EP3251404 - A WIRELESS DEVICE AND A METHOD THEREIN [Right-click to bookmark this link] | |||
Former [2017/49] | A WIRELESS DEVICE, A NETWORK NODE AND METHODS THEREIN | ||
[2019/25] | Status | No opposition filed within time limit Status updated on 10.07.2020 Database last updated on 12.07.2024 | |
Former | The patent has been granted Status updated on 28.06.2019 | ||
Former | Grant of patent is intended Status updated on 28.05.2019 | ||
Former | Examination is in progress Status updated on 09.02.2018 | ||
Former | Request for examination was made Status updated on 03.11.2017 | ||
Former | The international publication has been made Status updated on 20.06.2017 | Most recent event Tooltip | 08.07.2022 | Lapse of the patent in a contracting state New state(s): MK | published on 10.08.2022 [2022/32] | Applicant(s) | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | [2019/31] |
Former [2017/49] | For all designated states Telefonaktiebolaget LM Ericsson (publ) 164 83 Stockholm / SE | Inventor(s) | 01 /
EKLÖF, Cecilia Skogsliden 21 SE-187 41 Täby / SE | 02 /
BRISMAR, Sofia Törnrosvägen 64 181 61 Lidingö / SE | 03 /
SHI, Nianshan Mistelvägen 8 SE-176 74 Järfälla / SE | [2017/49] | Representative(s) | Zacco Sweden AB P.O. Box 5581 Löjtnantsgatan 21 114 85 Stockholm / SE | [N/P] |
Former [2019/31] | Zacco Sweden AB Valhallavägen 117 Box 5581 114 85 Stockholm / SE | ||
Former [2017/49] | Ericsson Patent Development Torshamnsgatan 21-23 164 80 Stockholm / SE | Application number, filing date | 15834729.4 | 22.12.2015 | [2017/49] | WO2015SE51385 | Priority number, date | US201562109812P | 30.01.2015 Original published format: US 201562109812 P | [2017/49] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016122373 | Date: | 04.08.2016 | Language: | EN | [2016/31] | Type: | A1 Application with search report | No.: | EP3251404 | Date: | 06.12.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 04.08.2016 takes the place of the publication of the European patent application. | [2017/49] | Type: | B1 Patent specification | No.: | EP3251404 | Date: | 31.07.2019 | Language: | EN | [2019/31] | Search report(s) | International search report - published on: | EP | 04.08.2016 | Classification | IPC: | H04W28/18 | [2017/49] | CPC: |
H04W28/18 (EP,CN,US);
H04W8/22 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/49] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | DRAHTLOSE VORRICHTUNG UND VERFAHREN DARIN | [2019/25] | English: | A WIRELESS DEVICE AND A METHOD THEREIN | [2019/25] | French: | DISPOSITIF SANS FIL ET PROCÉDÉ ASSOCIÉ | [2019/25] |
Former [2017/49] | DRAHTLOSE VORRICHTUNG, NETZWERKKNOTEN UND VERFAHREN DARIN | ||
Former [2017/49] | A WIRELESS DEVICE, A NETWORK NODE AND METHODS THEREIN | ||
Former [2017/49] | DISPOSITIF SANS FIL, NOEUD DE RÉSEAU, ET PROCÉDÉS ASSOCIÉS | Entry into regional phase | 19.06.2017 | National basic fee paid | 19.06.2017 | Designation fee(s) paid | 19.06.2017 | Examination fee paid | Examination procedure | 19.06.2017 | Amendment by applicant (claims and/or description) | 19.06.2017 | Examination requested [2017/49] | 19.06.2017 | Date on which the examining division has become responsible | 13.02.2018 | Despatch of a communication from the examining division (Time limit: M04) | 28.05.2018 | Reply to a communication from the examining division | 17.09.2018 | Despatch of a communication from the examining division (Time limit: M04) | 20.12.2018 | Reply to a communication from the examining division | 29.05.2019 | Communication of intention to grant the patent | 21.06.2019 | Fee for grant paid | 21.06.2019 | Fee for publishing/printing paid | 21.06.2019 | Receipt of the translation of the claim(s) | Opposition(s) | 03.06.2020 | No opposition filed within time limit [2020/33] | Fees paid | Renewal fee | 27.12.2017 | Renewal fee patent year 03 | 31.12.2018 | Renewal fee patent year 04 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 22.12.2015 | AL | 31.07.2019 | AT | 31.07.2019 | CY | 31.07.2019 | CZ | 31.07.2019 | DK | 31.07.2019 | EE | 31.07.2019 | ES | 31.07.2019 | FI | 31.07.2019 | HR | 31.07.2019 | IT | 31.07.2019 | LT | 31.07.2019 | LV | 31.07.2019 | MC | 31.07.2019 | MK | 31.07.2019 | MT | 31.07.2019 | NL | 31.07.2019 | PL | 31.07.2019 | RO | 31.07.2019 | RS | 31.07.2019 | SE | 31.07.2019 | SI | 31.07.2019 | SK | 31.07.2019 | SM | 31.07.2019 | TR | 31.07.2019 | IS | 30.10.2019 | BG | 31.10.2019 | NO | 31.10.2019 | GR | 01.11.2019 | PT | 02.12.2019 | IE | 22.12.2019 | LU | 22.12.2019 | BE | 31.12.2019 | CH | 31.12.2019 | FR | 31.12.2019 | LI | 31.12.2019 | [2022/32] |
