| EP3286864 - USER EQUIPMENT AND METHODS FOR PHYSICAL UPLINK CONTROL CHANNEL (PUCCH) RESOURCE ALLOCATION AND COMMUNICATION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 20.03.2026 Database last updated on 26.03.2026 | |
| Former | The patent has been granted Status updated on 11.04.2025 | ||
| Former | Grant of patent is intended Status updated on 08.12.2024 | ||
| Former | Examination is in progress Status updated on 18.02.2020 | ||
| Former | Request for examination was made Status updated on 26.01.2018 | ||
| Former | The international publication has been made Status updated on 02.11.2016 | Most recent event Tooltip | 20.03.2026 | No opposition filed within time limit | published on 22.04.2026 [2026/17] | Applicant(s) | For all designated states Apple Inc. One Apple Park Way Cupertino, CA 95014 / US | [2020/52] |
| Former [2018/09] | For all designated states Intel IP Corporation 2200 Mission College Boulevard Santa Clara, CA 95054 / US | Inventor(s) | 01 /
CHANG, Wenting 8F Raycom Infotech Park A No.2 Kexueyuan South Road Beijing 100190 / CN | 02 /
ZHU, Yuan Room 605 Building 16 Mo Li Yuan Bei Yuan Jiayuan, Chaoyang Beijing 100013 / CN | 03 /
ZHANG, Yushu Raycom Building A 8F No.2 Kexueyuan South Road Zhong Guan Cun Haidan District Beijing 100190 / CN | 04 /
XIONG, Gang 16682 NW Arizona Drive Beaverton, Oregon 97006 / US | 05 /
HAN, Seunghee 1118 Mallard Ridge Circle San Jose, California 95120 / US | [2018/09] | Representative(s) | Bateman, Samuel Alec Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | [N/P] |
| Former [2025/20] | Wardle, Callum Tarn Withers & Rogers LLP 2 London Bridge London SE1 9RA / GB | ||
| Former [2018/09] | Goddar, Heinz J. Boehmert & Boehmert Anwaltspartnerschaft mbB Pettenkoferstrasse 22 80336 München / DE | Application number, filing date | 15890142.1 | 15.09.2015 | [2018/09] | WO2015US50250 | Priority number, date | WO2015CN77099 | 21.04.2015 Original published format: PCT/CN2015/077099 | [2018/09] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2016171748 | Date: | 27.10.2016 | Language: | EN | [2016/43] | Type: | A1 Application with search report | No.: | EP3286864 | Date: | 28.02.2018 | Language: | EN | The application published by WIPO in one of the EPO official languages on 27.10.2016 takes the place of the publication of the European patent application. | [2018/09] | Type: | B1 Patent specification | No.: | EP3286864 | Date: | 14.05.2025 | Language: | EN | [2025/20] | Search report(s) | International search report - published on: | KR | 27.10.2016 | (Supplementary) European search report - dispatched on: | EP | 02.11.2018 | Classification | IPC: | H04L5/00, H04W72/00, H04L1/00 | [2018/49] | CPC: |
H04L5/0094 (EP,CN,US);
H04L5/0051 (CN,US);
H04L1/00 (US);
H04L5/0037 (EP,US);
H04L5/0053 (EP,US);
H04W72/21 (US);
|
| Former IPC [2018/09] | H04L5/00 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/09] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | BENUTZERGERÄT UND VERFAHREN ZUR ZUWEISUNG UND KOMMUNIKATION VON PUCCH-RESSOURCEN | [2018/09] | English: | USER EQUIPMENT AND METHODS FOR PHYSICAL UPLINK CONTROL CHANNEL (PUCCH) RESOURCE ALLOCATION AND COMMUNICATION | [2018/09] | French: | ÉQUIPEMENT UTILISATEUR ET PROCÉDÉS D'ATTRIBUTION ET DE COMMUNICATION DE RESSOURCES DE CANAL DE COMMANDE DE LIAISON MONTANTE PHYSIQUE (PUCCH) | [2018/09] | Entry into regional phase | 18.09.2017 | National basic fee paid | 18.09.2017 | Search fee paid | 18.09.2017 | Designation fee(s) paid | 18.09.2017 | Examination fee paid | Examination procedure | 18.09.2017 | Examination requested [2018/09] | 18.09.2017 | Date on which the examining division has become responsible | 16.05.2019 | Amendment by applicant (claims and/or description) | 21.02.2020 | Despatch of a communication from the examining division (Time limit: M04) | 17.06.2020 | Reply to a communication from the examining division | 16.06.2021 | Despatch of a communication from the examining division (Time limit: M02) | 15.07.2021 | Reply to a communication from the examining division | 17.01.2023 | Despatch of a communication from the examining division (Time limit: M04) | 16.05.2023 | Reply to a communication from the examining division | 09.12.2024 | Communication of intention to grant the patent | 08.04.2025 | Fee for grant paid | 08.04.2025 | Fee for publishing/printing paid | 08.04.2025 | Receipt of the translation of the claim(s) | Opposition(s) | 17.02.2026 | No opposition filed within time limit [2026/17] | Fees paid | Renewal fee | 18.09.2017 | Renewal fee patent year 03 | 11.09.2018 | Renewal fee patent year 04 | 13.09.2019 | Renewal fee patent year 05 | 14.09.2020 | Renewal fee patent year 06 | 10.09.2021 | Renewal fee patent year 07 | 16.08.2022 | Renewal fee patent year 08 | 24.08.2023 | Renewal fee patent year 09 | 13.08.2024 | Renewal fee patent year 10 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 14.05.2025 | BG | 14.05.2025 | CZ | 14.05.2025 | DK | 14.05.2025 | EE | 14.05.2025 | ES | 14.05.2025 | FI | 14.05.2025 | HR | 14.05.2025 | IT | 14.05.2025 | LV | 14.05.2025 | NL | 14.05.2025 | PL | 14.05.2025 | RO | 14.05.2025 | SK | 14.05.2025 | SM | 14.05.2025 | NO | 14.08.2025 | RS | 14.08.2025 | GR | 15.08.2025 | IS | 14.09.2025 | PT | 15.09.2025 | [2026/10] |
| Former [2026/09] | AT | 14.05.2025 | |
| BG | 14.05.2025 | ||
| CZ | 14.05.2025 | ||
| DK | 14.05.2025 | ||
| ES | 14.05.2025 | ||
| FI | 14.05.2025 | ||
| HR | 14.05.2025 | ||
| LV | 14.05.2025 | ||
| NL | 14.05.2025 | ||
| PL | 14.05.2025 | ||
| SM | 14.05.2025 | ||
| NO | 14.08.2025 | ||
| RS | 14.08.2025 | ||
| GR | 15.08.2025 | ||
| IS | 14.09.2025 | ||
| PT | 15.09.2025 | ||
| Former [2026/08] | AT | 14.05.2025 | |
| BG | 14.05.2025 | ||
| DK | 14.05.2025 | ||
| ES | 14.05.2025 | ||
| FI | 14.05.2025 | ||
| HR | 14.05.2025 | ||
| LV | 14.05.2025 | ||
| NL | 14.05.2025 | ||
| PL | 14.05.2025 | ||
| SM | 14.05.2025 | ||
| NO | 14.08.2025 | ||
| RS | 14.08.2025 | ||
| GR | 15.08.2025 | ||
| IS | 14.09.2025 | ||
| PT | 15.09.2025 | ||
| Former [2025/49] | AT | 14.05.2025 | |
| BG | 14.05.2025 | ||
| ES | 14.05.2025 | ||
| FI | 14.05.2025 | ||
| HR | 14.05.2025 | ||
| LV | 14.05.2025 | ||
| NL | 14.05.2025 | ||
| PL | 14.05.2025 | ||
| NO | 14.08.2025 | ||
| RS | 14.08.2025 | ||
| GR | 15.08.2025 | ||
| IS | 14.09.2025 | ||
| PT | 15.09.2025 | ||
| Former [2025/48] | AT | 14.05.2025 | |
| BG | 14.05.2025 | ||
| ES | 14.05.2025 | ||
| FI | 14.05.2025 | ||
| HR | 14.05.2025 | ||
| NL | 14.05.2025 | ||
| PL | 14.05.2025 | ||
| NO | 14.08.2025 | ||
| RS | 14.08.2025 | ||
| GR | 15.08.2025 | ||
| PT | 15.09.2025 | ||
| Former [2025/47] | BG | 14.05.2025 | |
| ES | 14.05.2025 | ||
| FI | 14.05.2025 | ||
| NL | 14.05.2025 | ||
| PL | 14.05.2025 | ||
| NO | 14.08.2025 | ||
| GR | 15.08.2025 | ||
| PT | 15.09.2025 | ||
| Former [2025/46] | ES | 14.05.2025 | |
| FI | 14.05.2025 | ||
| PT | 15.09.2025 | Documents cited: | Search | [XI] US2012300741 (HAN SEUNG HEE et al.) [X] 1-3,5,9-13 * paragraphs [0053] , [0157] , [0187] , [0222] - [0223] - [0253] - [0282] - [0301] * * figures 45-48 *[I] 4,6-8,14,15 | [I] EP2421317 (HTC CORP et al.) [I] 1-15 * paragraphs [0026] - [0029] * | [A] US2010309867 (PALANKI RAVI et al.) [A] 1-15 * the whole document * | [A] ALCATEL-LUCENT ET AL: "PUCCH design for A/N feedbacks on PCell up to 32 carrier aggregation", vol. RAN WG2, no. Belgrade, Serbia; 20150420 - 20150424, 19 April 2015 (2015-04-19), XP050934205, Retrieved from the Internet | International search | [Y] US2011235602 (JI TINGFANG et al.) [Y] 1-28 * See paragraphs [0028], [0047]-[0060], [0087]-[0102] claims 1, 23, 34, 44; and figures 2, 5, 11. * | [Y] US2011081932 (ASTELY DAVID et al.) [Y] 11, 20, 25 * See paragraphs [0034], [0046], [0047]; claims 1, 4; and figure 7. * | [A] US2013083754 (CHEN WANSHI et al.) [A] 1-28 * See paragraphs [0083]-[0093]; and figures 9-12. * | [Y] ALCATEL -LUCENT ET AL.: "PUCCH design for A/N feedbacks on PCell up to 32 carrier aggregation", R1-151326, 3GPP TSG-RAN WG1 MEETING #80BIS, 11 April 2015 (2015-04-11), Belgrade, Serbia, XP050934205 [Y] 1-28 * See pages 2, 3; and figure 1. * | [A] HUAWEI ET AL.: "New PUCCH format design to support UCI transmission for up to 32 component carriers", R1-151275, 3GPP TSG RAN WG1 MEETING #80BIS, 10 April 2015 (2015-04-10), Belgrade, Serbia, XP050934155 [A] 1-28 * See pages 1-4; and figures 1, 2. * | by applicant | US2012300741 | EP2421317 |