Extract from the Register of European Patents

EP About this file: EP3197233

EP3197233 - WIRELESS NETWORK ACCESS CONTROL METHOD, FIRST BASE STATION AND SYSTEM [Right-click to bookmark this link]
Former [2017/30]WIRELESS NETWORK ACCESS CONTROL METHOD, DEVICE AND SYSTEM
[2020/45]
StatusNo opposition filed within time limit
Status updated on  04.03.2022
Database last updated on 19.03.2026
FormerThe patent has been granted
Status updated on  26.03.2021
FormerGrant of patent is intended
Status updated on  16.11.2020
FormerExamination is in progress
Status updated on  01.06.2018
FormerRequest for examination was made
Status updated on  23.06.2017
FormerThe international publication has been made
Status updated on  31.01.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
China Academy of Telecommunications Technology
No. 40 Xueyuan Road
Haidian District
Beijing 100191 / CN
[2021/17]
Former [2017/30]For all designated states
China Academy of Telecommunications Technology
No. 40 Xue Yuan Road Hai Dian District
Beijing 100191 / CN
Inventor(s)01 / LIU, Jiamin
No. 40 Xueyuan Rd.
Haidian District
Beijing 100191 / CN
02 / QIN, Fei
No. 40 Xueyuan Rd.
Haidian District
Beijing 100191 / CN
03 / HE, Yuan
No. 40 Xueyuan Rd.
Haidian District
Beijing 100191 / CN
 [2017/30]
Representative(s)Studio Torta S.p.A.
Via Viotti, 9
10121 Torino / IT
[2017/30]
Application number, filing date15827644.417.06.2015
[2017/30]
WO2015CN81659
Priority number, dateCN20141037790901.08.2014         Original published format: CN201410377909
[2017/30]
Filing languageZH
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016015525
Date:04.02.2016
Language:ZH
[2016/05]
Type: A1 Application with search report 
No.:EP3197233
Date:26.07.2017
Language:EN
[2017/30]
Type: B1 Patent specification 
No.:EP3197233
Date:28.04.2021
Language:EN
[2021/17]
Search report(s)International search report - published on:CN04.02.2016
(Supplementary) European search report - dispatched on:EP04.07.2017
ClassificationIPC:H04W28/16, H04W48/08, H04W76/16
[2020/45]
CPC:
H04W76/10 (EP,US); H04W48/20 (US); H04W28/16 (EP,US);
H04W64/003 (US); H04W48/08 (EP,US)
Former IPC [2017/31]H04W76/02, H04W28/16, H04W48/08, H04W28/08
Former IPC [2017/30]H04W76/02, H04W28/16, H04W48/08
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/30]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN ZUR STEUERUNG DES ZUGANGS ZU EINEM DRAHTLOSNETZWERK, ERSTES BASISSTATION UND SYSTEM[2020/45]
English:WIRELESS NETWORK ACCESS CONTROL METHOD, FIRST BASE STATION AND SYSTEM[2020/45]
French:PROCÉDÉ, PREMIERE STATION DE BASE ET SYSTÈME DE CONTRÔLE D'ACCÈS À UN RÉSEAU SANS FIL[2020/45]
Former [2017/30]VERFAHREN ZUR STEUERUNG DES ZUGANGS ZU EINEM DRAHTLOSNETZWERK, VORRICHTUNG UND SYSTEM
Former [2017/30]WIRELESS NETWORK ACCESS CONTROL METHOD, DEVICE AND SYSTEM
Former [2017/30]PROCÉDÉ, DISPOSITIF ET SYSTÈME DE CONTRÔLE D'ACCÈS À UN RÉSEAU SANS FIL
Entry into regional phase30.01.2017Translation filed 
30.01.2017National basic fee paid 
30.01.2017Search fee paid 
30.01.2017Designation fee(s) paid 
30.01.2017Examination fee paid 
Examination procedure30.01.2017Examination requested  [2017/30]
30.01.2017Date on which the examining division has become responsible
20.12.2017Amendment by applicant (claims and/or description)
05.06.2018Despatch of a communication from the examining division (Time limit: M04)
27.09.2018Reply to a communication from the examining division
20.02.2019Despatch of a communication from the examining division (Time limit: M04)
20.06.2019Reply to a communication from the examining division
13.01.2020Despatch of a communication from the examining division (Time limit: M04)
12.05.2020Reply to a communication from the examining division
17.11.2020Communication of intention to grant the patent
16.03.2021Fee for grant paid
16.03.2021Fee for publishing/printing paid
16.03.2021Receipt of the translation of the claim(s)
Opposition(s)31.01.2022No opposition filed within time limit [2022/14]
Fees paidRenewal fee
30.05.2017Renewal fee patent year 03
28.05.2018Renewal fee patent year 04
27.05.2019Renewal fee patent year 05
