EP3239047 - TORQUE REMOVING AND BALANCE MAINTAINING APPARATUS FOR PROPELLER-TYPE VERTICAL TAKEOFF AND LANDING AIRCRAFT [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 05.08.2022 Database last updated on 06.07.2024 | |
Former | The patent has been granted Status updated on 27.08.2021 | ||
Former | Grant of patent is intended Status updated on 28.04.2021 | ||
Former | Examination is in progress Status updated on 11.02.2019 | ||
Former | Request for examination was made Status updated on 29.09.2017 | ||
Former | The international publication has been made Status updated on 14.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Nam, Sung Ho 74-7 Daehak-ro 9-gil Buk-gu Daegu 41536 / KR | [2017/44] | Inventor(s) | 01 /
see applicant ... | [2017/44] | Representative(s) | Peters, Sebastian Martinus Octrooibureau Vriesendorp & Gaade B.V. Koninginnegracht 19 2514 AB Den Haag / NL | [2017/44] | Application number, filing date | 15873528.2 | 10.12.2015 | [2017/44] | WO2015KR13532 | Priority number, date | KR20140190163 | 26.12.2014 Original published format: KR 20140190163 | [2017/44] | Filing language | KO | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016105001 | Date: | 30.06.2016 | Language: | KO | [2016/26] | Type: | A1 Application with search report | No.: | EP3239047 | Date: | 01.11.2017 | Language: | EN | [2017/44] | Type: | B1 Patent specification | No.: | EP3239047 | Date: | 29.09.2021 | Language: | EN | [2021/39] | Search report(s) | International search report - published on: | KR | 30.06.2016 | (Supplementary) European search report - dispatched on: | EP | 09.05.2018 | Classification | IPC: | B64C17/06, B64C27/82 | [2018/23] | CPC: |
B64C27/82 (EP,CN,US);
B64C27/008 (CN);
B64C17/06 (EP,US);
B64C27/06 (EP,CN,US);
B64C27/08 (EP,CN,US);
B64C27/10 (EP,CN,US)
|
Former IPC [2017/44] | B64C27/10 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/44] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | DREHMOMENTENTFERNUNG UND GLEICHGEWICHTSAUFRECHTERHALTUNGSVORRICHTUNG FÜR EIN VERTIKAL STARTENDES UND LANDENDES FLUGZEUG MIT PROPELLER | [2017/44] | English: | TORQUE REMOVING AND BALANCE MAINTAINING APPARATUS FOR PROPELLER-TYPE VERTICAL TAKEOFF AND LANDING AIRCRAFT | [2017/44] | French: | APPAREIL DE SUPPRESSION DE COUPLE ET DE MAINTIEN D'ÉQUILIBRE POUR AVION À DÉCOLLAGE ET ATTERRISSAGE VERTICAUX DE TYPE À HÉLICE | [2017/44] | Entry into regional phase | 14.07.2017 | Translation filed | 14.07.2017 | National basic fee paid | 14.07.2017 | Search fee paid | 14.07.2017 | Designation fee(s) paid | 14.07.2017 | Examination fee paid | Examination procedure | 14.07.2017 | Examination requested [2017/44] | 14.07.2017 | Date on which the examining division has become responsible | 03.12.2018 | Amendment by applicant (claims and/or description) | 14.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.06.2019 | Reply to a communication from the examining division | 29.04.2021 | Communication of intention to grant the patent | 23.08.2021 | Fee for grant paid | 23.08.2021 | Fee for publishing/printing paid | 23.08.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 30.06.2022 | No opposition filed within time limit [2022/36] | Fees paid | Renewal fee | 19.12.2017 | Renewal fee patent year 03 | 28.12.2018 | Renewal fee patent year 04 | 23.12.2019 | Renewal fee patent year 05 | 16.12.2020 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 10.12.2015 | AL | 29.09.2021 | AT | 29.09.2021 | CY | 29.09.2021 | CZ | 29.09.2021 | DK | 29.09.2021 | EE | 29.09.2021 | ES | 29.09.2021 | FI | 29.09.2021 | HR | 29.09.2021 | IT | 29.09.2021 | LT | 29.09.2021 | LV | 29.09.2021 | MC | 29.09.2021 | MK | 29.09.2021 | NL | 29.09.2021 | PL | 29.09.2021 | RO | 29.09.2021 | RS | 29.09.2021 | SE | 29.09.2021 | SI | 29.09.2021 | SK | 29.09.2021 | SM | 29.09.2021 | TR | 29.09.2021 | IE | 10.12.2021 | LU | 10.12.2021 | BG | 29.12.2021 | NO | 29.12.2021 | GR | 30.12.2021 | BE | 31.12.2021 | CH | 31.12.2021 | LI | 31.12.2021 | IS | 29.01.2022 | PT | 31.01.2022 | [2024/29] |
