| EP3231117 - ENHANCED PERFORMANCE HYBRID-ARQ [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 02.08.2019 Database last updated on 21.03.2026 | |
| Former | The patent has been granted Status updated on 24.08.2018 | ||
| Former | Grant of patent is intended Status updated on 22.08.2018 | ||
| Former | Request for examination was made Status updated on 16.07.2018 | ||
| Former | Grant of patent is intended Status updated on 09.04.2018 | ||
| Former | Request for examination was made Status updated on 15.09.2017 | ||
| Former | The international publication has been made Status updated on 28.06.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states King Abdullah University of Science and Technology 4700 King Abdullah University of Science and Technology Thuwal 23955-6900 / SA | [2017/42] | Inventor(s) | 01 /
FAREED, Muhammad Mehboob 4700 King Abdullah University of Science and Technology Thuwal 23955-6900 / SA | 02 /
YANG, Hong-chuan PO Box 3055 STN CSC Victoria British Columbia V8W 3P6 / CA | 03 /
ALOUINI, Mohamed-slim 4700 King Abdullah University of Science and Technology Thuwal 23955-6900 / SA | [2017/42] | Representative(s) | Hervouet-Malbec, Sylvie, et al Ipsilon Le Centralis 63, avenue du Général Leclerc 92340 Bourg-la-Reine / FR | [2017/42] | Application number, filing date | 15813575.6 | 04.12.2015 | [2017/42] | WO2015IB59380 | Priority number, date | US201462088870P | 08.12.2014 Original published format: US 201462088870 P | [2017/42] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016092443 | Date: | 16.06.2016 | Language: | EN | [2016/24] | Type: | A1 Application with search report | No.: | EP3231117 | Date: | 18.10.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 16.06.2016 takes the place of the publication of the European patent application. | [2017/42] | Type: | B1 Patent specification | No.: | EP3231117 | Date: | 26.09.2018 | Language: | EN | [2018/39] | Search report(s) | International search report - published on: | EP | 16.06.2016 | Classification | IPC: | H04L1/00, H04L1/18 | [2017/42] | CPC: |
H04L1/1812 (EP,US);
H04L1/0054 (EP,US);
H04L1/1893 (EP,US);
H04L1/1896 (US);
H04W88/02 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/42] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | HYBRID-ARQ MIT VERBESSERTER LEISTUNG | [2017/42] | English: | ENHANCED PERFORMANCE HYBRID-ARQ | [2017/42] | French: | PERFORMANCE AMÉLIORÉE D'ARQ HYBRIDE | [2017/42] | Entry into regional phase | 27.06.2017 | National basic fee paid | 27.06.2017 | Designation fee(s) paid | 27.06.2017 | Examination fee paid | Examination procedure | 27.06.2017 | Amendment by applicant (claims and/or description) | 27.06.2017 | Examination requested [2017/42] | 27.06.2017 | Date on which the examining division has become responsible | 10.04.2018 | Communication of intention to grant the patent | 04.07.2018 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 04.07.2018 | Fee for grant paid | 04.07.2018 | Fee for publishing/printing paid | 22.08.2018 | Information about intention to grant a patent | 22.08.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 27.06.2019 | No opposition filed within time limit [2019/36] | Fees paid | Renewal fee | 13.12.2017 | Renewal fee patent year 03 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 04.12.2015 | AL | 26.09.2018 | AT | 26.09.2018 | CY | 26.09.2018 | CZ | 26.09.2018 | DK | 26.09.2018 | EE | 26.09.2018 | ES | 26.09.2018 | FI | 26.09.2018 | HR | 26.09.2018 | IT | 26.09.2018 | LT | 26.09.2018 | LV | 26.09.2018 | MC | 26.09.2018 | MK | 26.09.2018 | NL | 26.09.2018 | PL | 26.09.2018 | RO | 26.09.2018 | RS | 26.09.2018 | SE | 26.09.2018 | SI | 26.09.2018 | SK | 26.09.2018 | SM | 26.09.2018 | TR | 26.09.2018 | IE | 04.12.2018 | LU | 04.12.2018 | MT | 04.12.2018 | BG | 26.12.2018 | NO | 26.12.2018 | GR | 27.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | IS | 26.01.2019 | PT | 26.01.2019 | [2020/31] |
| Former [2020/17] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| MC | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SI | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| TR | 26.09.2018 | ||
| IE | 04.12.2018 | ||
| LU | 04.12.2018 | ||
| MT | 04.12.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| BE | 31.12.2018 | ||
| CH | 31.12.2018 | ||
| LI | 31.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2020/08] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| MC | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SI | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| IE | 04.12.2018 | ||
| LU | 04.12.2018 | ||
| MT | 04.12.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| BE | 31.12.2018 | ||
| CH | 31.12.2018 | ||
| LI | 31.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2020/04] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| MC | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SI | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| IE | 04.12.2018 | ||
| LU | 04.12.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| BE | 31.12.2018 | ||
| CH | 31.12.2018 | ||
| LI | 31.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2019/50] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| MC | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SI | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| IE | 04.12.2018 | ||
| LU | 04.12.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| BE | 31.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2019/48] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| MC | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| IE | 04.12.2018 | ||
| LU | 04.12.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2019/40] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| MC | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| LU | 04.12.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2019/39] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| LU | 04.12.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2019/34] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| DK | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2019/26] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| SM | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| PT | 26.01.2019 | ||
| Former [2019/23] | AL | 26.09.2018 | |
| AT | 26.09.2018 | ||
| CZ | 26.09.2018 | ||
| EE | 26.09.2018 | ||
| ES | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| SK | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| Former [2019/22] | AL | 26.09.2018 | |
| CZ | 26.09.2018 | ||
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| PL | 26.09.2018 | ||
| RO | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| Former [2019/21] | AL | 26.09.2018 | |
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| IT | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| IS | 26.01.2019 | ||
| Former [2019/20] | AL | 26.09.2018 | |
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| NL | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| Former [2019/12] | AL | 26.09.2018 | |
| FI | 26.09.2018 | ||
| HR | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| LV | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| Former [2019/11] | FI | 26.09.2018 | |
| HR | 26.09.2018 | ||
| LT | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| Former [2019/10] | FI | 26.09.2018 | |
| LT | 26.09.2018 | ||
| RS | 26.09.2018 | ||
| SE | 26.09.2018 | ||
| BG | 26.12.2018 | ||
| NO | 26.12.2018 | ||
| GR | 27.12.2018 | ||
| Former [2019/08] | FI | 26.09.2018 | |
| LT | 26.09.2018 | ||
| NO | 26.12.2018 | ||
| Former [2019/07] | LT | 26.09.2018 | Cited in | International search | [XA] KAN ZHENG ET AL: "Design and Performance of Space-Time Precoder With Hybrid ARQ Transmission", IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, IEEE SERVICE CENTER, PISCATAWAY, NJ, US, vol. 58, no. 4, 1 May 2009 (2009-05-01), pages 1816 - 1822, XP011248737, ISSN: 0018-9545 | by applicant | WENGERTER ET AL.: "Advanced hybrid ARQ technique employing a signal constellation rearrangement", PROC. OF IEEE 56TH VEHICULAR TECHNOLOGY CONFERENCE (VTC 2002-FALL), September 2002 (2002-09-01), pages 2002 - 2006, XP010608782, DOI: doi:10.1109/VETECF.2002.1040569 DOI: http://dx.doi.org/10.1109/VETECF.2002.1040569 | "Enhanced HARQ method with signal constellation rearrangement", TSG-RAN WORKING GROUP 1 MEETING, February 2001 (2001-02-01) |