EP3233678 - PORTIONING SYSTEM FOR PORTIONING STACKABLE FLAT ELEMENTS IN A STACK FOR A FURTHER PROCESSING [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.09.2019 Database last updated on 02.08.2024 | |
Former | The patent has been granted Status updated on 28.09.2018 | ||
Former | Grant of patent is intended Status updated on 12.07.2018 | ||
Former | Request for examination was made Status updated on 22.09.2017 | ||
Former | The international publication has been made Status updated on 27.06.2017 | Most recent event Tooltip | 03.07.2020 | Lapse of the patent in a contracting state New state(s): CY, HU, MK | published on 05.08.2020 [2020/32] | Applicant(s) | For all designated states BOBST GRENCHEN AG Niklaus-Wengi-Strasse 109 2540 Grenchen / CH | [2017/43] | Inventor(s) | 01 /
WICK, Stefan Zünackerstrasse 717 4625 Oberbuchsiten / CH | [2017/43] | Representative(s) | Wagner, Sigrid Bobst Mex SA En Faraz 1031 Mex / CH | [N/P] |
Former [2017/43] | Leadbetter, Benedict Bobst Mex SA Case Postale 1001 Lausanne / CH | Application number, filing date | 15817082.9 | 17.12.2015 | [2017/43] | WO2015EP25108 | Priority number, date | EP20140020114 | 18.12.2014 Original published format: EP 14020114 | [2017/43] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016096158 | Date: | 23.06.2016 | Language: | EN | [2016/25] | Type: | A1 Application with search report | No.: | EP3233678 | Date: | 25.10.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 23.06.2016 takes the place of the publication of the European patent application. | [2017/43] | Type: | B1 Patent specification | No.: | EP3233678 | Date: | 31.10.2018 | Language: | EN | [2018/44] | Search report(s) | International search report - published on: | EP | 23.06.2016 | Classification | IPC: | B65H3/24, B65H5/00, B65H5/08, B65H3/32 | [2017/43] | CPC: |
B65H3/242 (EP,CN,US);
B65H3/322 (EP,CN,US);
B65H5/006 (EP,CN,US);
B65H5/08 (EP,CN,US);
B65H2301/42242 (EP,CN,US);
B65H2301/42266 (EP,CN,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/43] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | SYSTEM ZUM PORTIONIEREN FLACHER STAPELBARER ELEMENTE IN EINEM STAPEL ZUR WEITERVERARBEITUNG | [2017/43] | English: | PORTIONING SYSTEM FOR PORTIONING STACKABLE FLAT ELEMENTS IN A STACK FOR A FURTHER PROCESSING | [2017/43] | French: | SYSTÈME DE DOSAGE SERVANT À FRACTIONNER DES ÉLÉMENTS PLAT EMPILABLES POUR UN TRAITEMENT ULTÉRIEUR | [2018/27] |
Former [2017/43] | SYSTÈME DE RÉPARTITION SERVANT À RÉPARTIR DES ÉLÉMENTS PLATS EMPILABLES EN UNE PILE À DES FINS DE TRAITEMENT SUPPLÉMENTAIRE | Entry into regional phase | 20.06.2017 | National basic fee paid | 20.06.2017 | Designation fee(s) paid | 20.06.2017 | Examination fee paid | Examination procedure | 20.06.2017 | Examination requested [2017/43] | 20.06.2017 | Date on which the examining division has become responsible | 13.07.2018 | Communication of intention to grant the patent | 19.09.2018 | Fee for grant paid | 19.09.2018 | Fee for publishing/printing paid | 19.09.2018 | Receipt of the translation of the claim(s) | Opposition(s) | 01.08.2019 | No opposition filed within time limit [2019/41] | Fees paid | Renewal fee | 18.12.2017 | Renewal fee patent year 03 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.12.2015 | AL | 31.10.2018 | AT | 31.10.2018 | CY | 31.10.2018 | DK | 31.10.2018 | EE | 31.10.2018 | FI | 31.10.2018 | HR | 31.10.2018 | LT | 31.10.2018 | LV | 31.10.2018 | MC | 31.10.2018 | MK | 31.10.2018 | NL | 31.10.2018 | RO | 31.10.2018 | RS | 31.10.2018 | SI | 31.10.2018 | SK | 31.10.2018 | SM | 31.10.2018 | TR | 31.10.2018 | IE | 17.12.2018 | LU | 17.12.2018 | MT | 17.12.2018 | BE | 31.12.2018 | CH | 31.12.2018 | LI | 31.12.2018 | BG | 31.01.2019 | NO | 31.01.2019 | GR | 01.02.2019 | IS | 28.02.2019 | PT | 01.03.2019 | [2020/31] |
Former [2020/17] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
TR | 31.10.2018 | ||
IE | 17.12.2018 | ||
LU | 17.12.2018 | ||
MT | 17.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2020/08] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
IE | 17.12.2018 | ||
LU | 17.12.2018 | ||
MT | 17.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2020/04] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
IE | 17.12.2018 | ||
LU | 17.12.2018 | ||
BE | 31.12.2018 | ||
CH | 31.12.2018 | ||
LI | 31.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/50] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SI | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
IE | 17.12.2018 | ||
LU | 17.12.2018 | ||
BE | 31.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/48] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
IE | 17.12.2018 | ||
LU | 17.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/40] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
MC | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
LU | 17.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/39] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SK | 31.10.2018 | ||
SM | 31.10.2018 | ||
LU | 17.12.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/37] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
EE | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
RO | 31.10.2018 | ||
RS | 31.10.2018 | ||
SM | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/34] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
DK | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
RS | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/26] | AL | 31.10.2018 | |
AT | 31.10.2018 | ||
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
RS | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
PT | 01.03.2019 | ||
Former [2019/25] | AT | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
RS | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/24] | AT | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
GR | 01.02.2019 | ||
IS | 28.02.2019 | ||
Former [2019/23] | AT | 31.10.2018 | |
FI | 31.10.2018 | ||
HR | 31.10.2018 | ||
LT | 31.10.2018 | ||
LV | 31.10.2018 | ||
NL | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/22] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
BG | 31.01.2019 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/21] | FI | 31.10.2018 | |
LT | 31.10.2018 | ||
NO | 31.01.2019 | ||
IS | 28.02.2019 | ||
Former [2019/20] | LT | 31.10.2018 | |
NO | 31.01.2019 | Cited in | International search | [A]DE4124077 (FRAUNHOFER GES FORSCHUNG [DE]) [A] 1,14* the whole document *; | [A]JPH05254678 (UNKNOWN) [A] 1,14 * abstract *; | [A]DE29502308U (SPITZER LOTHAR [DE]) [A] 1,14 * the whole document *; | [A]EP1505018 (KPL PACKAGING SPA [IT]) [A] 1-14 * the whole document * |