EP3164745 - HIGH POWER VISIBLE LASER WITH A LASER-FABRICATED NONLINEAR WAVEGUIDE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.10.2021 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 30.10.2020 | ||
Former | Grant of patent is intended Status updated on 25.06.2020 | ||
Former | Examination is in progress Status updated on 19.10.2019 | ||
Former | Request for examination was made Status updated on 07.04.2017 | ||
Former | The international publication has been made Status updated on 16.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Dolby Laboratories Licensing Corporation 1275 Market Street San Francisco, CA 94103 / US | [2020/48] |
Former [2017/19] | For all designated states Dolby Laboratories Licensing Corp. 1275 Market Street San Francisco, CA 94103 / US | Inventor(s) | 01 /
MILLER, Gregory David c/o Dolby Laboratories INC. 1275 Market Street San Francisco, California 94103 / US | 02 /
IMESHEV, Gennady 28 Misty Meadows Irvine, California 92612 / US | [2017/19] | Representative(s) | Dolby International AB Patent Group Europe 77 Sir John Rogerson's Quay Block C Grand Canal Docklands Dublin, D02 VK60 / IE | [N/P] |
Former [2017/19] | Dolby International AB Patent Group Europe Apollo Building, 3E Herikerbergweg 1-35 1101 CN Amsterdam Zuidoost / NL | Application number, filing date | 15814827.0 | 29.06.2015 | [2017/19] | WO2015US38366 | Priority number, date | US201462019601P | 01.07.2014 Original published format: US 201462019601 P | US201462035674P | 11.08.2014 Original published format: US 201462035674 P | [2017/19] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016003931 | Date: | 07.01.2016 | Language: | EN | [2016/01] | Type: | A1 Application with search report | No.: | EP3164745 | Date: | 10.05.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.01.2016 takes the place of the publication of the European patent application. | [2017/19] | Type: | B1 Patent specification | No.: | EP3164745 | Date: | 02.12.2020 | Language: | EN | [2020/49] | Search report(s) | International search report - published on: | US | 07.01.2016 | (Supplementary) European search report - dispatched on: | EP | 02.05.2018 | Classification | IPC: | G02B6/00, H01P3/00, G02F1/377, // G02F1/35, G02B6/12 | [2018/09] | CPC: |
G02F1/365 (EP,US);
G02B6/12004 (EP,US);
G02B6/13 (EP,US);
G02F1/353 (EP,US);
G02F1/3551 (EP,US);
G02F1/377 (EP,US);
H01S5/0092 (EP,US);
H01S5/4012 (US);
H01S5/4025 (US);
G02B2006/1204 (EP,US);
G02B2006/12045 (EP,US);
G02B2006/12054 (EP,US);
G02B2006/12097 (EP,US);
G02B2006/121 (EP,US);
G02F2201/063 (US);
G02F2202/20 (US)
(-)
|
Former IPC [2017/19] | G02B6/00, H01P3/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/19] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | HOCHLEISTUNGSFÄHIGER SICHTBARER LASER MIT EINEM LASERGEFERTIGTEN NICHTLINEAREN WELLENLEITER | [2017/19] | English: | HIGH POWER VISIBLE LASER WITH A LASER-FABRICATED NONLINEAR WAVEGUIDE | [2017/19] | French: | LASER VISIBLE HAUTE PUISSANCE AYANT UN GUIDE D'ONDES NON LINÉAIRE FABRIQUÉ PAR UN LASER | [2017/19] | Entry into regional phase | 01.02.2017 | National basic fee paid | 01.02.2017 | Search fee paid | 01.02.2017 | Designation fee(s) paid | 01.02.2017 | Examination fee paid | Examination procedure | 29.12.2016 | Date on which the examining division has become responsible | 01.02.2017 | Examination requested [2017/19] | 12.11.2018 | Amendment by applicant (claims and/or description) | 23.10.2019 | Despatch of a communication from the examining division (Time limit: M04) | 12.02.2020 | Reply to a communication from the examining division | 26.06.2020 | Communication of intention to grant the patent | 19.10.2020 | Fee for grant paid | 19.10.2020 | Fee for publishing/printing paid | 19.10.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 03.09.2021 | No opposition filed within time limit [2021/45] | Fees paid | Renewal fee | 27.06.2017 | Renewal fee patent year 03 | 27.06.2018 | Renewal fee patent year 04 | 27.06.2019 | Renewal fee patent year 05 | 22.06.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.06.2015 | AL | 02.12.2020 | AT | 02.12.2020 | CY | 02.12.2020 | CZ | 02.12.2020 | DK | 02.12.2020 | EE | 02.12.2020 | ES | 02.12.2020 | FI | 02.12.2020 | HR | 02.12.2020 | IT | 02.12.2020 | LT | 02.12.2020 | LV | 02.12.2020 | MC | 02.12.2020 | MK | 02.12.2020 | MT | 02.12.2020 | NL | 02.12.2020 | PL | 02.12.2020 | RO | 02.12.2020 | RS | 02.12.2020 | SE | 02.12.2020 | SI | 02.12.2020 | SK | 02.12.2020 | SM | 02.12.2020 | TR | 02.12.2020 | BG | 02.03.2021 | NO | 02.03.2021 | GR | 03.03.2021 | IS | 02.04.2021 | PT | 05.04.2021 | IE | 29.06.2021 | LU | 29.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | [2024/41] |
Former [2024/29] | HU | 29.06.2015 | |
AL | 02.12.2020 | ||
AT | 02.12.2020 | ||
CY | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
MK | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
TR | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2024/22] | HU | 29.06.2015 | |
AL | 02.12.2020 | ||
AT | 02.12.2020 | ||
CY | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
MK | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/30] | HU | 29.06.2015 | |
AL | 02.12.2020 | ||
AT | 02.12.2020 | ||
