| EP3197233 - WIRELESS NETWORK ACCESS CONTROL METHOD, FIRST BASE STATION AND SYSTEM [Right-click to bookmark this link] | |||
| Former [2017/30] | WIRELESS NETWORK ACCESS CONTROL METHOD, DEVICE AND SYSTEM | ||
| [2020/45] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 19.03.2026 | |
| Former | The patent has been granted Status updated on 26.03.2021 | ||
| Former | Grant of patent is intended Status updated on 16.11.2020 | ||
| Former | Examination is in progress Status updated on 01.06.2018 | ||
| Former | Request for examination was made Status updated on 23.06.2017 | ||
| Former | The international publication has been made Status updated on 31.01.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states China Academy of Telecommunications Technology No. 40 Xueyuan Road Haidian District Beijing 100191 / CN | [2021/17] |
| Former [2017/30] | For all designated states China Academy of Telecommunications Technology No. 40 Xue Yuan Road Hai Dian District Beijing 100191 / CN | Inventor(s) | 01 /
LIU, Jiamin No. 40 Xueyuan Rd. Haidian District Beijing 100191 / CN | 02 /
QIN, Fei No. 40 Xueyuan Rd. Haidian District Beijing 100191 / CN | 03 /
HE, Yuan No. 40 Xueyuan Rd. Haidian District Beijing 100191 / CN | [2017/30] | Representative(s) | Studio Torta S.p.A. Via Viotti, 9 10121 Torino / IT | [2017/30] | Application number, filing date | 15827644.4 | 17.06.2015 | [2017/30] | WO2015CN81659 | Priority number, date | CN201410377909 | 01.08.2014 Original published format: CN201410377909 | [2017/30] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016015525 | Date: | 04.02.2016 | Language: | ZH | [2016/05] | Type: | A1 Application with search report | No.: | EP3197233 | Date: | 26.07.2017 | Language: | EN | [2017/30] | Type: | B1 Patent specification | No.: | EP3197233 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | International search report - published on: | CN | 04.02.2016 | (Supplementary) European search report - dispatched on: | EP | 04.07.2017 | Classification | IPC: | H04W28/16, H04W48/08, H04W76/16 | [2020/45] | CPC: |
H04W76/10 (EP,US);
H04W48/20 (US);
H04W28/16 (EP,US);
H04W64/003 (US);
H04W48/08 (EP,US)
|
| Former IPC [2017/31] | H04W76/02, H04W28/16, H04W48/08, H04W28/08 | ||
| Former IPC [2017/30] | H04W76/02, H04W28/16, H04W48/08 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/30] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | VERFAHREN ZUR STEUERUNG DES ZUGANGS ZU EINEM DRAHTLOSNETZWERK, ERSTES BASISSTATION UND SYSTEM | [2020/45] | English: | WIRELESS NETWORK ACCESS CONTROL METHOD, FIRST BASE STATION AND SYSTEM | [2020/45] | French: | PROCÉDÉ, PREMIERE STATION DE BASE ET SYSTÈME DE CONTRÔLE D'ACCÈS À UN RÉSEAU SANS FIL | [2020/45] |
| Former [2017/30] | VERFAHREN ZUR STEUERUNG DES ZUGANGS ZU EINEM DRAHTLOSNETZWERK, VORRICHTUNG UND SYSTEM | ||
| Former [2017/30] | WIRELESS NETWORK ACCESS CONTROL METHOD, DEVICE AND SYSTEM | ||
| Former [2017/30] | PROCÉDÉ, DISPOSITIF ET SYSTÈME DE CONTRÔLE D'ACCÈS À UN RÉSEAU SANS FIL | Entry into regional phase | 30.01.2017 | Translation filed | 30.01.2017 | National basic fee paid | 30.01.2017 | Search fee paid | 30.01.2017 | Designation fee(s) paid | 30.01.2017 | Examination fee paid | Examination procedure | 30.01.2017 | Examination requested [2017/30] | 30.01.2017 | Date on which the examining division has become responsible | 20.12.2017 | Amendment by applicant (claims and/or description) | 05.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 27.09.2018 | Reply to a communication from the examining division | 20.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 20.06.2019 | Reply to a communication from the examining division | 13.01.2020 | Despatch of a communication from the examining division (Time limit: M04) | 12.05.2020 | Reply to a communication from the examining division | 17.11.2020 | Communication of intention to grant the patent | 16.03.2021 | Fee for grant paid | 16.03.2021 | Fee for publishing/printing paid | 16.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 30.05.2017 | Renewal fee patent year 03 | 28.05.2018 | Renewal fee patent year 04 | 27.05.2019 | Renewal fee patent year 05 | 22.05.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 17.06.2015 | AL | 28.04.2021 | AT | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | DK | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | FI | 28.04.2021 | HR | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | MT | 28.04.2021 | NL | 28.04.2021 | PL | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SE | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | TR | 28.04.2021 | IE | 17.06.2021 | LU | 17.06.2021 | BE | 30.06.2021 | CH | 30.06.2021 | LI | 30.06.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | IS | 28.08.2021 | PT | 30.08.2021 | [2024/41] |
