EP3221727 - SYSTEM FOR ASYMMETRIC OPTICAL BEAM SHAPING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 21.01.2022 Database last updated on 02.11.2024 | |
Former | The patent has been granted Status updated on 12.02.2021 | ||
Former | Grant of patent is intended Status updated on 29.09.2020 | ||
Former | Request for examination was made Status updated on 06.08.2020 | ||
Former | Grant of patent is intended Status updated on 21.04.2020 | ||
Former | Request for examination was made Status updated on 25.08.2017 | ||
Former | The international publication has been made Status updated on 07.06.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Trumpf Laser- und Systemtechnik GmbH Johann-Maus-Strasse 2 71254 Ditzingen / DE | [2017/39] | Inventor(s) | 01 /
KUMKAR, Malte Am Wäldchen 10 99425 Weimar / DE | 02 /
KLEINER, Jonas Burgenlandstraße 94 70469 Stuttgart / DE | 03 /
GROSSMANN, Daniel Rosenstraße 3 73079 Süßen / DE | 04 /
FLAMM, Daniel Maybachstraße 19 70469 Stuttgart / DE | 05 /
KAISER, Myriam Talstraße 17 71254 Ditzingen / DE | [2017/39] | Representative(s) | Grättinger Möhring von Poschinger Patentanwälte Partnerschaft mbB Wittelsbacherstrasse 2b 82319 Starnberg / DE | [2021/11] |
Former [2017/39] | Kramer Barske Schmidtchen Patentanwälte PartG mbB European Patent Attorneys Landsberger Strasse 300 80687 München / DE | Application number, filing date | 15813274.6 | 19.11.2015 | [2017/39] | WO2015EP77172 | Priority number, date | DE201410116957 | 19.11.2014 Original published format: DE102014116957 | DE201410116958 | 19.11.2014 Original published format: DE102014116958 | [2017/39] | Filing language | DE | Procedural language | DE | Publication | Type: | A1 Application with search report | No.: | WO2016079275 | Date: | 26.05.2016 | Language: | DE | [2016/21] | Type: | A1 Application with search report | No.: | EP3221727 | Date: | 27.09.2017 | Language: | DE | The application published by WIPO in one of the EPO official languages on 26.05.2016 takes the place of the publication of the European patent application. | [2017/39] | Type: | B1 Patent specification | No.: | EP3221727 | Date: | 17.03.2021 | Language: | DE | [2021/11] | Search report(s) | International search report - published on: | EP | 26.05.2016 | Classification | IPC: | G02B5/00, B23K26/00, B23K26/06, G02B27/09 | [2017/39] | CPC: |
B23K26/53 (EP,KR,US);
G02B27/0944 (CN,KR);
B23K26/042 (US);
B23K26/046 (US);
B23K26/06 (KR,US);
B23K26/064 (EP,CN,US);
B23K26/073 (EP,US);
G02B27/0927 (CN);
G02B27/095 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEM ZUR ASYMMETRISCHEN OPTISCHEN STRAHLFORMUNG | [2017/39] | English: | SYSTEM FOR ASYMMETRIC OPTICAL BEAM SHAPING | [2017/39] | French: | SYSTÈME DE FORMAGE PAR FAISCEAU OPTIQUE ASYMÉTRIQUE | [2017/39] | Entry into regional phase | 07.06.2017 | National basic fee paid | 07.06.2017 | Designation fee(s) paid | 07.06.2017 | Examination fee paid | Examination procedure | 07.06.2017 | Examination requested [2017/39] | 07.06.2017 | Date on which the examining division has become responsible | 15.12.2017 | Amendment by applicant (claims and/or description) | 22.04.2020 | Communication of intention to grant the patent | 04.08.2020 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 30.09.2020 | Communication of intention to grant the patent | 05.02.2021 | Fee for grant paid | 05.02.2021 | Fee for publishing/printing paid | 05.02.2021 | Receipt of the translation of the claim(s) | Divisional application(s) | EP21155453.0 / EP3854513 | Opposition(s) | 20.12.2021 | No opposition filed within time limit [2022/08] | Fees paid | Renewal fee | 24.11.2017 | Renewal fee patent year 03 | 22.11.2018 | Renewal fee patent year 04 | 26.11.2019 | Renewal fee patent year 05 | 20.11.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 19.11.2015 | AL | 17.03.2021 | CY | 17.03.2021 | CZ | 17.03.2021 | DK | 17.03.2021 | EE | 17.03.2021 | ES | 17.03.2021 | FI | 17.03.2021 | HR | 17.03.2021 | IT | 17.03.2021 | LT | 17.03.2021 | LV | 17.03.2021 | MC | 17.03.2021 | MK | 17.03.2021 | MT | 17.03.2021 | NL | 17.03.2021 | PL | 17.03.2021 | RO | 17.03.2021 | RS | 17.03.2021 | SE | 17.03.2021 | SI | 17.03.2021 | SK | 17.03.2021 | SM | 17.03.2021 | BG | 17.06.2021 | NO | 17.06.2021 | GR | 18.06.2021 | IS | 17.07.2021 | PT | 19.07.2021 | AT | 19.11.2021 | IE | 19.11.2021 | LU | 19.11.2021 | BE | 30.11.2021 | CH | 30.11.2021 | LI | 30.11.2021 | [2024/41] |
