EP3231221 - METHOD FOR EXECUTING A PEERING PHASE BY A WIRELESS ACCESS POINT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 16.08.2019 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 07.09.2018 | ||
Former | Grant of patent is intended Status updated on 10.05.2018 | ||
Former | Request for examination was made Status updated on 15.09.2017 | ||
Former | The international publication has been made Status updated on 09.06.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states Sagemcom Broadband SAS 250, route de l'Empereur 92500 Rueil-Malmaison / FR | [2017/42] | Inventor(s) | 01 /
VANKIEKEN, Nicolas Sagemcom Broadband SAS 250 route de l'Empereur 92500 Rueil Malmaison / FR | [2017/42] | Representative(s) | Cabinet Le Guen Maillet 3, impasse de la Vigie CS 71840 35418 Saint-Malo Cedex / FR | [2018/41] |
Former [2017/42] | Le Guen-Maillet 5, place de Newquay BP 70250 35802 Dinard Cedex / FR | Application number, filing date | 15805499.9 | 08.12.2015 | [2017/42] | WO2015EP78941 | Priority number, date | FR20140062219 | 11.12.2014 Original published format: FR 1462219 | [2017/42] | Filing language | FR | Procedural language | FR | Publication | Type: | A1 Application with search report | No.: | WO2016091862 | Date: | 16.06.2016 | Language: | FR | [2016/24] | Type: | A1 Application with search report | No.: | EP3231221 | Date: | 18.10.2017 | Language: | FR | The application published by WIPO in one of the EPO official languages on 16.06.2016 takes the place of the publication of the European patent application. | [2017/42] | Type: | B1 Patent specification | No.: | EP3231221 | Date: | 10.10.2018 | Language: | FR | [2018/41] | Search report(s) | International search report - published on: | EP | 16.06.2016 | Classification | IPC: | H04W48/06, H04W48/12, H04W84/12 | [2017/42] | CPC: |
H04W48/06 (EP,CN,US);
H04W76/14 (US);
H04W4/80 (EP,US);
H04W48/16 (US);
H04W48/12 (EP,CN,US);
H04W84/12 (EP,CN,US);
H04W88/08 (US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN ZUR AUSFÜHRUNG EINES PEERINGPHASE DURCH EINEN DRAHTLOSEN ZUGANGSPUNKT | [2017/42] | English: | METHOD FOR EXECUTING A PEERING PHASE BY A WIRELESS ACCESS POINT | [2017/42] | French: | PROCÉDÉ D'EXÉCUTION D'UNE PHASE D'APPAIRAGE PAR UN POINT D'ACCÈS SANS-FIL | [2017/42] | Entry into regional phase | 08.06.2017 | National basic fee paid | 08.06.2017 | Designation fee(s) paid | 08.06.2017 | Examination fee paid | Examination procedure | 08.06.2017 | Examination requested [2017/42] | 08.06.2017 | Date on which the examining division has become responsible | 05.02.2018 | Amendment by applicant (claims and/or description) | 11.05.2018 | Communication of intention to grant the patent | 28.08.2018 | Fee for grant paid | 28.08.2018 | Fee for publishing/printing paid | 28.08.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 11.07.2019 | No opposition filed within time limit [2019/38] | Fees paid | Renewal fee | 21.12.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 08.12.2015 | AL | 10.10.2018 | AT | 10.10.2018 | CY | 10.10.2018 | CZ | 10.10.2018 | DK | 10.10.2018 | EE | 10.10.2018 | ES | 10.10.2018 | FI | 10.10.2018 | HR | 10.10.2018 | IT | 10.10.2018 | LT | 10.10.2018 | LV | 10.10.2018 | MC | 10.10.2018 | MK | 10.10.2018 | MT | 10.10.2018 | NL | 10.10.2018 | PL | 10.10.2018 | RO | 10.10.2018 | RS | 10.10.2018 | SE | 10.10.2018 | SI | 10.10.2018 | SK | 10.10.2018 | SM | 10.10.2018 | TR | 10.10.2018 | IE | 08.12.2018 | LU | 08.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | BG | 10.01.2019 | NO | 10.01.2019 | GR | 11.01.2019 | IS | 10.02.2019 | PT | 10.02.2019 | [2020/31] |
Former [2020/17] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
MT | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
SM | 10.10.2018 | ||
TR | 10.10.2018 | ||
IE | 08.12.2018 | ||
LU | 08.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2020/08] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
MT | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
SM | 10.10.2018 | ||
IE | 08.12.2018 | ||
LU | 08.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2020/04] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
SM | 10.10.2018 | ||
IE | 08.12.2018 | ||
LU | 08.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/50] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SI | 10.10.2018 | ||
SK | 10.10.2018 | ||
SM | 10.10.2018 | ||
IE | 08.12.2018 | ||
LU | 08.12.2018 | ||
BE | 31.12.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/48] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SK | 10.10.2018 | ||
SM | 10.10.2018 | ||
IE | 08.12.2018 | ||
LU | 08.12.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/40] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
MC | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SK | 10.10.2018 | ||
SM | 10.10.2018 | ||
LU | 08.12.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/39] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SK | 10.10.2018 | ||
SM | 10.10.2018 | ||
LU | 08.12.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/37] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
EE | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RO | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
SM | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/35] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
CZ | 10.10.2018 | ||
DK | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/34] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
DK | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
IT | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/26] | AL | 10.10.2018 | |
AT | 10.10.2018 | ||
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
PT | 10.02.2019 | ||
Former [2019/25] | AT | 10.10.2018 | |
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
RS | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/24] | AT | 10.10.2018 | |
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
SE | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
GR | 11.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/23] | AT | 10.10.2018 | |
ES | 10.10.2018 | ||
FI | 10.10.2018 | ||
HR | 10.10.2018 | ||
LT | 10.10.2018 | ||
LV | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/22] | FI | 10.10.2018 | |
LT | 10.10.2018 | ||
NL | 10.10.2018 | ||
PL | 10.10.2018 | ||
BG | 10.01.2019 | ||
NO | 10.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/21] | FI | 10.10.2018 | |
LT | 10.10.2018 | ||
NL | 10.10.2018 | ||
NO | 10.01.2019 | ||
IS | 10.02.2019 | ||
Former [2019/20] | LT | 10.10.2018 | |
NL | 10.10.2018 | ||
NO | 10.01.2019 | ||
Former [2019/17] | NL | 10.10.2018 | Cited in | International search | [A]EP2528391 (VODAFONE IP LICENSING LTD [GB]) [A] 1-11 * paragraphs [0007] - [0011] * * paragraph [0029] * * paragraph [0043] * * paragraph [0054] ** paragraph [0057] *; | [A] - Kevin 0 Robinson ET AL, "Wi-Fi Simple Configuration Protocol and Usability Best Practices for the Wi-Fi Protected Setup(TM) Program Version 2.0.1", (20110420), URL: http://www.wi-fi.org/system/files/wsc_best_practices_v2_0_1.pdf, (20140522), XP055119577 [A] 1-11 * Section 3. Wi-Fi Simple Configuration Best Practice * | [A] - "Configuration Guide for RFMS 3.0 Initial Configuration XXX-XXXXXX-XX [WiNG 5.1 ] How-To Guide [Client Load Balancing and Smart Band Control] [Month] 2009 Revision [Rev]", (20090101), pages 1 - 34, URL: http://www.michaelfmcnamara.com/files/motorola/WiNG5_Load-Balance_How-to.pdf, (20150729), XP055205385 [A] 1-11 * pages 4-7 * |