EP3280197 - USER DEVICE AND BASE STATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 25.11.2022 Database last updated on 19.07.2024 | |
Former | The patent has been granted Status updated on 17.12.2021 | ||
Former | Grant of patent is intended Status updated on 03.10.2021 | ||
Former | Examination is in progress Status updated on 22.02.2019 | ||
Former | Request for examination was made Status updated on 05.01.2018 | ||
Former | The international publication has been made Status updated on 05.07.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states NTT DOCOMO, INC. 11-1, Nagatacho 2-chome Chiyoda-ku Tokyo 100-6150 / JP | [2018/06] | Inventor(s) | 01 /
TESHIMA, Kunihiko c/o Intellectual Property Department NTT DOCOMO, INC. Sanno Park Tower 11-1 Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | 02 /
UCHINO, Tooru c/o Intellectual Property Department NTT DOCOMO, INC. Sanno Park Tower 11-1 Nagatacho 2-chome, Chiyoda-ku Tokyo 100-6150 / JP | [2018/06] | Representative(s) | Hoffmann Eitle Patent- und Rechtsanwälte PartmbB Arabellastraße 30 81925 München / DE | [2018/06] | Application number, filing date | 15887799.3 | 24.12.2015 | [2018/06] | WO2015JP86069 | Priority number, date | JP20150077225 | 03.04.2015 Original published format: JP 2015077225 | [2018/06] | Filing language | JA | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016157657 | Date: | 06.10.2016 | Language: | JA | [2016/40] | Type: | A1 Application with search report | No.: | EP3280197 | Date: | 07.02.2018 | Language: | EN | [2018/06] | Type: | B1 Patent specification | No.: | EP3280197 | Date: | 19.01.2022 | Language: | EN | [2022/03] | Search report(s) | International search report - published on: | JP | 06.10.2016 | (Supplementary) European search report - dispatched on: | EP | 15.03.2018 | Classification | IPC: | H04W56/00, H04W52/02, H04W72/04 | [2018/06] | CPC: |
H04W56/0005 (EP,US);
H04B17/364 (US);
H04W16/14 (US);
H04W52/02 (EP,US);
H04W56/00 (EP,US);
H04W72/04 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/06] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | BENUTZERVORRICHTUNG UND BASISSTATION | [2018/06] | English: | USER DEVICE AND BASE STATION | [2018/06] | French: | DISPOSITIF UTILISATEUR ET STATION DE BASE | [2018/06] | Entry into regional phase | 04.07.2017 | Translation filed | 04.07.2017 | National basic fee paid | 04.07.2017 | Search fee paid | 04.07.2017 | Designation fee(s) paid | 04.07.2017 | Examination fee paid | Examination procedure | 04.07.2017 | Examination requested [2018/06] | 04.07.2017 | Date on which the examining division has become responsible | 04.10.2018 | Amendment by applicant (claims and/or description) | 26.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 26.06.2019 | Reply to a communication from the examining division | 25.03.2020 | Despatch of a communication from the examining division (Time limit: M04) | 17.07.2020 | Reply to a communication from the examining division | 04.05.2021 | Despatch of a communication from the examining division (Time limit: M04) | 27.08.2021 | Reply to a communication from the examining division | 04.10.2021 | Communication of intention to grant the patent | 10.12.2021 | Fee for grant paid | 10.12.2021 | Fee for publishing/printing paid | 10.12.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 20.10.2022 | No opposition filed within time limit [2022/52] | Fees paid | Renewal fee | 14.12.2017 | Renewal fee patent year 03 | 13.12.2018 | Renewal fee patent year 04 | 09.12.2019 | Renewal fee patent year 05 | 10.12.2020 | Renewal fee patent year 06 | 13.12.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.12.2015 | AL | 19.01.2022 | AT | 19.01.2022 | CY | 19.01.2022 | CZ | 19.01.2022 | DK | 19.01.2022 | EE | 19.01.2022 | ES | 19.01.2022 | HR | 19.01.2022 | IT | 19.01.2022 | LT | 19.01.2022 | LV | 19.01.2022 | MC | 19.01.2022 | MK | 19.01.2022 | NL | 19.01.2022 | PL | 19.01.2022 | RO | 19.01.2022 | RS | 19.01.2022 | SE | 19.01.2022 | SI | 19.01.2022 | SK | 19.01.2022 | SM | 19.01.2022 | BG | 19.04.2022 | NO | 19.04.2022 | GR | 20.04.2022 | IS | 19.05.2022 | PT | 19.05.2022 | [2024/29] |
