| EP3217775 - CIRCUIT BOARD AND METHOD FOR MANUFACTURING SAME [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.06.2022 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 25.06.2021 | ||
| Former | Grant of patent is intended Status updated on 21.02.2021 | ||
| Former | Request for examination was made Status updated on 11.08.2017 | ||
| Former | The international publication has been made Status updated on 03.04.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Kuraray Co., Ltd. 1621, Sakazu Kurashiki-shi Okayama 710-0801 / JP | [2017/37] | Inventor(s) | 01 /
TAKAHASHI, Takeshi c/o KURARAY CO. LTD. 36, Towada Kamisu-shi IBARAKI 3140197 / JP | 02 /
NAKASHIMA, Takahiro c/o KURARAY CO. LTD. 36, Towada Kamisu-shi IBARAKI 3140197 / JP | 03 /
ONODERA, Minoru c/o KURARAY CO. LTD. 892 Tsuitachi Saijo-shi Ehime 793-8585 / JP | 04 /
HARA, Tetsuya c/o KURARAY CO. LTD. 2045-1 Sakazu Kurashiki-shi Okayama 710-0801 / JP | [2017/37] | Representative(s) | Vossius & Partner Patentanwälte Rechtsanwälte mbB Siebertstrasse 3 81675 München / DE | [2017/37] | Application number, filing date | 15856520.0 | 30.10.2015 | [2017/37] | WO2015JP80743 | Priority number, date | JP20140227321 | 07.11.2014 Original published format: JP 2014227321 | [2017/37] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016072361 | Date: | 12.05.2016 | Language: | JA | [2016/19] | Type: | A1 Application with search report | No.: | EP3217775 | Date: | 13.09.2017 | Language: | EN | [2017/37] | Type: | B1 Patent specification | No.: | EP3217775 | Date: | 28.07.2021 | Language: | EN | [2021/30] | Search report(s) | International search report - published on: | JP | 12.05.2016 | (Supplementary) European search report - dispatched on: | EP | 04.07.2018 | Classification | IPC: | H05K3/46, B29C65/00, B29C65/02, B32B15/08, B32B38/00, // B29L31/34 | [2021/10] | CPC: |
H05K3/4632 (EP,KR,US);
B32B15/08 (EP,US);
B32B38/0036 (EP,US);
H05K1/0313 (US);
H05K1/0393 (US);
H05K3/022 (KR);
H05K3/10 (US);
H05K3/4635 (EP,US);
B29C65/02 (EP,US);
B29C66/034 (EP,US);
B29C66/1122 (EP,US);
B29C66/45 (EP,US);
B29C66/7352 (EP,US);
B29C66/7392 (EP,US);
B29C66/73921 (EP,US);
B29C66/742 (EP,US);
B29C66/91411 (EP,US);
B29C66/91445 (EP,US);
B29C66/91933 (EP,US);
B29L2031/3425 (EP,US);
H05K2201/0129 (EP,US);
H05K2201/0141 (EP,US);
H05K2201/0355 (EP,US);
H05K2203/0278 (EP,US);
|
| Former IPC [2018/31] | H05K3/46, B29C65/00, B29C65/02, B32B15/08, B32B38/00 | ||
| Former IPC [2017/37] | H05K3/46 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/37] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | LEITERPLATTE UND VERFAHREN ZUR HERSTELLUNG DAVON | [2017/37] | English: | CIRCUIT BOARD AND METHOD FOR MANUFACTURING SAME | [2017/37] | French: | CARTE DE CIRCUIT IMPRIMÉ ET SON PROCÉDÉ DE FABRICATION | [2017/37] | Entry into regional phase | 22.05.2017 | Translation filed | 07.06.2017 | National basic fee paid | 07.06.2017 | Search fee paid | 07.06.2017 | Designation fee(s) paid | 07.06.2017 | Examination fee paid | Examination procedure | 22.05.2017 | Date on which the examining division has become responsible | 07.06.2017 | Examination requested [2017/37] | 15.01.2019 | Amendment by applicant (claims and/or description) | 22.02.2021 | Communication of intention to grant the patent | 21.06.2021 | Fee for grant paid | 21.06.2021 | Fee for publishing/printing paid | 21.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 29.04.2022 | No opposition filed within time limit [2022/27] | Fees paid | Renewal fee | 25.09.2017 | Renewal fee patent year 03 | 06.09.2018 | Renewal fee patent year 04 | 30.08.2019 | Renewal fee patent year 05 | 17.09.2020 | Renewal fee patent year 06 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 30.10.2015 | AL | 28.07.2021 | AT | 28.07.2021 | CY | 28.07.2021 | CZ | 28.07.2021 | DK | 28.07.2021 | EE | 28.07.2021 | ES | 28.07.2021 | FI | 28.07.2021 | HR | 28.07.2021 | LT | 28.07.2021 | LV | 28.07.2021 | MC | 28.07.2021 | MK | 28.07.2021 | MT | 28.07.2021 | PL | 28.07.2021 | RO | 28.07.2021 | RS | 28.07.2021 | SE | 28.07.2021 | SI | 28.07.2021 | SK | 28.07.2021 | SM | 28.07.2021 | TR | 28.07.2021 | BG | 28.10.2021 | NO | 28.10.2021 | GR | 29.10.2021 | IE | 30.10.2021 | LU | 30.10.2021 | CH | 31.10.2021 | LI | 31.10.2021 | IS | 28.11.2021 | PT | 29.11.2021 | [2024/41] |
