EP3160068 - METHOD AND DEVICE FOR CONTROLLING RECEPTION OF BROADCAST SERVICE PROVIDED BY MEANS OF APPLICATION LAYER FORWARD ERROR CORRECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.03.2021 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 03.04.2020 | ||
Former | Grant of patent is intended Status updated on 29.11.2019 | ||
Former | Examination is in progress Status updated on 22.03.2019 | ||
Former | Request for examination was made Status updated on 24.03.2017 | ||
Former | The international publication has been made Status updated on 20.01.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Samsung Electronics Co., Ltd. 129, Samsung-ro Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2017/17] | Inventor(s) | 01 /
YANG, Hyun-Koo C/O SAMSUNG ELECTRONICS CO., LTD. 129, Samsung-ro, Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | 02 /
HWANG, Sung-Hee C/O SAMSUNG ELECTRONICS CO., LTD. 129, Samsung-ro, Yeongtong-gu Suwon-si Gyeonggi-do 16677 / KR | [2017/17] | Representative(s) | Nederlandsch Octrooibureau P.O. Box 29720 2502 LS The Hague / NL | [2017/17] | Application number, filing date | 15810288.9 | 19.06.2015 | [2017/17] | WO2015KR06235 | Priority number, date | KR20140076091 | 20.06.2014 Original published format: KR 20140076091 | [2017/17] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2015194903 | Date: | 23.12.2015 | Language: | KO | [2015/51] | Type: | A1 Application with search report | No.: | EP3160068 | Date: | 26.04.2017 | Language: | EN | [2017/17] | Type: | B1 Patent specification | No.: | EP3160068 | Date: | 06.05.2020 | Language: | EN | [2020/19] | Search report(s) | International search report - published on: | KR | 23.12.2015 | (Supplementary) European search report - dispatched on: | EP | 05.02.2018 | Classification | IPC: | H04H40/18, H04L1/00, H04N21/234, H04N21/647, H04N21/242 | [2018/10] | CPC: |
H04L1/0023 (EP,US);
H04N21/234 (US);
H04H40/18 (EP,US);
H04L1/0047 (US);
H04N21/242 (US);
H04N21/647 (US)
|
Former IPC [2017/17] | H04H40/18 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/17] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNG ZUR STEUERUNG DES EMPFANGS EINES ÜBER VORWÄRTSFEHLERKORREKTUR AUF ANWENDUNGSSCHICHT BEREITGESTELLTEN RUNDFUNKDIENSTES | [2017/17] | English: | METHOD AND DEVICE FOR CONTROLLING RECEPTION OF BROADCAST SERVICE PROVIDED BY MEANS OF APPLICATION LAYER FORWARD ERROR CORRECTION | [2017/17] | French: | PROCÉDÉ ET DISPOSITIF POUR COMMANDER LA RÉCEPTION D'UN SERVICE DE DIFFUSION FOURNI AU MOYEN D'UNE CORRECTION D'ERREURS SANS VOIE DE RETOUR DE COUCHE APPLICATION | [2017/17] | Entry into regional phase | 20.01.2017 | Translation filed | 20.01.2017 | National basic fee paid | 20.01.2017 | Search fee paid | 20.01.2017 | Designation fee(s) paid | 20.01.2017 | Examination fee paid | Examination procedure | 20.01.2017 | Examination requested [2017/17] | 20.01.2017 | Date on which the examining division has become responsible | 03.08.2018 | Amendment by applicant (claims and/or description) | 27.03.2019 | Despatch of a communication from the examining division (Time limit: M04) | 25.07.2019 | Reply to a communication from the examining division | 28.11.2019 | Communication of intention to grant the patent | 27.03.2020 | Fee for grant paid | 27.03.2020 | Fee for publishing/printing paid | 27.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 09.02.2021 | No opposition filed within time limit [2021/15] | Fees paid | Renewal fee | 23.05.2017 | Renewal fee patent year 03 | 22.06.2018 | Renewal fee patent year 04 | 21.06.