| EP3135475 - COMPOSITE MATERIAL STRUCTURE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 24.12.2021 Database last updated on 08.04.2026 | |
| Former | The patent has been granted Status updated on 15.01.2021 | ||
| Former | Grant of patent is intended Status updated on 03.08.2020 | ||
| Former | Request for examination was made Status updated on 30.12.2016 | ||
| Former | The international publication has been made Status updated on 01.11.2016 | Most recent event Tooltip | 19.12.2025 | Lapse of the patent in a contracting state New state(s): TR | published on 21.01.2026 [2026/04] | Applicant(s) | For all designated states Mitsubishi Heavy Industries, Ltd. 16-5 Konan 2-chome Minato-ku Tokyo 108-8215 / JP | [2017/05] | Inventor(s) | 01 /
SUGIYAMA, Takushi c/o MITSUBISHI HEAVY INDUSTRIES, LTD. 16-5 Konan 2-chome Minato-ku Tokyo 108-8215 / JP | 02 /
SHIMIZU, Takayuki c/o MITSUBISHI HEAVY INDUSTRIES, LTD. 16-5 Konan 2-chome Minato-ku Tokyo 108-8215 / JP | 03 /
ABE, Toshio c/o MITSUBISHI HEAVY INDUSTRIES, LTD. 16-5 Konan 2-chome Minato-ku Tokyo 108-8215 / JP | [2021/07] |
| Former [2017/05] | 01 /
SUGIYAMA, Takushi c/o MITSUBISHI HEAVY INDUSTRIES LTD. 16-5 Konan 2-chome Minato-ku Tokyo 108-8215 / JP | ||
| 02 /
SHIMIZU, Takayuki c/o MITSUBISHI HEAVY INDUSTRIES LTD. 16-5 Konan 2-chome Minato-ku Tokyo 108-8215 / JP | |||
| 03 /
ABE, Toshio c/o MITSUBISHI HEAVY INDUSTRIES LTD. 16-5 Konan 2-chome Minato-ku Tokyo 108-8215 / JP | Representative(s) | Henkel & Partner mbB Patentanwaltskanzlei, Rechtsanwaltskanzlei Maximiliansplatz 21 80333 München / DE | [2021/07] |
| Former [2017/05] | Henkel, Breuer & Partner Patentanwälte Maximiliansplatz 21 80333 München / DE | Application number, filing date | 15803406.6 | 20.05.2015 | [2017/05] | WO2015JP64522 | Priority number, date | JP20140116041 | 04.06.2014 Original published format: JP 2014116041 | [2017/05] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015186526 | Date: | 10.12.2015 | Language: | JA | [2015/49] | Type: | A1 Application with search report | No.: | EP3135475 | Date: | 01.03.2017 | Language: | EN | [2017/09] | Type: | B1 Patent specification | No.: | EP3135475 | Date: | 17.02.2021 | Language: | EN | [2021/07] | Search report(s) | International search report - published on: | JP | 10.12.2015 | (Supplementary) European search report - dispatched on: | EP | 02.01.2017 | Classification | IPC: | B32B5/28, B32B3/14, B32B3/28, B64D29/00, F01D25/24, F02C7/00, H05K7/20 | [2017/05] | CPC: |
F01D25/26 (EP);
B32B3/28 (EP,US);
B32B1/08 (EP);
B32B3/14 (US);
B32B5/02 (EP);
B32B5/26 (EP);
B32B5/28 (US);
B64D29/00 (EP,US);
F01D25/24 (US);
F02C7/00 (US);
F02C7/24 (EP);
F28F21/02 (US);
H05K7/20 (US);
B32B2250/20 (EP);
B32B2260/023 (EP);
B32B2260/046 (EP);
B32B2262/106 (EP,US);
B32B2307/302 (EP);
B32B2307/536 (EP);
B32B2605/18 (EP);
B82Y30/00 (US);
F05D2240/15 (EP);
F05D2250/61 (EP);
F05D2300/603 (EP);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/05] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERBUNDSTOFFSTRUKTUR | [2017/05] | English: | COMPOSITE MATERIAL STRUCTURE | [2017/05] | French: | STRUCTURE EN MATÉRIAU COMPOSITE | [2017/05] | Entry into regional phase | 28.10.2016 | Translation filed | 28.10.2016 | National basic fee paid | 28.10.2016 | Search fee paid | 28.10.2016 | Designation fee(s) paid | 28.10.2016 | Examination fee paid | Examination procedure | 28.10.2016 | Examination requested [2017/05] | 28.10.2016 | Date on which the examining division has become responsible | 09.06.2017 | Amendment by applicant (claims and/or description) | 04.08.2020 | Communication of intention to grant the patent | 09.10.2020 | Fee for grant paid | 09.10.2020 | Fee for publishing/printing paid | 09.