EP3285113 - ARRAY SUBSTRATE AND MANUFACTURING METHOD AND TESTING METHOD THEREOF, AND DISPLAY DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.03.2021 Database last updated on 16.11.2024 | |
Former | The patent has been granted Status updated on 03.04.2020 | ||
Former | Grant of patent is intended Status updated on 08.01.2020 | ||
Former | Request for examination was made Status updated on 19.01.2018 | ||
Former | The international publication has been made Status updated on 09.11.2016 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states BOE Technology Group Co., Ltd. No. 10 Jiuxianqiao Road Chaoyang District Beijing 100015 / CN | For all designated states Hefei BOE Optoelectronics Technology Co., Ltd. No. 2177, Tonglingbei Road Hefei, Anhui 230012 / CN | [2018/08] | Inventor(s) | 01 /
HUANG, Shiqiang No.9 Dize Rd. BDA Beijing 100176 / CN | [2018/08] | Representative(s) | Klunker IP Patentanwälte PartG mbB Destouchesstraße 68 80796 München / DE | [2018/08] | Application number, filing date | 15832868.2 | 16.09.2015 | [2018/08] | WO2015CN89721 | Priority number, date | CN201510184720 | 17.04.2015 Original published format: CN201510184720 | [2018/08] | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016165275 | Date: | 20.10.2016 | Language: | ZH | [2016/42] | Type: | A1 Application with search report | No.: | EP3285113 | Date: | 21.02.2018 | Language: | EN | [2018/08] | Type: | B1 Patent specification | No.: | EP3285113 | Date: | 06.05.2020 | Language: | EN | [2020/19] | Search report(s) | International search report - published on: | CN | 20.10.2016 | (Supplementary) European search report - dispatched on: | EP | 31.10.2018 | Classification | IPC: | G02F1/1362, H01L27/12 | [2018/08] | CPC: |
G02F1/136227 (EP,CN,US);
G02F1/134336 (US);
G02F1/13439 (US);
G02F1/136286 (EP,CN,US);
G02F1/1368 (US);
G09G3/006 (US);
H01L22/34 (CN);
H01L27/1214 (CN);
H01L27/1259 (CN);
G02F1/133345 (EP,US);
G02F1/134318 (CN,US);
G02F1/134372 (EP,US);
G02F1/136231 (EP,US);
G02F1/136254 (EP,CN,US);
G02F2201/121 (US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/08] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | ARRAYSUBSTRAT UND HERSTELLUNGSVERFAHREN UND PRÜFVERFAHREN DAFÜR UND ANZEIGEVORRICHTUNG | [2018/08] | English: | ARRAY SUBSTRATE AND MANUFACTURING METHOD AND TESTING METHOD THEREOF, AND DISPLAY DEVICE | [2018/08] | French: | SUBSTRAT DE RÉSEAU, SON PROCÉDÉ DE FABRICATION ET D'ESSAI, ET DISPOSITIF D'AFFICHAGE | [2018/08] | Entry into regional phase | 24.02.2016 | Translation filed | 24.02.2016 | National basic fee paid | 24.02.2016 | Search fee paid | 24.02.2016 | Designation fee(s) paid | 24.02.2016 | Examination fee paid | Examination procedure | 24.02.2016 | Date on which the examining division has become responsible | 24.06.2016 | Examination requested [2018/37] | 26.02.2019 | Amendment by applicant (claims and/or description) | 09.01.2020 | Communication of intention to grant the patent | 30.03.2020 | Fee for grant paid | 30.03.2020 | Fee for publishing/printing paid | 30.03.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 09.02.2021 | No opposition filed within time limit [2021/15] | Fees paid | Renewal fee | 27.09.2017 | Renewal fee patent year 03 | 25.09.2018 | Renewal fee patent year 04 | 24.09.2019 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 16.09.2015 | AL | 06.05.2020 | AT | 06.05.2020 | CY | 06.05.2020 | CZ | 06.05.2020 | DK | 06.05.2020 | EE | 06.05.2020 | ES | 06.05.2020 | FI | 06.05.2020 | HR | 06.05.2020 | IT | 06.05.2020 | LT | 06.05.2020 | LV | 06.05.2020 | MC | 06.05.2020 | MK | 06.05.2020 | MT | 06.05.2020 | NL | 06.05.2020 | PL | 06.05.2020 | RO | 06.05.2020 | RS | 06.05.2020 | SE | 06.05.2020 | SI | 06.05.2020 | SK | 06.05.2020 | SM | 06.05.2020 | TR | 06.05.2020 | BG | 06.08.2020 | NO | 06.08.2020 | GR | 07.08.2020 | IS | 06.09.2020 | PT | 07.09.2020 | IE | 16.09.2020 | LU | 16.09.2020 | BE | 30.09.2020 | CH | 30.09.2020 | LI | 30.09.2020 | [2022/32] |
