170727 (HOWARD RONNIE L [US], et al) [Y] 7,8 * paragraph [0037]; figure - *; | [A]US2005143857 (CHIRNOMAS MUNROE [US]) [A] 6* paragraph [0055]; figure 8 *; | [XI]WO2009032938 (COCA COLA CO [US]) [X] 1-6,9-15 * paragraphs [0033] - [0035] - [0113] , [0115] , [0116]; figures 1,4,10 * [I] 7,8; | [XI]US2010005903 (BEAVIS RUSSELL H [US]) [X] 1-6,9,14,15 * paragraph [0263] * [I] 7,8; | [Y]US2011017776 (METROPULOS WILLIAM [US], et al) [Y] 7,8 * paragraph [0062]; figures 3,4 *; | [Y]US2011301768 (HAMMONDS MARCUS [US], et al) [Y] 7,8 * paragraph [0034]; figure 2 *; | [XI]WO2014036127 (PEPSICO INC [US]) [X] 1-6,9-15 * paragraphs [0086] , [0089]; figure 7 * [I] 7,8 | International search | [A]US2004045984 (SCHUMAN ALLAN L [US], et al) [A] 1-26 * See abstract, paragraphs [0032]-[0035], and figure 1. *; | [Y]EP1983312 (LG ELECTRONICS INC [KR]) [Y] 6-7 * See abstract, paragraphs [0029], [0100], and figure 2. *; | [XY]US2009069949 (CARPENTER GREGG [US], et al) [X] 1-5, 8-10, 12, 14-26 * See abstract, paragraphs [0032]-[0034], [0056], [0064], [0095], claims 28-35, and figures 1A-1F. * [Y] 6-7, 11, 13; | [Y]US2009218365 (TARADALSKY MORRIS [US], et al) [Y] 11, 13 * See abstract, paragraphs [0034]-[0035], [0066], and figures 1, 12. *; | [A]US2010024915 (THOMAS GORDON [US], et al) [A] 1-26* See abstract, paragraphs [0032]-[0033], and figure 1. * |