EP3171269 - DATA TRANSMISSION METHOD AND MOBILE TERMINAL [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.03.2023 Database last updated on 29.10.2024 | |
Former | The patent has been granted Status updated on 25.03.2022 | ||
Former | Grant of patent is intended Status updated on 10.02.2022 | ||
Former | Examination is in progress Status updated on 10.09.2019 | ||
Former | Request for examination was made Status updated on 21.04.2017 | ||
Former | The international publication has been made Status updated on 01.04.2017 | ||
Former | unknown Status updated on 11.11.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan, Guangdong 523860 / CN | [N/P] |
Former [2022/17] | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | ||
Former [2019/50] | For all designated states GUANGDONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. No. 18 Haibin Road Wusha, Chang'an Dongguan Guangdong 523860 / CN | ||
Former [2017/21] | For all designated states GUANG DONG OPPO MOBILE TELECOMMUNICATIONS CORP., LTD. Haibin Road No. 18 Wusha Chang'an Dongguan, Guangdong 523860 / CN | Inventor(s) | 01 /
TIAN, Chen No.18 Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN | 02 /
LIAO, Fuchun No.18 Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN | 03 /
ZHANG, Jialiang No.18 Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN | 04 /
ZHANG, Jun No.18 Haibin Road Wusha Chang'an Dongguan Guangdong 523860 / CN | [2017/21] | Representative(s) | Papa, Elisabetta, et al Società Italiana Brevetti S.p.A Piazza di Pietra, 38-39 00186 Roma / IT | [2022/17] |
Former [2017/21] | Petraz, Gilberto Luigi, et al GLP S.r.l. Viale Europa Unita, 171 33100 Udine / IT | Application number, filing date | 15890158.7 | 24.09.2015 | [2017/21] | WO2015CN90625 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017049556 | Date: | 30.03.2017 | Language: | ZH | [2017/13] | Type: | A1 Application with search report | No.: | EP3171269 | Date: | 24.05.2017 | Language: | EN | [2017/21] | Type: | B1 Patent specification | No.: | EP3171269 | Date: | 27.04.2022 | Language: | EN | [2022/17] | Search report(s) | International search report - published on: | CN | 30.03.2017 | (Supplementary) European search report - dispatched on: | EP | 05.12.2017 | Classification | IPC: | G06F9/455, G06F13/40, G06F13/42 | [2018/01] | CPC: |
G06F13/4286 (EP,US);
G06F13/4022 (EP,US);
G06F8/65 (EP,US);
G06F9/455 (US)
|
Former IPC [2017/21] | G06F9/455 | Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/21] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | Title | German: | DATENÜBERTRAGUNGSVERFAHREN UND MOBILES ENDGERÄT | [2017/21] | English: | DATA TRANSMISSION METHOD AND MOBILE TERMINAL | [2017/21] | French: | PROCÉDÉ DE TRANSMISSION DE DONNÉES ET TERMINAL MOBILE | [2017/21] | Entry into regional phase | 28.10.2016 | Translation filed | 28.10.2016 | National basic fee paid | 28.10.2016 | Search fee paid | 28.10.2016 | Designation fee(s) paid | 28.10.2016 | Examination fee paid | Examination procedure | 28.10.2016 | Examination requested [2017/21] | 28.10.2016 | Date on which the examining division has become responsible | 23.04.2018 | Amendment by applicant (claims and/or description) | 12.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 28.11.2019 | Reply to a communication from the examining division | 19.01.2022 | Cancellation of oral proceeding that was planned for 27.01.2022 | 27.01.2022 | Date of oral proceedings (cancelled) | 11.02.2022 | Communication of intention to grant the patent | 21.03.2022 | Fee for grant paid | 21.03.2022 | Fee for publishing/printing paid | 21.03.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 30.01.2023 | No opposition filed within time limit [2023/14] | Fees paid | Renewal fee | 29.09.2017 | Renewal fee patent year 03 | 30.08.2018 | Renewal fee patent year 04 | 22.08.2019 | Renewal fee patent year 05 | 25.08.2020 | Renewal fee patent year 06 | 24.08.2021 | Renewal fee patent year 07 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 24.09.2015 | AL | 27.04.2022 | AT | 27.04.2022 | CY | 27.04.2022 | CZ | 27.04.2022 | DK | 27.04.2022 | EE | 27.04.2022 | ES | 27.04.2022 | FI | 27.04.2022 | HR | 27.04.2022 | IT | 27.04.2022 | LT | 27.04.2022 | LV | 27.04.2022 | MC | 27.04.2022 | MK | 27.04.2022 | MT | 27.04.2022 | NL | 27.04.2022 | PL | 27.04.2022 | RO | 27.04.2022 | RS | 27.04.2022 | SE | 27.04.2022 | SI | 27.04.2022 | SK | 27.04.2022 | SM | 27.04.2022 | BG | 27.07.2022 | NO | 27.07.2022 | GR | 28.07.2022 | IS | 27.08.2022 | PT | 29.08.2022 | GB | 24.09.2022 | IE | 24.09.2022 | LU | 24.09.2022 | BE | 30.09.2022 | CH | 30.09.2022 | FR | 30.09.2022 | LI | 30.09.2022 | [2024/41] |