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 18.11.2021 | No opposition filed within time limit [2022/04] | Fees paid | Renewal fee | 31.05.2017 | Renewal fee patent year 03 | 18.05.2018 | Renewal fee patent year 04 | 14.05.2019 | Renewal fee patent year 05 | 28.05.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 20.05.2015 | AL | 17.02.2021 | AT | 17.02.2021 | CY | 17.02.2021 | CZ | 17.02.2021 | DK | 17.02.2021 | EE | 17.02.2021 | ES | 17.02.2021 | FI | 17.02.2021 | HR | 17.02.2021 | IT | 17.02.2021 | LT | 17.02.2021 | LV | 17.02.2021 | MC | 17.02.2021 | MK | 17.02.2021 | MT | 17.02.2021 | NL | 17.02.2021 | PL | 17.02.2021 | RO | 17.02.2021 | RS | 17.02.2021 | SE | 17.02.2021 | SI | 17.02.2021 | SK | 17.02.2021 | SM | 17.02.2021 | TR | 17.02.2021 | BG | 17.05.2021 | NO | 17.05.2021 | GR | 18.05.2021 | IE | 20.05.2021 | LU | 20.05.2021 | BE | 31.05.2021 | CH | 31.05.2021 | LI | 31.05.2021 | IS | 17.06.2021 | PT | 17.06.2021 | [2026/04] |
| Former [2024/41] | HU | 20.05.2015 | |
| AL | 17.02.2021 | ||
| AT | 17.02.2021 | ||
| CY | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| IT | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| MK | 17.02.2021 | ||
| MT | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IE | 20.05.2021 | ||
| LU | 20.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2024/22] | HU | 20.05.2015 | |
| AL | 17.02.2021 | ||
| AT | 17.02.2021 | ||
| CY | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| IT | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| MK | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IE | 20.05.2021 | ||
| LU | 20.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2023/30] | HU | 20.05.2015 | |
| AL | 17.02.2021 | ||
| AT | 17.02.2021 | ||
| CY | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| IT | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IE | 20.05.2021 | ||
| LU | 20.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2023/29] | HU | 20.05.2015 | |
| AL | 17.02.2021 | ||
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| IT | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IE | 20.05.2021 | ||
| LU | 20.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2022/34] | AL | 17.02.2021 | |
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| IT | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IE | 20.05.2021 | ||
| LU | 20.05.2021 | ||
| BE | 31.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2022/23] | AL | 17.02.2021 | |
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| IT | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IE | 20.05.2021 | ||
| LU | 20.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2022/21] | AL | 17.02.2021 | |
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IE | 20.05.2021 | ||
| LU | 20.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2022/11] | AL | 17.02.2021 | |
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SI | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| LU | 20.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2022/10] | AL | 17.02.2021 | |
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| LU | 20.05.2021 | ||
| CH | 31.05.2021 | ||
| LI | 31.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2022/09] | AL | 17.02.2021 | |
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| LU | 20.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2022/07] | AL | 17.02.2021 | |
| AT | 17.02.2021 | ||
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| MC | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/51] | AT | 17.02.2021 | |
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| ES | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/50] | AT | 17.02.2021 | |