Former [2024/22] | HU | 19.11.2015 | |
AL | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
MK | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
AT | 19.11.2021 | ||
IE | 19.11.2021 | ||
LU | 19.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2023/30] | HU | 19.11.2015 | |
AL | 17.03.2021 | ||
CY | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
AT | 19.11.2021 | ||
IE | 19.11.2021 | ||
LU | 19.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2023/29] | HU | 19.11.2015 | |
AL | 17.03.2021 | ||
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
AT | 19.11.2021 | ||
IE | 19.11.2021 | ||
LU | 19.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2023/07] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
AT | 19.11.2021 | ||
IE | 19.11.2021 | ||
LU | 19.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/48] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
IE | 19.11.2021 | ||
LU | 19.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/37] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
LU | 19.11.2021 | ||
BE | 30.11.2021 | ||
CH | 30.11.2021 | ||
LI | 30.11.2021 | ||
Former [2022/34] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
LU | 19.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/33] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
MC | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
BE | 30.11.2021 | ||
Former [2022/23] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
IT | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/13] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SI | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/10] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2022/08] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
DK | 17.03.2021 | ||
EE | 17.03.2021 | ||
ES | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2022/07] | AL | 17.03.2021 | |
CZ | 17.03.2021 | ||
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/52] | CZ | 17.03.2021 | |
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
PL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/51] | CZ | 17.03.2021 | |
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
IS | 17.07.2021 | ||
PT | 19.07.2021 | ||
Former [2021/50] | CZ | 17.03.2021 | |
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RO | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SK | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
PT | 19.07.2021 | ||
Former [2021/48] | CZ | 17.03.2021 | |
EE | 17.03.2021 | ||
FI | 17.03.2021 | ||
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/46] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LT | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
SM | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/43] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
NL | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/38] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
SE | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/37] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
LV | 17.03.2021 | ||
RS | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/36] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
BG | 17.06.2021 | ||
NO | 17.06.2021 | ||
GR | 18.06.2021 | ||
Former [2021/35] | FI | 17.03.2021 | |
HR | 17.03.2021 | ||
NO | 17.06.2021 | ||
Former [2021/33] | FI | 17.03.2021 | |
NO | 17.06.2021 | Cited in | International search | [X]US2003102291 (LIU XINBING [US], et al) [X] 1-29 * figures 1,4 *; | [X]WO2012041711 (JENOPTIK OPTICAL SYS GMBH [DE], et al) [X] 1-29 * figure 3 *; | [X]WO2013138802 (IPG MICROSYSTEMS LLC [US]) [X] 1-29* figure 1 *; | [X]EP2754524 (CORNING LASER TECHNOLOGIES GMBH [DE]) [X] 1-29 * figure 3a * * paragraph [0061]; figure 4 * |