Former [2024/27] | HU | 24.12.2015 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
MK | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/21] | HU | 24.12.2015 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CY | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2024/18] | HU | 24.12.2015 | |
AL | 19.01.2022 | ||
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/35] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
IT | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/10] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SI | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2023/01] | AL | 19.01.2022 | |
AT | 19.01.2022 | ||
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/49] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SK | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/48] | AT | 19.01.2022 | |
CZ | 19.01.2022 | ||
DK | 19.01.2022 | ||
EE | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/47] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RO | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
SM | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/46] | AT | 19.01.2022 | |
DK | 19.01.2022 | ||
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/42] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
IS | 19.05.2022 | ||
PT | 19.05.2022 | ||
Former [2022/36] | AT | 19.01.2022 | |
ES | 19.01.2022 | ||
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
LV | 19.01.2022 | ||
NL | 19.01.2022 | ||
PL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
GR | 20.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/35] | ES | 19.01.2022 | |
HR | 19.01.2022 | ||
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
RS | 19.01.2022 | ||
SE | 19.01.2022 | ||
BG | 19.04.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/34] | ES | 19.01.2022 | |
LT | 19.01.2022 | ||
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
PT | 19.05.2022 | ||
Former [2022/33] | LT | 19.01.2022 | |
NL | 19.01.2022 | ||
NO | 19.04.2022 | ||
Former [2022/30] | NL | 19.01.2022 | Documents cited: | Search | [XI]WO2012119626 (PANASONIC CORP [JP], et al) [X] 1,5,6,8 * figure 25 * * page 10, line 29 - line 31 * * page 10, line 1 - line 9 * * page 101, line 26 - line 29 * * page 102, line 32 - line 35 * * page 103, line 1 - line 4 * * page 103, line 13 - line 28 * [I] 2-4,7,9; | [XP]WO2015099495 (SAMSUNG ELECTRONICS CO LTD [KR]) [XP] 1,7,8 * figure 37 * * 4th paragraph; page 83 ** Embodiment passages; page 85 *; | [XP]EP2911462 (BROADCOM CORP [US]) [XP] 1,5-9 * figures 1-4 * * paragraph [0003] * * paragraph [0027] * * paragraph [0040] - paragraph [0041] *; | [XI] - INTEL CORPORATION, "Discussion on SFN timing difference in Dual connectivity", vol. RAN WG4, no. Seoul, Korea; 20140519 - 20140523, (20140518), 3GPP DRAFT; R4-143028, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN4/Docs/, (20140518), XP050797797 [X] 1,3,7-9 * Section 2.1,Section 2.2 (option 2, Observation 3) * * figure 3 * [I] 2,4-6 | International search | [A]WO2013137806 (ERICSSON TELEFON AB L M [SE]) [A] 1-8 * , page 9, line 21 to page 44, line 1 & US 2014/0056165 A1 *; | [Y]WO2015008749 (NTT DOCOMO INC [JP]) [Y] 1-8 * , paragraphs [0044] to [0057] & JP 2015-23472 A *; | [Y] - INTEL CORPORATION, "Discussion on SFN timing difference in Dual connectivity", 3GPP TSG-RAN WG4#71 R4-143028, (20140523), URL: http://www.3gpp.org/ftp/tsg_ran/WG4_Radio/TSGR471/Docs/R4-143028.zip, XP050797797 [Y] 1-8 | [Y] - SAMSUNG, "Measurement gap handling in SeNB in asynchronuous", 3GPP TSG-RAN WG2#87 R2-143080, (20140822), URL: http://www.3gpp.org/ftp/tsgran/WG2_RL2/TSGR287/Docs/R2-143080.zip, XP050794207 [Y] 1-8 | [A] - HUAWEI et al., "Discussion on testing methodology for DC", 3GPP TSG-RAN WG4#74 R4-150271, (20150213), URL: http://www.3gpp.org/ftp/tsg_ran/WG4_Radio/TSGR4_74/Docs/R4-150271.zip, XP050937761 [A] 1-8 | [A] - NTT DOCOMO, "RRM requirements for Dual Connectivity", 3GPP TSG-RAN WG4#71 R4-143336, (20140523), URL: http://www.3gpp.org/ftp/tsgran/WG4_Radio/TSGR4_71/Docs/R4-143336.zip, XP050798063 [A] 1-8 |