Former [2024/27] | HU | 24.09.2015 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
MK | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
GB | 24.09.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2024/21] | HU | 24.09.2015 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CY | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
GB | 24.09.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2024/18] | HU | 24.09.2015 | |
AL | 27.04.2022 | ||
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
GB | 24.09.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2024/11] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
IT | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
GB | 24.09.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2023/47] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
GB | 24.09.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2023/42] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
BE | 30.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2023/35] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
CH | 30.09.2022 | ||
FR | 30.09.2022 | ||
LI | 30.09.2022 | ||
Former [2023/33] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
IE | 24.09.2022 | ||
LU | 24.09.2022 | ||
Former [2023/30] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
LU | 24.09.2022 | ||
Former [2023/25] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SI | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/22] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
MC | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/17] | AL | 27.04.2022 | |
AT | 27.04.2022 | ||
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/09] | AT | 27.04.2022 | |
CZ | 27.04.2022 | ||
DK | 27.04.2022 | ||
EE | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RO | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
SK | 27.04.2022 | ||
SM | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2023/07] | AT | 27.04.2022 | |
DK | 27.04.2022 | ||
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/51] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
IS | 27.08.2022 | ||
PT | 29.08.2022 | ||
Former [2022/50] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
PL | 27.04.2022 | ||
RS | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/49] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
HR | 27.04.2022 | ||
LT | 27.04.2022 | ||
LV | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
BG | 27.07.2022 | ||
NO | 27.07.2022 | ||
GR | 28.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/47] | AT | 27.04.2022 | |
ES | 27.04.2022 | ||
FI | 27.04.2022 | ||
LT | 27.04.2022 | ||
NL | 27.04.2022 | ||
SE | 27.04.2022 | ||
NO | 27.07.2022 | ||
PT | 29.08.2022 | ||
Former [2022/44] | NL | 27.04.2022 | Documents cited: | Search | [Y]US8868796 (WOJCIK JAMES JOHN [US], et al) [Y] 3-7,11-14 * figure 6 * * column 18, line 1 - line 9 *; | [Y] - Anonymous, "arm - Can I disable Interrupts on a BBB for a short duration (0.5ms)? - Stack Overflow", (20150331), URL: https://stackoverflow.com/questions/29161359/can-i-disable-interrupts-on-a-bbb-for-a-short-duration-0-5ms, (20171124), XP055428567 [Y] 1-15 * page 1 * | [Y] - Anonymous, "Bit Banging", (19991231), URL: http://www.ganssle.com/articles/auart.htm, (20171124), XP055428758 [Y] 1-15 * the whole document * | [A] - Anonymous, "Use of noInterrupts causes port to close . Issue #654 . esp8266/Arduino . GitHub", (20150804), URL: https://github.com/esp8266/Arduino/issues/654, (20171124), XP055428568 [A] 1-15 * the whole document * | International search | [A]CN101499053 (SHANGHAI CHIPSWINNER ELECTRONI [CN]) [A] 1-10* , description, page 5, line 4 to page 10, line 1 and page 12, line 21 to page 13, line 20, and figures 1-4 and 8 *; | [X]CN102880576 (SHENZHEN HUAXU SCIENCE AND TECHNOLOGY DEV CO LTD) [X] 1-2, 5-7, 10 * , description, paragraphs [0010]-[0014], and figures 1 and 2 *; | [X]CN103268248 (XIAMEN YAXON NETWORKS CO LTD) [X] 1-2, 5-7, 10 * , description, paragraphs [0012]-[0064], and figures 1-3 *; | [X] - ZHENG, ZHIXIONG et al., "Full Duplex UART Software Simulation Based on LPC1768", MICROCONTROLLERS & EMBEDDED SYSTEMS, (20130630), ISSN 1009-623X, XP008185722 [X] 1-2, 5-7, 10 * , Introduction-2.4, Design of Transmitting/Receiving Buffer * |