EP3281294 - ADJUSTABLE BUFFER CIRCUIT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 10.12.2021 Database last updated on 18.10.2024 | |
Former | The patent has been granted Status updated on 01.01.2021 | ||
Former | Grant of patent is intended Status updated on 10.09.2020 | ||
Former | Examination is in progress Status updated on 31.01.2019 | ||
Former | Request for examination was made Status updated on 12.01.2018 | ||
Former | The international publication has been made Status updated on 07.11.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Xilinx, Inc. 2100 Logic Drive San Jose, California 95124 / US | [2018/07] | Inventor(s) | 01 /
ZHANG, Wenfeng 2100 Logic Drive San Jose, CA 95124 / US | 02 /
UPADHYAYA, Parag 2100 Logic Drive San Jose, CA 95124 / US | [2018/07] | Representative(s) | Zimmermann & Partner Patentanwälte mbB Josephspitalstr. 15 80331 München / DE | [2018/07] | Application number, filing date | 15816596.9 | 01.12.2015 | [2018/07] | WO2015US63211 | Priority number, date | US201514681898 | 08.04.2015 Original published format: US201514681898 | [2018/07] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016164075 | Date: | 13.10.2016 | Language: | EN | [2016/41] | Type: | A1 Application with search report | No.: | EP3281294 | Date: | 14.02.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 13.10.2016 takes the place of the publication of the European patent application. | [2018/07] | Type: | B1 Patent specification | No.: | EP3281294 | Date: | 03.02.2021 | Language: | EN | [2021/05] | Search report(s) | International search report - published on: | EP | 13.10.2016 | Classification | IPC: | H03K19/0185, H03K19/094 | [2018/07] | CPC: |
H03K19/018514 (EP,CN,KR,US);
H03K19/09432 (EP,CN,KR,US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/07] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | ANPASSBARER PUFFERSCHALTKREIS | [2018/07] | English: | ADJUSTABLE BUFFER CIRCUIT | [2018/07] | French: | CIRCUIT TAMPON RÉGLABLE | [2018/07] | Entry into regional phase | 07.11.2017 | National basic fee paid | 07.11.2017 | Designation fee(s) paid | 07.11.2017 | Examination fee paid | Examination procedure | 20.06.2016 | Request for preliminary examination filed International Preliminary Examining Authority: EP | 07.11.2017 | Examination requested [2018/07] | 07.11.2017 | Date on which the examining division has become responsible | 04.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 02.05.2019 | Reply to a communication from the examining division | 11.09.2020 | Communication of intention to grant the patent | 07.12.2020 | Fee for grant paid | 07.12.2020 | Fee for publishing/printing paid | 07.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 04.11.2021 | No opposition filed within time limit [2022/02] | Fees paid | Renewal fee | 27.12.2017 | Renewal fee patent year 03 | 31.12.2018 | Renewal fee patent year 04 | 27.12.2019 | Renewal fee patent year 05 | 28.12.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 01.12.2015 | AL | 03.02.2021 | AT | 03.02.2021 | CY | 03.02.2021 | CZ | 03.02.2021 | DK | 03.02.2021 | EE | 03.02.2021 | ES | 03.02.2021 | FI | 03.02.2021 | HR | 03.02.2021 | IT | 03.02.2021 | LT | 03.02.2021 | LV | 03.02.2021 | MC | 03.02.2021 | MK | 03.02.2021 | MT | 03.02.2021 | NL | 03.02.2021 | PL | 03.02.2021 | RO | 03.02.2021 | RS | 03.02.2021 | SE | 03.02.2021 | SI | 03.02.2021 | SK | 03.02.2021 | SM | 03.02.2021 | BG | 03.05.2021 | NO | 03.05.2021 | GR | 04.05.2021 | IS | 03.06.2021 | PT | 04.06.2021 | [2024/41] |
Former [2024/22] | HU | 01.12.2015 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
MK | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2023/30] | HU | 01.12.2015 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CY | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2023/29] | HU | 01.12.2015 | |
AL | 03.02.2021 | ||
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/33] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
MC | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/23] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
IT | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/13] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SI | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/10] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2022/08] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
ES | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2022/07] | AL | 03.02.2021 | |
AT | 03.02.2021 | ||
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/50] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RO | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SK | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/49] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
DK | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/48] | AT | 03.02.2021 | |
CZ | 03.02.2021 | ||
EE | 03.02.2021 | ||
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/46] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
SM | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/42] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
IS | 03.06.2021 | ||
PT | 04.06.2021 | ||
Former [2021/39] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
PL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/38] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
NL | 03.02.2021 | ||
RS | 03.02.2021 | ||
SE | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/37] | AT | 03.02.2021 | |
FI | 03.02.2021 | ||
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
LV | 03.02.2021 | ||
RS | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/36] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
BG | 03.05.2021 | ||
NO | 03.05.2021 | ||
GR | 04.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/35] | FI | 03.02.2021 | |
HR | 03.02.2021 | ||
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | ||
Former [2021/33] | FI | 03.02.2021 | |
LT | 03.02.2021 | ||
NO | 03.05.2021 | ||
PT | 04.06.2021 | Cited in | International search | [XAI]US2005248396 (CARESOSA MARIO [US], et al) [X] 1,3,4,6,9,12-14 * figure 12 * [A] 7,8 [I] 2,10,11,15; | [XAI]US2006061391 (TAM KIMO Y F [US]) [X] 1,3-6,9,12,14 * paragraph [0024] - paragraph [0029]; figure 4 * [A] 7,8,13 [I] 2,10,11; | [XAI]US7202706 (PLASTERER JOHN P [CA], et al) [X] 1,3-6,9,12,14 * figures 27,29 * [A] 7,8[I] 2,10,11; | [XAI]US2008204171 (ABEL CHRISTOPHER J [US], et al) [X] 1-6,9,12,14 * paragraph [0035] - paragraph [0051]; figure 3 * [A] 7,8 [I] 10,11 |