blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3362250

EP3362250 - PREFORM AND METHOD OF FABRICATION OF A CARAFE BY INJECTION STRETCH BLOW-MOLDING [Right-click to bookmark this link]
Former [2018/34]INJECTION STRETCH BLOW-MOLDING MADE CARAFE, PREFORM FOR ITS MANUFACTURE AND CORRESPONDING METHOD OF FABRICATION OF THE CARAFE
[2020/40]
StatusNo opposition filed within time limit
Status updated on  07.01.2022
Database last updated on 24.08.2024
FormerThe patent has been granted
Status updated on  29.01.2021
FormerGrant of patent is intended
Status updated on  14.09.2020
FormerRequest for examination was made
Status updated on  20.07.2018
FormerThe international publication has been made
Status updated on  21.04.2017
Most recent event   Tooltip27.04.2024Lapse of the patent in a contracting state
New state(s): MK
published on 29.05.2024  [2024/22]
Applicant(s)For all designated states
Société Anonyme des Eaux Minérales d'Evian et en Abrégé "S.A.E.M.E"
11 avenue du Général Dupas
74500 Evian-les-Bains / FR
[2018/34]
Inventor(s)01 / DUARTE DA CAL, Germano
Le Président
1bis Avenue des Tilleuls
F-74200 Thonon-les-bains / FR
02 / COLLOUD, Alain
Le Bulle
F-74200 Reyvroz / FR
 [2018/34]
Representative(s)Plasseraud IP
104 Rue de Richelieu
CS 92104
75080 Paris Cedex 02 / FR
[N/P]
Former [2021/09]Plasseraud IP
235 Cours Lafayette
69006 Lyon / FR
Former [2018/34]Cabinet Plasseraud
235 Cours Lafayette
69006 Lyon / FR
Application number, filing date15816510.016.10.2015
[2018/34]
WO2015IB02241
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017064532
Date:20.04.2017
Language:EN
[2017/16]
Type: A1 Application with search report 
No.:EP3362250
Date:22.08.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 20.04.2017 takes the place of the publication of the European patent application.
[2018/34]
Type: B1 Patent specification 
No.:EP3362250
Date:03.03.2021
Language:EN
[2021/09]
Search report(s)International search report - published on:EP20.04.2017
ClassificationIPC:B29C49/06, B29C49/64, B29C49/76, B29C49/42, B65D1/02, B29K67/00, B29L31/00, A47G19/12
[2020/40]
CPC:
B29C49/06 (EP); B29C49/42101 (US); A47G19/12 (EP);
B29C49/76 (EP,US); B29C2049/023 (EP); B29C2949/0731 (EP);
B29C2949/0744 (EP); B29C2949/0769 (EP); B29C2949/0772 (EP);
B29C49/4205 (EP); B29C49/6418 (EP); B29C49/6427 (EP);
B29K2067/003 (EP); B29L2031/7158 (EP) (-)
Former IPC [2018/34]B29C49/06, B29C49/64, B29C49/76, B29C49/42, B65D1/02, B29K67/00, B29L31/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/34]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VORFORM UND VERFAHREN ZUR HERSTELLUNG EINER KARAFFE DURCH SPRITZSTRECKBLASFORMEN[2020/40]
English:PREFORM AND METHOD OF FABRICATION OF A CARAFE BY INJECTION STRETCH BLOW-MOLDING[2020/40]
French:PRÉFORME ET PROCÉDÉ DE FABRICATION D'UNE CARAFE PAR MOULAGE PAR INJECTION-ÉTIRAGE-SOUFFLAGE[2020/40]
Former [2018/34]DURCH SPRITZSTRECKBLASFORMEN HERGESTELLTE KARAFFE, VORFORM ZU DEREN HERSTELLUNG UND ZUGEHÖRIGES VERFAHREN ZUR HERSTELLUNG DER KARAFFE
Former [2018/34]INJECTION STRETCH BLOW-MOLDING MADE CARAFE, PREFORM FOR ITS MANUFACTURE AND CORRESPONDING METHOD OF FABRICATION OF THE CARAFE
Former [2018/34]CARAFE FABRIQUÉE PAR MOULAGE PAR INJECTION-ÉTIRAGE-SOUFFLAGE, PRÉFORME POUR SA FABRICATION ET PROCÉDÉ DE FABRICATION DE LA CARAFE CORRESPONDANT
Entry into regional phase07.05.2018National basic fee paid 
07.05.2018Designation fee(s) paid 
07.05.2018Examination fee paid 
Examination procedure07.05.2018Examination requested  [2018/34]
07.05.2018Date on which the examining division has become responsible
05.12.2018Amendment by applicant (claims and/or description)
15.09.2020Communication of intention to grant the patent
22.01.2021Fee for grant paid
22.01.2021Fee for publishing/printing paid
22.01.2021Receipt of the translation of the claim(s)