CY | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2023/29] | HU | 29.06.2015 | |
AL | 02.12.2020 | ||
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/34] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
BE | 30.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/23] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/21] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
IE | 29.06.2021 | ||
LU | 29.06.2021 | ||
CH | 30.06.2021 | ||
LI | 30.06.2021 | ||
Former [2022/18] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
LU | 29.06.2021 | ||
Former [2022/10] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
Former [2022/08] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
MC | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
Former [2021/51] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
ES | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
Former [2021/49] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
DK | 02.12.2020 | ||
EE | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SI | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
Former [2021/48] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
EE | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
IT | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
Former [2021/45] | AL | 02.12.2020 | |
AT | 02.12.2020 | ||
CZ | 02.12.2020 | ||
EE | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
Former [2021/42] | AT | 02.12.2020 | |
CZ | 02.12.2020 | ||
EE | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
IS | 02.04.2021 | ||
PT | 05.04.2021 | ||
Former [2021/37] | AT | 02.12.2020 | |
CZ | 02.12.2020 | ||
EE | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
Former [2021/36] | CZ | 02.12.2020 | |
EE | 02.12.2020 | ||
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
Former [2021/35] | CZ | 02.12.2020 | |
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RO | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SK | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
Former [2021/34] | CZ | 02.12.2020 | |
FI | 02.12.2020 | ||
HR | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
Former [2021/33] | FI | 02.12.2020 | |
HR | 02.12.2020 | ||
LT | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
PT | 05.04.2021 | ||
Former [2021/32] | FI | 02.12.2020 | |
HR | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
SM | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
Former [2021/30] | FI | 02.12.2020 | |
HR | 02.12.2020 | ||
LV | 02.12.2020 | ||
NL | 02.12.2020 | ||
PL | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
Former [2021/28] | FI | 02.12.2020 | |
HR | 02.12.2020 | ||
LV | 02.12.2020 | ||
PL | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
Former [2021/25] | FI | 02.12.2020 | |
LV | 02.12.2020 | ||
PL | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
Former [2021/23] | FI | 02.12.2020 | |
LV | 02.12.2020 | ||
RS | 02.12.2020 | ||
SE | 02.12.2020 | ||
BG | 02.03.2021 | ||
NO | 02.03.2021 | ||
GR | 03.03.2021 | ||
Former [2021/22] | FI | 02.12.2020 | |
RS | 02.12.2020 | ||
NO | 02.03.2021 | ||
Former [2021/20] | FI | 02.12.2020 | Documents cited: | Search | [YD]US2007297732 (MASON THOMAS B [US], et al) [YD] 1-3,11,13-15 * paragraph [0096] - paragraph [0098]; figure 8A *; | [Y]US2012050842 (KONDO JUNGO [JP], et al) [Y] 1-3,11,13-15 * paragraph [0070] - paragraph [0073] *; | [A]JP2006078970 (SHIMADZU CORP) [A] 1-3,11 * abstract * | International search | [A]US6631231 (MIZUUCHI KIMINORI [JP], et al) [A] 1-5, 11-14, 19, and 21-24 * ; figure 7; column 5, lines 9-20; column 9, lines 5-10; column 11, lines 37-65 *; | [A]US7515801 (MCCAUGHAN LEON [US], et al) [A] 1-5, 19, and 22-24 * ; figure 1-3; column 5, lines 15-35 *; | [A]US5291567 (REVELLI JR JOSEPH F [US], et al) [A] 1-5, 19, and 22-24 * ; figure 1, 2; column 4, lines 35-45; claim 8 *; | [A]US8270788 (HERMAN PETER R [CA], et al) [A] 6-14, 20, 21 * ; column 9, lines 50-60; column 16, lines 5-15 *; | [A]EP1462831 (CA MINISTER INDUSTRY [CA]) [A] 6-10, 20 * ; see machine translation; paragraph [0050, 0069] *; | [A]WO9419713 (UNIV SOUTHAMPTON [GB], et al) [A] 6-14, 20, 21 * ; abstract, figure 6, paragraph [0061-0062] * | Examination | - DEGL'INNOCENTI R ET AL, "Micromachining of ridge optical waveguides on top of He+-implanted[beta]-BaB2O4 crystals by femtosecond laser ablation", JOURNAL OF APPLIED PHYSICS, AMERICAN INSTITUTE OF PHYSICS, US, (20061213), vol. 100, no. 11, doi:10.1063/1.2396716, ISSN 0021-8979, pages 113121 - 113121, XP012089074 DOI: http://dx.doi.org/10.1063/1.2396716 | - Miaomiao Xu ET AL, "Femtosecond laser micromachined optical waveguides in LiTaO 3 crystal", Physica Status Solidi. Rapid Research Letters, DE, (20130828), vol. 7, no. 11, doi:10.1002/pssr.201308102, ISSN 1862-6254, pages 1014 - 1017, XP055441533 DOI: http://dx.doi.org/10.1002/pssr.201308102 | - BURGHOFF J ET AL, "Origins of waveguiding in femtosecond laser-structured LiNbO3", APPLIED PHYSICS A; MATERIALS SCIENCE & PROCESSING, SPRINGER, BERLIN, DE, (20070628), vol. 89, no. 1, doi:10.1007/S00339-007-4152-0, ISSN 1432-0630, pages 127 - 132, XP019540459 DOI: http://dx.doi.org/10.1007/s00339-007-4152-0 | by applicant | US2012050842 |