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.06.2015 | AL | 06.05.2020 | AT | 06.05.2020 | CY | 06.05.2020 | CZ | 06.05.2020 | DK | 06.05.2020 | EE | 06.05.2020 | ES | 06.05.2020 | FI | 06.05.2020 | HR | 06.05.2020 | IT | 06.05.2020 | LT | 06.05.2020 | LV | 06.05.2020 | MC | 06.05.2020 | MK | 06.05.2020 | MT | 06.05.2020 | NL | 06.05.2020 | PL | 06.05.2020 | RO | 06.05.2020 | RS | 06.05.2020 | SE | 06.05.2020 | SI | 06.05.2020 | SK | 06.05.2020 | SM | 06.05.2020 | TR | 06.05.2020 | IE | 19.06.2020 | LU | 19.06.2020 | BE | 30.06.2020 | CH | 30.06.2020 | LI | 30.06.2020 | BG | 06.08.2020 | NO | 06.08.2020 | GR | 07.08.2020 | IS | 06.09.2020 | PT | 07.09.2020 | [2022/32] |
Former [2022/27] | HU | 19.06.2015 | |
AL | 06.05.2020 | ||
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
MT | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
TR | 06.05.2020 | ||
IE | 19.06.2020 | ||
LU | 19.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/24] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
IE | 19.06.2020 | ||
LU | 19.06.2020 | ||
BE | 30.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/20] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
IE | 19.06.2020 | ||
LU | 19.06.2020 | ||
CH | 30.06.2020 | ||
LI | 30.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/15] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
LU | 19.06.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/13] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/10] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/09] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/08] | AL | 06.05.2020 | |
DK | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/04] | AL | 06.05.2020 | |
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/01] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/51] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/50] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/48] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/47] | LT | 06.05.2020 | |
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/46] | IS | 06.09.2020 | Documents cited: | Search | [X]WO2013077662 (SAMSUNG ELECTRONICS CO LTD [KR]) [X] 1-14 * figures 3,17,19 * * tables 3,5 *; | [XAI]US2014098811 (BOUAZIZI IMED [US], et al) [X] 1,6-8,10,11,13 * figures 5,6 * * paragraph [0020] * * paragraph [0040] - paragraph [0041] * * paragraph [0034] - paragraph [0036] * * paragraph [0045] - paragraph [0047] * [A] 3,4,9 [I] 2,5,12,14; | [XP]EP2784964 (SAMSUNG ELECTRONICS CO LTD [KR]) [XP] 1-14 * figures 3,17,19 * * tables 3,5 * * paragraph [0095] - paragraph [0102] * * paragraph [0111] * * paragraph [0136] - paragraph [0137] *; | [A] - Shanghai ET AL, "Study of ISO/IEC CD 23008-1 MPEG Media Transport", ISO/IEC JTC1/SC29/WG11 MPEG/N13089, (20121001), URL: http://mpeg.chiariglione.org/standards/mpeg-h/mpeg-media-transport/study-isoiec-cd-23008-1-mpeg-media-transport, (20160928), XP055306392 [A] 1-14 * Section 3.1, Section 6.3.1, Section 9 * | International search | [A]US2008022190 (VER STEEG WILLIAM C [US]) [A] 1-14 * See paragraphs [0053]-[0060] and figure 6. *; | [YA]WO2013077662 (SAMSUNG ELECTRONICS CO LTD [KR]) [Y] 1-2, 4-5, 8-9, 11-12 * See paragraphs [0076], [0029] and [0475]-[0481]; claims 1, 4-5, 10, 12 and 21; and figures 18-19. * [A] 3, 6-7, 10, 13-14; | [Y]WO2013112027 (KOREA ELECTRONICS TELECOMM [KR]) [Y] 1-2, 4-5, 8-9, 11-12 * See paragraphs [0182] and [0185]; claims 1 and 16; and figures 9 and 11. *; | [A]US2014105310 (HWANG SUNG-HEE [KR], et al) [A] 1-14* See paragraphs [0123]-[0127] and figure 8. *; | [A] - ALI C. BEGEN, "Error Control for IPTV over xDSL Networks", Proceedings of the 5th IEEE Consumer Communications and Networking Conference (CCNC 2008, (20080110), pages 632 - 637, XP031211955 [A] 1-14 * See pages 633-634. * |