Opposition(s)06.12.2021No opposition filed within time limit [2022/06]
Fees paidRenewal fee
07.05.2018Renewal fee patent year 03
19.09.2018Renewal fee patent year 04
28.10.2019Renewal fee patent year 05
09.10.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU16.10.2015
AL03.03.2021
AT03.03.2021
CY03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
IT03.03.2021
LT03.03.2021
LV03.03.2021
MC03.03.2021
MK03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
IE16.10.2021
LU16.10.2021
[2024/22]
Former [2023/30]HU16.10.2015
AL03.03.2021
AT03.03.2021
CY03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
IT03.03.2021
LT03.03.2021
LV03.03.2021
MC03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
IE16.10.2021
LU16.10.2021
Former [2023/27]HU16.10.2015
AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
IT03.03.2021
LT03.03.2021
LV03.03.2021
MC03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
IE16.10.2021
LU16.10.2021
Former [2022/48]AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
IT03.03.2021
LT03.03.2021
LV03.03.2021
MC03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
IE16.10.2021
LU16.10.2021
Former [2022/35]AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
IT03.03.2021
LT03.03.2021
LV03.03.2021
MC03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
LU16.10.2021
Former [2022/33]AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
IT03.03.2021
LT03.03.2021
LV03.03.2021
MC03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
Former [2022/23]AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
IT03.03.2021
LT03.03.2021
LV03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
Former [2022/13]AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SI03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
PT05.07.2021
Former [2022/10]AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
PT05.07.2021
Former [2022/08]AL03.03.2021
AT03.03.2021
CZ03.03.2021
DK03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
Former [2022/07]AL03.03.2021
AT03.03.2021
CZ03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
Former [2021/51]AT03.03.2021
CZ03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
IS03.07.2021
PT05.07.2021
Former [2021/50]AT03.03.2021
CZ03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RO03.03.2021
RS03.03.2021
SE03.03.2021
SK03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
PT05.07.2021
Former [2021/48]AT03.03.2021
CZ03.03.2021
EE03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RS03.03.2021
SE03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
Former [2021/46]AT03.03.2021
FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RS03.03.2021
SE03.03.2021
SM03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
Former [2021/38]FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RS03.03.2021
SE03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
Former [2021/37]FI03.03.2021
HR03.03.2021
LT03.03.2021
LV03.03.2021
RS03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
Former [2021/36]FI03.03.2021
HR03.03.2021
LT03.03.2021
BG03.06.2021
NO03.06.2021
GR04.06.2021
Former [2021/35]FI03.03.2021
HR03.03.2021
LT03.03.2021
NO03.06.2021
Former [2021/33]FI03.03.2021
LT03.03.2021
NO03.06.2021
Cited inInternational search[XAI]FR2444555  (MONSANTO CO [US]) [X] 1 * page 7, line 4 - page 11, line 26; figures 4-6; claim 1 * [A] 9-13 [I] 2-8;
 [A]WO9529806  (GRANT CHRIS J [GB], et al) [A] 1-13 * page 17, paragraph 3; figures 11,34,96; claims 1,2,15 * * page 24, paragraph 2 * * page 23, paragraph 3 ** page 20, paragraph 5 - page 21, paragraph 1 *;
 [XAI]EP2253452  (KRONES AG [DE]) [X] 1 * paragraphs [0002] , [0077]; figures 8a,11a,11b,11c,12a,12b,12c * [A] 9-13 [I] 2-7
by applicantWO2012168471
 WO2013092529
 WO2014170215
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.