blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3326390

EP3326390 - SYNCHRONIZATION SIGNALS AND CHANNEL STRUCTURE FOR NARROWBAND LTE DEPLOYMENTS [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  06.09.2019
Database last updated on 20.09.2024
FormerGrant of patent is intended
Status updated on  02.12.2018
FormerRequest for examination was made
Status updated on  27.04.2018
FormerThe international publication has been made
Status updated on  03.02.2017
Most recent event   Tooltip06.09.2019Application deemed to be withdrawnpublished on 09.10.2019  [2019/41]
Applicant(s)For all designated states
Intel Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
[2018/22]
Inventor(s)01 / WU, Tao
7202 Emami Drive
San Jose, CA 95120 / US
02 / CHATTERJEE, Debdeep
725 Mariposa Avenue
Apt. 301
Mountain View, CA 94041 / US
03 / XIONG, Gang
16682 NW Arizona Drive
Beaverton, OR 97006 / US
04 / RASHID, Mohamad, Mamunur
6058 NE Whitewood Drive
Hillsboro, OR 97124 / US
 [2018/22]
Representative(s)Goddar, Heinz J., et al
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
[2018/22]
Application number, filing date15828785.423.12.2015
[2018/22]
WO2015US00254
Priority number, dateUS201562196530P24.07.2015         Original published format: US 201562196530 P
[2018/22]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017018966
Date:02.02.2017
Language:EN
[2017/05]
Type: A1 Application with search report 
No.:EP3326390
Date:30.05.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 02.02.2017 takes the place of the publication of the European patent application.
[2018/22]
Search report(s)International search report - published on:EP02.02.2017
ClassificationIPC:H04W4/00
[2018/22]
CPC:
H04W56/0005 (EP,US); H04J11/0069 (KR); H04L27/2613 (EP,KR,US);
H04L27/2692 (EP,US); H04W4/70 (EP,US); H04W56/00 (KR);
H04J2211/005 (KR); H04L27/26132 (EP,KR,US); H04L5/0048 (EP,US);
H04L5/0053 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/22]
TitleGerman:SYNCHRONISATIONSSIGNALE UND KANALSTRUKTUR FÜR SCHMALBANDIGE LTE-EINSÄTZE[2018/22]
English:SYNCHRONIZATION SIGNALS AND CHANNEL STRUCTURE FOR NARROWBAND LTE DEPLOYMENTS[2018/22]
French:STRUCTURE DE CANAL ET SIGNAUX DE SYNCHRONISATION POUR DÉPLOIEMENTS DE LTE À BANDE ÉTROITE[2018/22]
Entry into regional phase16.01.2018National basic fee paid 
16.01.2018Designation fee(s) paid 
16.01.2018Examination fee paid 
Examination procedure16.01.2018Examination requested  [2018/22]
16.01.2018Date on which the examining division has become responsible
12.09.2018Amendment by applicant (claims and/or description)
03.12.2018Communication of intention to grant the patent
16.04.2019Application deemed to be withdrawn, date of legal effect  [2019/41]
22.05.2019Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time  [2019/41]
Fees paidRenewal fee
16.01.2018Renewal fee patent year 03
12.12.2018Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Cited inInternational search[YA]US2014029568  (WANG LEI [US], et al) [Y] 1,24,25 * paragraph [0003] - paragraph [0005] * * paragraph [0049] - paragraph [0065] * [A] 21,23;
 [YA]  - "3rd Generation Partnership Project; Technical Specification Group GSM/EDGE Radio Access Network; Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things; (Release 13)", 3GPP STANDARD; 3GPP TR 45.820, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20150714), vol. GERAN WG1, no. V1.4.0, pages 1 - 361, XP050995816 [Y] 1 * page 263, paragraph 7.3.1.1 - page 273, paragraph 7.3.2.3.3.1 * [A] 2-21,23
 [Y]  - APIS TECHNICAL TRAINING AB, "LTE-Advanced: EPO in-house course", APIS TECHNICAL TRAINING AB, Stockholm, (20141231), pages 1 - 16, XP002756029 [Y] 24,25 * page 11, line 1 - line 19 *
 [A]  - Page, "LTE-M - Optimizing LTE for the Internet of Things White Paper Nokia Networks Nokia Networks white paper LTE-M - Optimizing LTE for the Internet of Things FutureWorks Contents", (20150501), URL: http://networks.nokia.com/sites/default/files/document/nokia_lte-m_-_optimizing_lte_for_the_internet_of_things_white_paper.pdf, (20160315), XP055258450 [A] 1-25 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.