Former [2024/22] | HU | 10.12.2015 | |
AL | 29.09.2021 | ||
AT | 29.09.2021 | ||
CY | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
MK | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
SM | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/33] | HU | 10.12.2015 | |
AL | 29.09.2021 | ||
AT | 29.09.2021 | ||
CY | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
SM | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/30] | HU | 10.12.2015 | |
AL | 29.09.2021 | ||
AT | 29.09.2021 | ||
CY | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/27] | HU | 10.12.2015 | |
AL | 29.09.2021 | ||
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/10] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
IT | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/03] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
CH | 31.12.2021 | ||
LI | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2023/01] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SI | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
BE | 31.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/48] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
IE | 10.12.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/46] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
LU | 10.12.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/36] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
DK | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/33] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
MC | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/29] | AL | 29.09.2021 | |
AT | 29.09.2021 | ||
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/24] | AT | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
NL | 29.09.2021 | ||
PL | 29.09.2021 | ||
RO | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
IS | 29.01.2022 | ||
PT | 31.01.2022 | ||
Former [2022/23] | AT | 29.09.2021 | |
CZ | 29.09.2021 | ||
EE | 29.09.2021 | ||
ES | 29.09.2021 | ||
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
PL | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
SK | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
PT | 31.01.2022 | ||
Former [2022/21] | AT | 29.09.2021 | |
FI | 29.09.2021 | ||
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
Former [2022/10] | FI | 29.09.2021 | |
HR | 29.09.2021 | ||
LT | 29.09.2021 | ||
LV | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
GR | 30.12.2021 | ||
Former [2022/09] | FI | 29.09.2021 | |
LT | 29.09.2021 | ||
RS | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
Former [2022/08] | FI | 29.09.2021 | |
LT | 29.09.2021 | ||
SE | 29.09.2021 | ||
BG | 29.12.2021 | ||
NO | 29.12.2021 | ||
Former [2022/07] | LT | 29.09.2021 | |
NO | 29.12.2021 | Documents cited: | Search | [A]US1081504 (JENKINS CHARLES FRANCIS [US]) [A] 1 * page 1, line 33 - line 49; figure 1; claims 1-4 ** page 1, line 73 - line 95 *; | [A]US3204467 (FISCHEL EDUARD M) [A] 2 * figures 1, 3 *; | [I]DE3414650 (SCHMIDT EDWIN) [I] 1-4 * page 2, lines 12-14; figures 1-3; claim 1 * * page 3, line 1 - line 21 *; | [I]GB2283471 (WILKINSON JOHN [GB]) [I] 1 * page 2; figures 1, 2, 6; claim 1 *; | [I]CN103419931 (LI XIAOHUAN) [I] 1 * paragraph [0001]; figure 1; claims 1, 2 * * paragraph [0011] - paragraph [0015] * * paragraph [0022] * | International search | [A]US6976653 (PERLO PIERO [IT], et al) [A] 1-4 * See abstract, column 1, line 66-column 2, line 65 and figures 1-4, 8. *; | [A]KR100832067B (KOREA AEROSPACE RES INST [KR]) [A] 1-4* See abstract, paragraphs [0022]-[0031] and figures 1-4. *; | [A]KR20110030094 (KOREA IND TECH INST [KR]) [A] 1-4 * See abstract, paragraphs [0020]-[0030], claims 1-2 and figures 1-2. *; | [A]KR20110085541 (PARK KYUNG SUP [KR], et al) [A] 1-4 * See abstract, paragraphs [0027]-[0030] and figure 1. *; | [A]KR20130042337 (KOREA AEROSPACE RES INST [KR]) [A] 1-4 * See abstract, paragraphs [0021]-[0022] and figure 4. * |