| EP3143796 - APPARATUS, SYSTEM AND METHOD OF OFFLOADING TRAFFIC AT A USER EQUIPMENT (UE) BASED ON A MOBILITY STATE OF A WLAN ACCESS POINT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.05.2021 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 29.05.2020 | ||
| Former | Grant of patent is intended Status updated on 05.02.2020 | ||
| Former | Examination is in progress Status updated on 11.03.2019 | ||
| Former | Request for examination was made Status updated on 17.02.2017 | ||
| Former | The international publication has been made Status updated on 04.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Intel IP Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | [2017/12] | Inventor(s) | 01 /
SIROTKIN, Alexander House 172 90901 Giv'on Hachadasha / IL | 02 /
FONG, Mo-Han 409 Spencer Terrace Sunnyvale, California 94089 / US | 03 /
HIMAYAT, Nageen 44609 Parkmeadow Drive Fremont, California 94539 / US | 04 /
BURBIDGE, Richard C. Swanhill House Townsend Road Shrivenham Oxfordshire SN6 8HR / GB | [2017/12] | Representative(s) | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | [2020/27] |
| Former [2017/12] | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Patentanwälte Rechtsanwälte Pettenkoferstrasse 20-22 80336 München / DE | Application number, filing date | 15793639.4 | 12.05.2015 | [2017/12] | WO2015US30278 | Priority number, date | US201461992706P | 13.05.2014 Original published format: US 201461992706 P | [2017/12] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015175468 | Date: | 19.11.2015 | Language: | EN | [2015/46] | Type: | A1 Application with search report | No.: | EP3143796 | Date: | 22.03.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 19.11.2015 takes the place of the publication of the European patent application. | [2017/12] | Type: | B1 Patent specification | No.: | EP3143796 | Date: | 01.07.2020 | Language: | EN | [2020/27] | Search report(s) | International search report - published on: | KR | 19.11.2015 | (Supplementary) European search report - dispatched on: | EP | 29.11.2017 | Classification | IPC: | H04W28/02, H04W36/22, H04W28/08, // H04W88/06 | [2017/52] | CPC: |
H04W36/22 (EP,KR,US);
H04W28/0226 (EP,KR,US);
H04W36/08 (EP,US);
H04W36/1446 (EP,KR,US);
H04W36/324 (EP,KR,US);
H04W88/06 (EP,KR,US);
H04W84/12 (US)
(-)
|
| Former IPC [2017/12] | H04W28/02, H04W88/06 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/12] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VORRICHTUNG, SYSTEM UND VERFAHREN ZUM ENTLADEN VON VERKEHR AN EINER BENUTZERAUSRÜSTUNG BASIEREND AUF EINEM MOBILITÄTSSTATUS EINES WLAN-ZUGANGSPUNKTS | [2017/12] | English: | APPARATUS, SYSTEM AND METHOD OF OFFLOADING TRAFFIC AT A USER EQUIPMENT (UE) BASED ON A MOBILITY STATE OF A WLAN ACCESS POINT | [2017/12] | French: | APPAREIL, SYSTÈME ET PROCÉDÉ DE DÉCHARGEMENT DE TRAFIC AU NIVEAU D'UN ÉQUIPEMENT UTILISATEUR (UE) REPOSANT SUR UN ÉTAT DE MOBILITÉ D'UN POINT D'ACCÈS DE RÉSEAU LOCAL SANS FIL | [2017/12] | Entry into regional phase | 07.10.2016 | National basic fee paid | 07.10.2016 | Search fee paid | 07.10.2016 | Designation fee(s) paid | 07.10.2016 | Examination fee paid | Examination procedure | 07.10.2016 | Examination requested [2017/12] | 07.10.2016 | Date on which the examining division has become responsible | 25.06.2018 | Amendment by applicant (claims and/or description) | 14.03.2019 | Despatch of a communication from the examining division (Time limit: M02) | 05.04.2019 | Reply to a communication from the examining division | 19.02.2020 | Communication of intention to grant the patent | 20.05.2020 | Fee for grant paid | 20.05.2020 | Fee for publishing/printing paid | 20.05.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 06.04.2021 | No opposition filed within time limit [2021/23] | Fees paid | Renewal fee | 10.05.2017 | Renewal fee patent year 03 | 11.05.2018 | Renewal fee patent year 04 | 15.05.2019 | Renewal fee patent year 05 | 14.05.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 12.05.2015 | AL | 01.07.2020 | AT | 01.07.2020 | CY | 01.07.2020 | CZ | 01.07.2020 | DK | 01.07.2020 | EE | 01.07.2020 | ES | 01.07.2020 | FI | 01.07.2020 | HR | 01.07.2020 | IT | 01.07.2020 | LT | 01.07.2020 | LV | 01.07.2020 | MC | 01.07.2020 | MK | 01.07.2020 | MT | 01.07.2020 | PL | 01.07.2020 | RO | 01.07.2020 | RS | 01.07.2020 | SE | 01.07.2020 | SI | 01.07.2020 | SK | 01.07.2020 | SM | 01.07.2020 | TR | 01.07.2020 | BG | 01.10.2020 | NO | 01.10.2020 | GR | 02.10.2020 | IS | 01.11.2020 | PT | 02.11.2020 | [2024/41] |
| Former [2024/29] | HU | 12.05.2015 | |
| AL | 01.07.2020 | ||
| AT | 01.07.2020 | ||
| CY | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| MC | 01.07.2020 | ||
| MK | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SI | 01.07.2020 | ||
| SK | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| TR | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2024/22] | HU | 12.05.2015 | |
| AL | 01.07.2020 | ||
