blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News flashes

New version of the European Patent Register - SPC information for Unitary Patents.

2024-03-06

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3314918

EP3314918 - ENHANCED SUPPORT VEHICLE-TO-ANYTHING (V2X) COMMUNICATION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.06.2021
Database last updated on 29.06.2024
FormerThe patent has been granted
Status updated on  10.07.2020
FormerGrant of patent is intended
Status updated on  25.02.2020
FormerExamination is in progress
Status updated on  23.11.2018
FormerRequest for examination was made
Status updated on  30.03.2018
FormerThe international publication has been made
Status updated on  30.12.2016
Most recent event   Tooltip22.07.2022Lapse of the patent in a contracting state
New state(s): BE
published on 24.08.2022  [2022/34]
Applicant(s)For all designated states
Apple Inc.
One Apple Park Way
Cupertino, CA 95014 / US
[2020/52]
Former [2020/33]For all designated states
Intel IP Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
Former [2018/18]For all designated states
Intel IP Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
Inventor(s)01 / PINHEIRO, Ana Lucia
c/o Intel IP Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
02 / CAVALCANTI, Dave
c/o Intel IP Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
03 / KEDALAGUDDE, Meghashree Dattatri
c/o Intel IP Corporation
2200 Mission College Boulevard
Santa Clara, CA 95054 / US
 [2018/18]
Representative(s)Rooney, John-Paul
Withers & Rogers LLP
2 London Bridge
London SE1 9RA / GB
[N/P]
Former [2020/33]Rooney, John-Paul
Withers & Rogers LLP
4 More London Riverside
London SE1 2AU / GB
Former [2018/18]Goddar, Heinz J.
Boehmert & Boehmert
Anwaltspartnerschaft mbB
Pettenkoferstrasse 22
80336 München / DE
Application number, filing date15828901.724.12.2015
[2018/18]
WO2015US00358
Priority number, dateUS201562183936P24.06.2015         Original published format: US 201562183936 P
[2018/18]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2016209196
Date:29.12.2016
Language:EN
[2016/52]
Type: A1 Application with search report 
No.:EP3314918
Date:02.05.2018
Language:EN
The application published by WIPO in one of the EPO official languages on 29.12.2016 takes the place of the publication of the European patent application.
[2018/18]
Type: B1 Patent specification 
No.:EP3314918
Date:12.08.2020
Language:EN
[2020/33]
Search report(s)International search report - published on:EP29.12.2016
ClassificationIPC:H04W4/00, H04W4/02, H04L29/06, H04W4/80, H04W4/40
[2020/11]
CPC:
H04L69/22 (EP,CN,US); H04W4/00 (CN); H04W4/40 (US);
H04W4/02 (EP,US); H04W4/80 (US)
Former IPC [2018/18]H04W4/00
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/18]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERBESSERTE UNTERSTÜTZUNG FÜR VEHICLE-TO-ANYTHING (V2X)-KOMMUNIKATION[2018/18]
English:ENHANCED SUPPORT VEHICLE-TO-ANYTHING (V2X) COMMUNICATION[2018/18]
French:COMMUNICATION DE VÉHICULE À INFRASTRUCTURE (V2X) À PRISE EN CHARGE AMÉLIORÉE[2018/18]
Entry into regional phase15.11.2017National basic fee paid 
15.11.2017Designation fee(s) paid 
15.11.2017Examination fee paid 
Examination procedure15.11.2017Examination requested  [2018/18]
15.11.2017Date on which the examining division has become responsible
25.07.2018Amendment by applicant (claims and/or description)
22.11.2018Despatch of a communication from the examining division (Time limit: M04)
25.03.2019Reply to a communication from the examining division
26.02.2020Communication of intention to grant the patent
03.07.2020Fee for grant paid
03.07.2020Fee for publishing/printing paid
03.07.2020Receipt of the translation of the claim(s)
Opposition(s)14.05.2021No opposition filed within time limit [2021/29]
Fees paidRenewal fee
15.11.2017Renewal fee patent year 03
12.12.2018Renewal fee patent year 04
13.12.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU24.12.2015
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MK12.08.2020
MT12.08.2020
NL12.08.2020
PL12.08.2020
PT12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
TR12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE24.12.2020
LU24.12.2020
BE31.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
[2022/33]
Former [2022/32]HU24.12.2015
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MK12.08.2020
MT12.08.2020
NL12.08.2020
PL12.08.2020
PT12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
TR12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE24.12.2020
LU24.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2022/27]HU24.12.2015
AL12.08.2020
AT12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MT12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
TR12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE24.12.2020
LU24.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2021/52]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE24.12.2020
LU24.12.2020
CH31.12.2020
FR31.12.2020
LI31.12.2020
Former [2021/48]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE24.12.2020
LU24.12.2020
FR31.12.2020
Former [2021/46]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
IE24.12.2020
LU24.12.2020
Former [2021/40]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/36]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/34]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/28]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/25]AL12.08.2020
AT12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/23]CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/22]CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/21]DK12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/12]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/10]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/09]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
Former [2021/08]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
Former [2021/07]FI12.08.2020
LT12.08.2020
NO12.11.2020
Cited inInternational search[XYI]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Study on LTE Support for V2X Services (Release 14)", (20150417), 3GPP DRAFT; S1-151331 (092) PROPOSED EDITORIAL CHANGES FOR TR V010 (MAIN BODY) R3 -PS, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-AN, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA1/Docsstatus/docs/, (20150417), XP050941751 [X] 1-3,11,14-16,18-20,30,32,33 * page 6 - page 17 * [Y] 6-10,12,17,23-26,31 [I] 4,5,13,21,22,27-29
 [XAI]  - KATO SEIYA ET AL, "Enabling vehicular safety applications over LTE networks", 2013 INTERNATIONAL CONFERENCE ON CONNECTED VEHICLES AND EXPO (ICCVE), IEEE, (20131202), doi:10.1109/ICCVE.2013.6799889, pages 747 - 752, XP032587651 [X] 1-5,11,14-16,18-22,30,32,33 * page 747 - page 750 * * page 752 - page 752 * [A] 6-10,12,17,23-26,31 [I] 13,27-29