Former [2021/34] | HU | 22.12.2015 | |
AL | 31.07.2019 | ||
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
MT | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 22.12.2019 | ||
LU | 22.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2021/32] | HU | 22.12.2015 | |
AL | 31.07.2019 | ||
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 22.12.2019 | ||
LU | 22.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2021/26] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CY | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 22.12.2019 | ||
LU | 22.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/51] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 22.12.2019 | ||
LU | 22.12.2019 | ||
BE | 31.12.2019 | ||
CH | 31.12.2019 | ||
FR | 31.12.2019 | ||
LI | 31.12.2019 | ||
Former [2020/49] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 22.12.2019 | ||
LU | 22.12.2019 | ||
FR | 31.12.2019 | ||
Former [2020/46] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IE | 22.12.2019 | ||
LU | 22.12.2019 | ||
Former [2020/39] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
MC | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/37] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SI | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/36] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
IS | 30.10.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/27] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
SM | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/25] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
CZ | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
SK | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/24] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
IS | 24.02.2020 | ||
Former [2020/23] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
IT | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
PL | 31.07.2019 | ||
RO | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/22] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
DK | 31.07.2019 | ||
EE | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/17] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
TR | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/15] | AL | 31.07.2019 | |
AT | 31.07.2019 | ||
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/12] | AT | 31.07.2019 | |
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
IS | 30.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/11] | AT | 31.07.2019 | |
ES | 31.07.2019 | ||
FI | 31.07.2019 | ||
HR | 31.07.2019 | ||
LT | 31.07.2019 | ||
LV | 31.07.2019 | ||
NL | 31.07.2019 | ||
RS | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
GR | 01.11.2019 | ||
PT | 02.12.2019 | ||
Former [2020/10] | AT | 31.07.2019 | |
FI | 31.07.2019 | ||
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
SE | 31.07.2019 | ||
BG | 31.10.2019 | ||
NO | 31.10.2019 | ||
PT | 02.12.2019 | ||
Former [2020/09] | FI | 31.07.2019 | |
LT | 31.07.2019 | ||
NL | 31.07.2019 | ||
NO | 31.10.2019 | ||
Former [2020/08] | LT | 31.07.2019 | |
NO | 31.10.2019 | Cited in | International search | [XYI]WO2006020983 (QUALCOMM INC [US], et al) [X] 1-3,10,11,13-15,22,23,25,26,31,32,34,35,40,41,43,44 * page 13, line 4, paragraph [0053] - line 6 * * page 13, line 3, paragraph [0054] - page 14, line 4 * * page 14, line 7, paragraph [0057] - line 10 * * page 15, line 1, paragraph [0059] - line 3 * * page 15, line 5, paragraph [0060] - page 16, line 9 * * page 19, paragraph [0067] - page 20 * * page 20, line 2, paragraph [0069] * [Y] 4,9,16,21,27,36[I] 5-8,12,17-20,24,28-30,33,37-39,42; | [XYI]WO2006104946 (QUALCOMM INC [US], et al) [X] 1-3,10,11,14,15,21-23,25,26,31,32,34,35,40,41,43,44 * page 2, line 10, paragraph [0006] - page 3, line 15 * * page 8, line 1, paragraph [0029] - line 7 * * page 8, line 1, paragraph [0031] - line 4 * * page 9, line 4, paragraph [0035] - line 8 * * page 9, line 10, paragraph [0035] - line 13 * * page 10, line 7, paragraph [0036] - line 10 * * page 11, line 2, paragraph [0044] - line 5 * * page 11, line 1, paragraph [0045] - line 5 * [Y] 4,9,16,21,27,36 [I] 5-8,12,17-20,24,28-30,33,37-39,42 |