| Former [2024/29] | HU | 30.10.2015 | |
| AL | 28.07.2021 | ||
| AT | 28.07.2021 | ||
| CY | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| MK | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| TR | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IE | 30.10.2021 | ||
| LU | 30.10.2021 | ||
| CH | 31.10.2021 | ||
| LI | 31.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2024/22] | HU | 30.10.2015 | |
| AL | 28.07.2021 | ||
| AT | 28.07.2021 | ||
| CY | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| MK | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IE | 30.10.2021 | ||
| LU | 30.10.2021 | ||
| CH | 31.10.2021 | ||
| LI | 31.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2023/30] | HU | 30.10.2015 | |
| AL | 28.07.2021 | ||
| AT | 28.07.2021 | ||
| CY | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IE | 30.10.2021 | ||
| LU | 30.10.2021 | ||
| CH | 31.10.2021 | ||
| LI | 31.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2023/28] | HU | 30.10.2015 | |
| AL | 28.07.2021 | ||
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IE | 30.10.2021 | ||
| LU | 30.10.2021 | ||
| CH | 31.10.2021 | ||
| LI | 31.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/48] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IE | 30.10.2021 | ||
| LU | 30.10.2021 | ||
| CH | 31.10.2021 | ||
| LI | 31.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/37] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| LU | 30.10.2021 | ||
| CH | 31.10.2021 | ||
| LI | 31.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/35] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| LU | 30.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/33] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| MC | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/29] | AL | 28.07.2021 | |
| AT | 28.07.2021 | ||
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SI | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/25] | AT | 28.07.2021 | |
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| SM | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/24] | AT | 28.07.2021 | |
| CZ | 28.07.2021 | ||
| DK | 28.07.2021 | ||
| EE | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RO | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| SK | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/21] | AT | 28.07.2021 | |
| DK | 28.07.2021 | ||
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/10] | AT | 28.07.2021 | |
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| HR | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| LV | 28.07.2021 | ||
| PL | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| GR | 29.10.2021 | ||
| IS | 28.11.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/09] | AT | 28.07.2021 | |
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| RS | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| PT | 29.11.2021 | ||
| Former [2022/08] | AT | 28.07.2021 | |
| ES | 28.07.2021 | ||
| FI | 28.07.2021 | ||
| LT | 28.07.2021 | ||
| SE | 28.07.2021 | ||
| BG | 28.10.2021 | ||
| NO | 28.10.2021 | ||
| Former [2022/07] | AT | 28.07.2021 | |
| LT | 28.07.2021 | ||
| NO | 28.10.2021 | Documents cited: | Search | [XAI] WO2014046014 (KURARAY CO et al.) [X] 1,11 * abstract * * claims 12-14 * * figures 1-9 * * paragraphs [0025] , [0078] - [0082] - [0109] - [0113] - [0166] - [0199] - [0293] , [0307] , [0309] *[A] 10 [I] 2-9 | [XAI] US2015195921 (ONODERA MINORU et al.) * the whole document *[A] 10 [I] 2-9 | [X] US2005132566 (ROSEEN E C JR et al.) [X] 1,11 * paragraphs [0002] , [0007] - [0008] - [0022] , [0045] - [0056] * * claims 1,10-11,20,23-26,29 * | [XAI] US2008107833 (ONODERA MINORU et al.) [X] 1,11 * abstract * * paragraphs [0001] - [0002] *[A] 10 [I] 2-9 | International search | [A] JP2000263577 (KURARAY CO et al.) [A] 1-11 * , (Family: none) * | [A] JP2007515069 [A] 1-11 * , & US 2005/0132566 A1 & GB 2425898 A & WO 2005/069708 A1 & DE 112004002510 T & CN 1914964 A * | [A] JPH11309803 (KURARAY CO et al.) [A] 1-11 * , (Family: none) * |