22.05.2020Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU17.06.2015
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
MT28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
TR28.04.2021
IE17.06.2021
LU17.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
[2024/41]
Former [2024/29]HU17.06.2015
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
TR28.04.2021
IE17.06.2021
LU17.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2024/22]HU17.06.2015
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
MK28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2023/30]HU17.06.2015
AL28.04.2021
AT28.04.2021
CY28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2023/27]HU17.06.2015
AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/36]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
IT28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/34]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
BE30.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/29]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SI28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/26]AL28.04.2021
AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/23]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/21]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
IE17.06.2021
LU17.06.2021
CH30.06.2021
LI30.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
IS22.12.2021
Former [2022/18]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
LU17.06.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
IS22.12.2021
Former [2022/10]AT28.04.2021
CZ28.04.2021
DK28.04.2021
EE28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
IS22.12.2021
Former [2022/09]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RO28.04.2021
RS28.04.2021
SE28.04.2021
SK28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/08]AT28.04.2021
CZ28.04.2021
DK28.04.2021
ES28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2022/07]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
MC28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
SM28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/52]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
PL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/51]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
RS28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
IS28.08.2021
PT30.08.2021
Former [2021/50]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
PT30.08.2021
Former [2021/49]AT28.04.2021
FI28.04.2021
HR28.04.2021
LT28.04.2021
LV28.04.2021
NL28.04.2021
SE28.04.2021
BG28.07.2021
NO28.07.2021
GR29.07.2021
Former [2021/47]AT28.04.2021
FI28.04.2021
LT28.04.2021
NL28.04.2021
BG28.07.2021
Former [2021/46]AT28.04.2021
FI28.04.2021
LT28.04.2021
Documents cited:Search[X] WO2014059663  (HUAWEI TECH CO LTD et al.) [X] 1,11,15 * abstract * * paragraph [0019] - paragraph [0023] * * paragraph [0028] * * paragraph [0116] - paragraph [0122] *
 [X] WO2014015472  (HUAWEI TECH CO LTD et al.) [X] 1,2,11,12,15 * abstract * * paragraph [0016] - paragraph [0023] *
 [X] EP2869656  (HUAWEI TECH CO LTD et al.)
 [XA]   NOKIA CORPORATION ET AL: "Discussion on SeNB related RRC procedures", vol. RAN WG2, no. Barcelona; 20130819 - 20130823, 9 August 2013 (2013-08-09), XP050718165, Retrieved from the Internet [retrieved on 20130809] [X] 1,2,11,12,15 * paragraph [2(1)] - paragraph [2(5)] *[A] 3-10,13,14
International search[Y] CN103945461  (ZTE CORP et al.) [Y] 1-30 * description, paragraph [0054], paragraphs [0099] to [0110] and figures 4 and 11 *
 [Y] EP1740007  (SAMSUNG ELECTRONICS CO LTD et al.) [Y] 1-30 * description, paragraph [0042] and figure 3 *
 [PX] CN104185222  (FUJITSU LTD et al.) [PX] 1-30 * description, paragraphs [0068] to [0136] and figures 1 to 7 *
 [PX] CN104168624  (CHINA ACADEMY OF TELECOMM TECH et al.) [PX] 1-30 * description, paragraphs [0105] to [0295], figures 1 to 13 and claims 1 to 29 *
 [A]   ERICSSON ET AL.: "SMALL CELL CHALLENGES AND BENEFITS OF DUAL CONNECTIVITY", 3GPP TSG-RAN WG 2 #81 R2-130416, 1 February 2013 (2013-02-01), XP050668082 [A] 1-30 * section 3 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.