| AT | 01.07.2020 | ||
| CY | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| MC | 01.07.2020 | ||
| MK | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SI | 01.07.2020 | ||
| SK | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2023/30] | HU | 12.05.2015 | |
| AL | 01.07.2020 | ||
| AT | 01.07.2020 | ||
| CY | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| MC | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SI | 01.07.2020 | ||
| SK | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2023/27] | HU | 12.05.2015 | |
| AL | 01.07.2020 | ||
| AT | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| MC | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SI | 01.07.2020 | ||
| SK | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2022/07] | AL | 01.07.2020 | |
| AT | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| MC | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SI | 01.07.2020 | ||
| SK | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/36] | AL | 01.07.2020 | |
| AT | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SI | 01.07.2020 | ||
| SK | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/28] | AL | 01.07.2020 | |
| AT | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SK | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/25] | AL | 01.07.2020 | |
| AT | 01.07.2020 | ||
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/22] | AT | 01.07.2020 | |
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| EE | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RO | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| SM | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/20] | AT | 01.07.2020 | |
| CZ | 01.07.2020 | ||
| DK | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| IT | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/11] | AT | 01.07.2020 | |
| CZ | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| HR | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| LV | 01.07.2020 | ||
| PL | 01.07.2020 | ||
| RS | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| IS | 01.11.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/09] | AT | 01.07.2020 | |
| CZ | 01.07.2020 | ||
| ES | 01.07.2020 | ||
| FI | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| GR | 02.10.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/08] | ES | 01.07.2020 | |
| FI | 01.07.2020 | ||
| LT | 01.07.2020 | ||
| SE | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| PT | 02.11.2020 | ||
| Former [2021/07] | FI | 01.07.2020 | |
| LT | 01.07.2020 | ||
| BG | 01.10.2020 | ||
| NO | 01.10.2020 | ||
| Former [2021/01] | BG | 01.10.2020 | Documents cited: | Search | [XP] WO2015043683 (ERICSSON TELEFON AB L M et al.) [XP] 1-4,11,15 * page 3, lines 2-17 * * page 5, lines 22-25 * * page 11, lines 4-8 * * page 13, line 14 - page 15, line 2 * * page 18, lines 9-16 * | [XI] WO2013025168 (ERICSSON TELEFON AB L M et al.) [X] 1,10,11,15 * paragraphs [0004] , [0005] , [0009] , [0010] , [0011] , [0013] , [0014] , [0042] - [0064]; figures 1,8,11A, 11B,12, 14 *[I] 2-9,12-14 | [A] US2014045491 (VAN PHAN VINH et al.) [A] 1-15 * the whole document * | [A] NEW POSTCOM: "Considerations on requirements and scenarios of WLAN/3GPP Radio", vol. RAN WG2, no. St. Julian; 20130128 - 20130201, 19 January 2013 (2013-01-19), XP050668305, Retrieved from the Internet | [A] CHINA UNICOM: "Disucussion on Mobile AP scenarios", vol. RAN WG2, no. Chicago; 20130415 - 20130419, 5 April 2013 (2013-04-05), XP050699213, Retrieved from the Internet | [A] NAN CHENG ET AL: "Vehicular WiFi offloading: Challenges and solutions", VEHICULAR COMMUNICATIONS, vol. 1, no. 1, 1 January 2014 (2014-01-01), pages 13 - 21, XP055237591, ISSN: 2214-2096, DOI: 10.1016/j.vehcom.2013.11.002 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1016/j.vehcom.2013.11.002 | [A] IERA A ET AL: "End-to-end QoS provisioning in 4G with mobile hotspots", IEEE NETWORK, IEEE SERVICE CENTER, NEW YORK, NY, US, vol. 19, no. 5, 1 September 2005 (2005-09-01), pages 26 - 34, XP011139502, ISSN: 0890-8044, DOI: 10.1109/MNET.2005.1509949 [A] 1-15 * the whole document * DOI: http://dx.doi.org/10.1109/MNET.2005.1509949 | International search | [YA] WO2013025168 (ERICSSON TELEFON AB L M et al.) [Y] 1-4, 6-7, 11-16 , 19-20, 22-23 * See paragraphs [0010], [0048]-[0054], [0066]; and figure 14. *[A] 5, 8-10, 17-18, 21 , 24-25 | [Y] WO2013144548 (BRITISH TELECOMM et al.) [Y] 4, 14 * See page 19, lines 6-8; and figure 17. * | [A] US2014064068 (HORN GAVIN B et al.) [A] 1-25 * See paragraphs [0083]-[0086]; and figure 9. * | [A] US2013198817 (HADDAD WASSIM et al.) [A] 1-25 * See paragraphs [0042]-[0049]; claim 1; and figures 1, 3. * | [Y] NAN CHENG ET AL.: "Vehicular WiFi offloading: Challenges and solutions", VEHICULAR COMMUNICATIONS, vol. 1, no. Issue 1, January 2014 (2014-01-01), pages 13 - 21, XP055237591, Retrieved from the Internet DOI: http://dx.doi.org/10.1016/j.vehcom.2013.11.002 |