EP3240684 - CONSTRUCTION MATERIAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 04.03.2022 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 26.03.2021 | ||
Former | Grant of patent is intended Status updated on 12.11.2020 | ||
Former | Request for examination was made Status updated on 06.10.2017 | ||
Former | The international publication has been made Status updated on 25.07.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Redeahold Apeldoorn B.V. Vlijtweg 4 8191 JP Wapenveld / NL | [2017/45] | Inventor(s) | 01 /
BATENBURG, Lawrence Fabian c/o Zeelsterstraat 259 5652 EJ Eindhoven / NL | 02 /
VAN TILBURG, Henricus Johannes Maria c/o Zeelsterstraat 259 5652 EJ Eindhoven / NL | [2017/45] | Representative(s) | V.O. P.O. Box 87930 Carnegieplein 5 2508 DH Den Haag / NL | [2017/45] | Application number, filing date | 15839075.7 | 28.12.2015 | [2017/45] | WO2015NL50911 | Priority number, date | EP20140200418 | 29.12.2014 Original published format: EP 14200418 | [2017/45] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016108686 | Date: | 07.07.2016 | Language: | EN | [2016/27] | Type: | A1 Application with search report | No.: | EP3240684 | Date: | 08.11.2017 | Language: | EN | The application published by WIPO in one of the EPO official languages on 07.07.2016 takes the place of the publication of the European patent application. | [2017/45] | Type: | B1 Patent specification | No.: | EP3240684 | Date: | 28.04.2021 | Language: | EN | [2021/17] | Search report(s) | International search report - published on: | EP | 07.07.2016 | Classification | IPC: | B32B15/08, B32B15/085, B32B15/095, B32B15/098, B32B15/20, B32B27/30, B32B27/32, B32B27/40, B32B27/42, E04D13/147, B32B3/26, E04D13/14 | [2020/46] | CPC: |
B32B15/08 (EP,US);
B32B15/082 (US);
B32B15/02 (US);
B32B15/085 (EP,US);
B32B15/095 (EP,US);
B32B15/098 (EP,US);
B32B15/20 (EP,US);
B32B27/20 (US);
B32B27/22 (US);
B32B27/30 (US);
B32B27/302 (EP,US);
B32B27/306 (EP,US);
B32B27/32 (EP,US);
B32B27/40 (EP,US);
B32B27/42 (EP,US);
B32B3/266 (EP,US);
E04D13/147 (EP,US);
B32B2250/03 (US);
B32B2274/00 (EP,US);
B32B2307/51 (US);
B32B2307/536 (EP,US);
B32B2307/54 (EP,US);
B32B2307/71 (US);
B32B2307/712 (EP,US);
B32B2307/7265 (EP,US);
B32B2419/00 (EP,US);
B32B2419/06 (EP,US);
E04D13/14 (EP,US)
(-)
|
Former IPC [2017/45] | B32B15/08, B32B15/085, B32B15/095, B32B15/098, B32B15/20, B32B27/30, B32B27/32, B32B27/40, B32B27/42, E04D13/14, B32B3/26 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/45] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BAUMATERIAL | [2020/46] | English: | CONSTRUCTION MATERIAL | [2017/45] | French: | MATÉRIAU DE CONSTRUCTION | [2017/45] |
Former [2017/45] | KONSTRUKTIONSMATERIAL | Entry into regional phase | 25.07.2017 | National basic fee paid | 25.07.2017 | Designation fee(s) paid | 25.07.2017 | Examination fee paid | Examination procedure | 25.07.2017 | Examination requested [2017/45] | 25.07.2017 | Date on which the examining division has become responsible | 21.09.2017 | Loss of particular rights, legal effect: Claims | 09.02.2018 | Amendment by applicant (claims and/or description) | 29.03.2018 | Despatch of communication of loss of particular rights: Claims {1} | 13.11.2020 | Communication of intention to grant the patent | 23.03.2021 | Fee for grant paid | 23.03.2021 | Fee for publishing/printing paid | 23.03.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.01.2022 | No opposition filed within time limit [2022/14] | Fees paid | Renewal fee | 30.11.2017 | Renewal fee patent year 03 | 22.01.2019 | Renewal fee patent year 04 | 19.11.2019 | Renewal fee patent year 05 | 24.11.2020 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 31.12.2018 | 04   M06   Fee paid on   22.01.2019 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 28.12.2015 | AL | 28.04.2021 | CY | 28.04.2021 | CZ | 28.04.2021 | EE | 28.04.2021 | ES | 28.04.2021 | HR | 28.04.2021 | IT | 28.04.2021 | LT | 28.04.2021 | LV | 28.04.2021 | MC | 28.04.2021 | MK | 28.04.2021 | MT | 28.04.2021 | RO | 28.04.2021 | RS | 28.04.2021 | SI | 28.04.2021 | SK | 28.04.2021 | SM | 28.04.2021 | TR | 28.04.2021 | BG | 28.07.2021 | NO | 28.07.2021 | GR | 29.07.2021 | IS | 28.08.2021 | PT | 30.08.2021 | LU | 28.12.2021 | [2024/41] |