| Former [2024/29] | HU | 17.06.2015 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CY | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| MK | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| TR | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| BE | 30.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2024/22] | HU | 17.06.2015 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CY | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| MK | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| BE | 30.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2023/30] | HU | 17.06.2015 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CY | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| BE | 30.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2023/27] | HU | 17.06.2015 | |
| AL | 28.04.2021 | ||
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| BE | 30.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/36] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| IT | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| BE | 30.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/34] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| BE | 30.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/29] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SI | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/26] | AL | 28.04.2021 | |
| AT | 28.04.2021 | ||
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/23] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/21] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| IE | 17.06.2021 | ||
| LU | 17.06.2021 | ||
| CH | 30.06.2021 | ||
| LI | 30.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| PT | 30.08.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/18] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| LU | 17.06.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| PT | 30.08.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/10] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| EE | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| PT | 30.08.2021 | ||
| IS | 22.12.2021 | ||
| Former [2022/09] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RO | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SK | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/08] | AT | 28.04.2021 | |
| CZ | 28.04.2021 | ||
| DK | 28.04.2021 | ||
| ES | 28.04.2021 | ||
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2022/07] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| MC | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| SM | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/52] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| PL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/51] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| RS | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| IS | 28.08.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/50] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| PT | 30.08.2021 | ||
| Former [2021/49] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| HR | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| LV | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| SE | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| NO | 28.07.2021 | ||
| GR | 29.07.2021 | ||
| Former [2021/47] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| LT | 28.04.2021 | ||
| NL | 28.04.2021 | ||
| BG | 28.07.2021 | ||
| Former [2021/46] | AT | 28.04.2021 | |
| FI | 28.04.2021 | ||
| LT | 28.04.2021 | Documents cited: | Search | [X] WO2014059663 (HUAWEI TECH CO LTD et al.) [X] 1,11,15 * abstract * * paragraph [0019] - paragraph [0023] * * paragraph [0028] * * paragraph [0116] - paragraph [0122] * | [X] WO2014015472 (HUAWEI TECH CO LTD et al.) [X] 1,2,11,12,15 * abstract * * paragraph [0016] - paragraph [0023] * | [X] EP2869656 (HUAWEI TECH CO LTD et al.) | [XA] NOKIA CORPORATION ET AL: "Discussion on SeNB related RRC procedures", vol. RAN WG2, no. Barcelona; 20130819 - 20130823, 9 August 2013 (2013-08-09), XP050718165, Retrieved from the Internet | International search | [Y] CN103945461 (ZTE CORP et al.) [Y] 1-30 * description, paragraph [0054], paragraphs [0099] to [0110] and figures 4 and 11 * | [Y] EP1740007 (SAMSUNG ELECTRONICS CO LTD et al.) [Y] 1-30 * description, paragraph [0042] and figure 3 * | [PX] CN104185222 (FUJITSU LTD et al.) [PX] 1-30 * description, paragraphs [0068] to [0136] and figures 1 to 7 * | [PX] CN104168624 (CHINA ACADEMY OF TELECOMM TECH et al.) [PX] 1-30 * description, paragraphs [0105] to [0295], figures 1 to 13 and claims 1 to 29 * | [A] ERICSSON ET AL.: "SMALL CELL CHALLENGES AND BENEFITS OF DUAL CONNECTIVITY", 3GPP TSG-RAN WG 2 #81 R2-130416, 1 February 2013 (2013-02-01), XP050668082 [A] 1-30 * section 3 * |