DOI:   http://dx.doi.org/10.1109/ICCVE.2013.6799889
 [Y]  - Graham Finnie, "White Paper The New DPI: Challenges & Opportunities In The LTE Era Prepared by", http://www.qosmos.com/wp-content/uploads/2012/09/Heavy_Reading_White_Paper_LTE_Jan2011.pdf, (20110131), URL: http://www.qosmos.com/wp-content/uploads/2012/09/Heavy_Reading_White_Paper_LTE_Jan2011.pdf, (20160329), XP055261293 [Y] 6-10,12,17,23-26 * page 5 - page 5 *
 [YA]  - Thouraya Toukabri Gunes ET AL, "Hybrid Model for LTE Network-Assisted D2D Communications", LECTURE NOTES IN COMPUTER SCIENCE, Berlin, Heidelberg, Springer Berlin Heidelberg, (20140101), vol. 8487, pages 100 - 113, doi:10.1007/978-3-319-07425-2_8, ISSN 0302-9743, ISBN 978-3-54-045234-8, XP055126515 [Y] 31 * page 101 - page 101 * * page 105 - page 108 * * page 110 - page 111 * [A] 1-30,32,33

DOI:   http://dx.doi.org/10.1007/978-3-319-07425-2_8
 [AD]  - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Proximity-based services (ProSe); Stage 2 (Release 13)", (20150622), 3GPP DRAFT; 23303-D00, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_sa/WG2_Arch/Latest_SA2_Specs/Rel-13/, (20150622), XP050985608 [AD] 1-33 * page 11 - page 34 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.