Former [2024/29] | HU | 28.12.2015 | |
AL | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
TR | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 28.12.2021 | ||
Former [2024/22] | HU | 28.12.2015 | |
AL | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
MK | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 28.12.2021 | ||
Former [2023/30] | HU | 28.12.2015 | |
AL | 28.04.2021 | ||
CY | 28.04.2021 | ||
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 28.12.2021 | ||
Former [2023/29] | HU | 28.12.2015 | |
AL | 28.04.2021 | ||
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 28.12.2021 | ||
Former [2022/46] | AL | 28.04.2021 | |
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
LU | 28.12.2021 | ||
Former [2022/36] | AL | 28.04.2021 | |
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
IT | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/33] | AL | 28.04.2021 | |
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
MC | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/29] | AL | 28.04.2021 | |
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SI | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/26] | AL | 28.04.2021 | |
CZ | 28.04.2021 | ||
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/23] | CZ | 28.04.2021 | |
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/10] | CZ | 28.04.2021 | |
EE | 28.04.2021 | ||
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
IS | 22.12.2021 | ||
Former [2022/09] | CZ | 28.04.2021 | |
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RO | 28.04.2021 | ||
RS | 28.04.2021 | ||
SK | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/08] | CZ | 28.04.2021 | |
ES | 28.04.2021 | ||
HR | 28.04.2021 | ||
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RS | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2022/07] | HR | 28.04.2021 | |
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RS | 28.04.2021 | ||
SM | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/51] | HR | 28.04.2021 | |
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
RS | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
IS | 28.08.2021 | ||
PT | 30.08.2021 | ||
Former [2021/50] | HR | 28.04.2021 | |
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
PT | 30.08.2021 | ||
Former [2021/49] | HR | 28.04.2021 | |
LT | 28.04.2021 | ||
LV | 28.04.2021 | ||
BG | 28.07.2021 | ||
NO | 28.07.2021 | ||
GR | 29.07.2021 | ||
Former [2021/47] | LT | 28.04.2021 | |
BG | 28.07.2021 | ||
Former [2021/46] | LT | 28.04.2021 | Cited in | International search | [Y]EP0109505 (ALLIED CORP [US]) [Y] 12-16,25 * claims 1,7,11 *; | [YD]WO9531620 (RASMUSSEN KANN IND AS [DK], et al) [YD] 1-36 * figure 1 * * page 4, line 11 - line 28 * * page 3, line 20 - line 23 * * page 1, line 16 - line 20 * * page 2; claim 2 * * page 1, line 4 - line 9 *; | [A]EP1072732 (ROETTGER WILHELM [DE], et al) [A] 1-15 * claim 1 ** paragraph [0024] *; | [A]WO0228635 (MEIER POUL ERNST [DK]) [A] 1-15 * page 8, line 11 - line 21 *; | [Y]US2004076841 (SAUER RAUF [DE], et al) [Y] 6,7,10 * claims 1,7,11 *; | [A]WO2008130201 (NANO INTERFACE TECHNOLOGY [KR], et al) [A] 1-15 * claims 1,4,11 *; | [YD]WO2013066166 (UBBINK BV [NL]) [YD] 1-36 * claim 23 * * page 2, line 21 - line 22 *; | [A]EP2602095 (KEY & KEY HOLDING B V [NL]) [A] 1-15 * claims 1,9 * | by applicant | US4248926 | WO9531620 | WO2007015637 | WO2008130232 | WO2010110661 | WO2013066166 | - "vnyl chloride polymers", Kirk-Othmer Encyclopedia of Chemical Technology, (1997), vol. 24, pages 1017 - 1053 |