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RO | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SK | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/49] | AT | 17.02.2021 | |
| CZ | 17.02.2021 | ||
| DK | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/48] | AT | 17.02.2021 | |
| CZ | 17.02.2021 | ||
| EE | 17.02.2021 | ||
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/46] | AT | 17.02.2021 | |
| FI | 17.02.2021 | ||
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| SM | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/42] | FI | 17.02.2021 | |
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| IS | 17.06.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/39] | FI | 17.02.2021 | |
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| PL | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/38] | FI | 17.02.2021 | |
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| NL | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| SE | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/37] | FI | 17.02.2021 | |
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| LV | 17.02.2021 | ||
| RS | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/36] | FI | 17.02.2021 | |
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| BG | 17.05.2021 | ||
| NO | 17.05.2021 | ||
| GR | 18.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/35] | FI | 17.02.2021 | |
| HR | 17.02.2021 | ||
| LT | 17.02.2021 | ||
| NO | 17.05.2021 | ||
| PT | 17.06.2021 | ||
| Former [2021/33] | FI | 17.02.2021 | |
| LT | 17.02.2021 | ||
| NO | 17.05.2021 | ||
| PT | 17.06.2021 | Documents cited: | Search | [X] JP2004019990 (MITSUBISHI ELECTRIC CORP et al.) [X] 1 * EPODOC abstract - "composite material" ; "the upper face (24) of the heat conductive member (15) is joined to an upper skin (16), and a side face (25) of the heat conductive member (15) is joined to the side face.." ; "carbon reinforced resin" ; carbon fiber reinforced carbon" * * figure - * * WPI abstract - "12 : heat generation apparatus" * | [A] US2003170440 (AOYAGI KENICHI et al.) [A] 1-9 * Abstract - "PAN type carbon fiber" ; "pitch type carbon fiber" * * paragraph [0018] - paragraph [0019] * * figures 1, 2, 3, 4, 5 * * example - * * claims 1-13 * | [A] JPH08207180 (SHOWA AIRCRAFT IND et al.) [A] 1-9 * EPODOC abstract - "pitch base carbon fibers" ; "PAN base carbon fibers" ; "heat conductivity" * * figure 1 * * figure 2 * * WPI abstract * | International search | [A] JP2000150946 (NEC CORP et al.) [A] 1-9 * , claims; paragraphs [0011] to [0012], [0019] to [0025]; fig. 1 (Family: none) * | [A] JPH08207180 (SHOWA AIRCRAFT IND et al.) [A] 1-9 * , claims; paragraphs [0006] to [0007], [0018]; fig. 1 (Family: none) * | [A] JP2012112264 (MITSUBISHI PLASTICS INC et al.) [A] 1-9 * , claims; paragraphs [0028] to [0031]; fig. 4 & EP 2455609 A2 * | [A] JPH09500840 [A] 1-9 * , claims; fig. 1 to 11 & US 5466507 A & WO 1995/010411 A1 & AU 7969594 A & LU 88739 A & RU 2118933 C * | [A] JP2001168248 (TOYODA AUTOMATIC LOOM WORKS et al.) [A] 1-9 * , claims; fig. 1 (Family: none) * | [A] JP2011003904 (GENERAL ELECTRIC CO GE et al.) [A] 1-9 * , claim 1; paragraphs [0012] to [0015] & US 2010/0321891 A1 & GB 2471186 A & DE 102010017437 A & CA 2706208 A * | [A] JP2001214702 (GEN ELECTRIC et al.) [A] 1-9 * , claims 1 to 5; fig. 1 to 2 & US 6399217 B1 & EP 1111323 A2 & DE 60045274 D & SG 97994 A & BR 5933 A & IL 140186 A & CA 2327875 A & AT 489598 T & MX PA00012569 A & MY 129511 A * | [A] JP2002194232 (SEKISUI CHEMICAL CO LTD et al.) [A] 1-9 * , claims; paragraphs [0061] to [0064]; fig. 1 to 8 (Family: none) * |