Former [2022/28] | HU | 16.09.2015 | |
AL | 06.05.2020 | ||
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MC | 06.05.2020 | ||
MT | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
TR | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
IE | 16.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2022/27] | HU | 16.09.2015 | |
AL | 06.05.2020 | ||
AT | 06.05.2020 | ||
CY | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
MT | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
TR | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
IE | 16.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/37] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
IE | 16.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
CH | 30.09.2020 | ||
LI | 30.09.2020 | ||
Former [2021/36] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
LU | 16.09.2020 | ||
BE | 30.09.2020 | ||
Former [2021/27] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
LU | 16.09.2020 | ||
Former [2021/24] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SI | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/10] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
PL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SK | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/09] | AL | 06.05.2020 | |
AT | 06.05.2020 | ||
CZ | 06.05.2020 | ||
DK | 06.05.2020 | ||
EE | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
IT | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/08] | AL | 06.05.2020 | |
DK | 06.05.2020 | ||
ES | 06.05.2020 | ||
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RO | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
SM | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/04] | AL | 06.05.2020 | |
FI | 06.05.2020 | ||
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
NL | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2021/01] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
BG | 06.08.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/51] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
RS | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/50] | FI | 06.05.2020 | |
HR | 06.05.2020 | ||
LT | 06.05.2020 | ||
LV | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
GR | 07.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/48] | FI | 06.05.2020 | |
LT | 06.05.2020 | ||
SE | 06.05.2020 | ||
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
PT | 07.09.2020 | ||
Former [2020/47] | LT | 06.05.2020 | |
NO | 06.08.2020 | ||
IS | 06.09.2020 | ||
Former [2020/46] | IS | 06.09.2020 | Documents cited: | Search | [A]EP2672316 (BOE TECHNOLOGY GROUP CO LTD [CN]) [A] 1-15* the whole document *; | [XA]CN104076537 (BOE TECHNOLOGY GROUP CO LTD, et al) [X] 1,2,5,8,10,11 * the whole document * [A] 3,4,6,7,9,12-15; | [XA]WO2014169543 (HEFEI BOE OPTOELECTRONICS TECH [CN], et al) [X] 1,2,5,8,10,11 * the whole document * [A] 3,4,6,7,9,12-15; | [E]US2015370110 (LIN ZIJIN [CN], et al) [E] 1,2,5,8,10,11 * paragraphs [0005] , [0040] - [0098]; figures 1-9 *; | [E]US2016187732 (ZHAO HAITING [CN]) [E] 1,2,5,8,10-12 * paragraphs [0004] , [0051] - [0106]; figures 1-3F; claim - * | International search | [A]US2004263460 (LU RUNG-NAN [TW]) [A] 1-18* the whole document *; | [X]CN202948234U (BOE TECHNOLOGY GROUP CO LTD) [X] 12, 15 * description, paragraphs [0037]-[0069], and figures 1-5 *; | [X]CN103217840 (HEFEI BOE OPTOELECTRONICS TECH, et al) [X] 12, 15-17 * description, paragraphs [0057]-[[0102], and figures 1-3F *; | [X]CN103700671 (CPTW WUJIANG CO LTD, et al) [X] 12, 15-17 * description, paragraphs [0017]-[0027] and figures 1 and 2 *; | [PX]CN104749845 (HEFEI BOE OPTOELECTRONICS TECH, et al) [PX] 1-18 * claims 1-16, description, paragraphs [0027]-[0119], and figures 1-7 * |