blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3335809

EP3335809 - METHOD FOR EFFECTIVELY UTILIZING ENERGY IN WASTE-INCINERATION FACILITY WITH ETHANOL PRODUCTION EQUIPMENT [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  03.04.2021
Database last updated on 01.10.2024
FormerThe patent has been granted
Status updated on  24.04.2020
FormerGrant of patent is intended
Status updated on  07.01.2020
FormerRequest for examination was made
Status updated on  18.05.2018
FormerThe international publication has been made
Status updated on  18.02.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Hitachi Zosen Corporation
7-89, Nanko-kita 1-chome Suminoe-ku
Osaka-shi, Osaka 559-8559 / JP
[2018/25]
Inventor(s)01 / SERA, Yutaka
c/o HITACHI ZOSEN CORPORATION
7-89 Nanko-kita 1-chome
Suminoe-ku
Osaka-shi Osaka 559-8559 / JP
02 / TOMIYAMA, Shigeo
c/o HITACHI ZOSEN CORPORATION
7-89 Nanko-kita 1-chome
Suminoe-ku
Osaka-shi Osaka 559-8559 / JP
03 / NAKAMORI, Ken-ichi
c/o HITACHI ZOSEN CORPORATION
7-89 Nanko-kita 1-chome
Suminoe-ku
Osaka-shi Osaka 559-8559 / JP
 [2018/25]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2018/25]
Application number, filing date15900981.010.08.2015
[2018/25]
WO2015JP72628
Filing languageJA
Procedural languageEN
PublicationType: A1 Application with search report
No.:WO2017026027
Date:16.02.2017
Language:JA
[2017/07]
Type: A1 Application with search report 
No.:EP3335809
Date:20.06.2018
Language:EN
[2018/25]
Type: B1 Patent specification 
No.:EP3335809
Date:27.05.2020
Language:EN
[2020/22]
Search report(s)International search report - published on:JP16.02.2017
(Supplementary) European search report - dispatched on:EP27.02.2019
ClassificationIPC:B09B3/00, A61L2/04, A61L11/00, C01B3/22, C01B3/38, C12P7/06, B09B5/00
[2019/13]
CPC:
A61L2/04 (EP); B09B3/60 (US); A61L11/00 (EP);
B09B3/40 (EP); B09B5/00 (EP); C01B3/22 (EP);
C01B3/38 (EP); C12P7/06 (EP); Y02E20/12 (EP);
Y02E50/10 (EP); Y02E50/30 (EP); Y02P20/129 (EP);
Y02W10/30 (EP); Y02W10/40 (EP); Y02W30/20 (EP) (-)
Former IPC [2018/25]B09B3/00, A61L2/04, A61L11/00, C01B3/22, C01B3/38, C12P7/06
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/25]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
TitleGerman:VERFAHREN ZUR EFFEKTIVEN NUTZUNG VON ENERGIE IN EINER MÜLLVERBRENNUNGSANLAGE MIT ETHANOLHERSTELLUNGSAUSRÜSTUNG[2018/25]
English:METHOD FOR EFFECTIVELY UTILIZING ENERGY IN WASTE-INCINERATION FACILITY WITH ETHANOL PRODUCTION EQUIPMENT[2018/25]
French:PROCÉDÉ PERMETTANT D'UTILISER EFFICACEMENT L'ÉNERGIE DANS UNE INSTALLATION D'INCINÉRATION DE DÉCHETS AVEC UN ÉQUIPEMENT DE PRODUCTION D'ÉTHANOL[2018/25]
Entry into regional phase26.02.2018Translation filed 
26.02.2018National basic fee paid 
26.02.2018Search fee paid 
26.02.2018Designation fee(s) paid 
26.02.2018Examination fee paid 
Examination procedure26.02.2018Examination requested  [2018/25]
26.02.2018Date on which the examining division has become responsible
28.06.2019Amendment by applicant (claims and/or description)
08.01.2020Communication of intention to grant the patent
21.04.2020Fee for grant paid
21.04.2020Fee for publishing/printing paid
21.04.2020Receipt of the translation of the claim(s)
Opposition(s)02.03.2021No opposition filed within time limit [2021/18]
Fees paidRenewal fee
26.02.2018Renewal fee patent year 03
28.08.2018Renewal fee patent year 04
27.08.2019Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU10.08.2015
AL27.05.2020
AT27.05.2020
CY27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
MK27.05.2020
MT27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
TR27.05.2020
IE10.08.2020
LU10.08.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
IS27.09.2020
PT28.09.2020
[2022/32]
Former [2022/27]HU10.08.2015
AL27.05.2020
AT27.05.2020
CY27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
MT27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
TR27.05.2020
IE10.08.2020
LU10.08.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/37]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
IE10.08.2020
LU10.08.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/36]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
LU10.08.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
BE31.08.2020
CH31.08.2020
LI31.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/24]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SI27.05.2020
SK27.05.2020
SM27.05.2020
LU10.08.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
CH31.08.2020
LI31.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/20]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SK27.05.2020
SM27.05.2020
LU10.08.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
CH31.08.2020
LI31.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/18]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
MC27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/10]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
PL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SK27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/09]AL27.05.2020
AT27.05.2020
CZ27.05.2020
DK27.05.2020
EE27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
IT27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/08]AL27.05.2020
DK27.05.2020
ES27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RO27.05.2020
RS27.05.2020
SE27.05.2020
SM27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/04]AL27.05.2020
FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
NL27.05.2020
RS27.05.2020
SE27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2021/01]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
RS27.05.2020
SE27.05.2020
BG27.08.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/51]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
RS27.05.2020
SE27.05.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/50]FI27.05.2020
HR27.05.2020
LT27.05.2020
LV27.05.2020
SE27.05.2020
NO27.08.2020
GR28.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/48]FI27.05.2020
LT27.05.2020
SE27.05.2020
NO27.08.2020
IS27.09.2020
PT28.09.2020
Former [2020/47]LT27.05.2020
NO27.08.2020
IS27.09.2020
Former [2020/46]IS27.09.2020
Documents cited:Search[YA]JP2005211805  (HITACHI KIDEN KOGYO KK) [Y] 1 * abstract * [A] 2-10;
 [YA]WO2007005954  (PURDUE RESEARCH FOUNDATION [US], et al) [Y] 1 * paragraph [0093]; figures 1-3; claims 5,11,19,20 * [A] 2-10;
 [YA]JP2008104452  (UNIV KUMAMOTO) [Y] 1 * abstract *[A] 2-10;
 [YA]US2010105127  (GINSBURG MARTIN A [US]) [Y] 1 * paragraph [0032]; claims 1,6,14,21 * [A] 2-10
International search[A]JPS5326768  (MITSUBISHI HEAVY IND LTD) [A] 1-10 * , claims 1 to 5; page 1, lower right column, lines 7 to 11; page 2, upper right column, line 6 to page 4, lower right column, line 3; page 5, upper right column, line 11 to lower right column, line 18; drawings (Family: none) *;
 [A]JPS5333867  (MITSUBISHI HEAVY IND LTD) [A] 1-10 * , claims; page 1, lower left column, lines 12 to 14; page 2, upper right column, line 17 to page 5, lower left column, line 5; drawings (Family: none) *;
 [A]JP2006325577  (UNIV KUMAMOTO, et al) [A] 1-10 * , claims 1 to 3, 15, 20, 21; paragraphs [0001], [0010], [0012] to [0021], [0029], [0032] to [0061], [0075] to [0100]; fig. 1, 2 (Family: none) *;
 [A]EP1829821  (ENEA ENTE NUOVE TEC [IT], et al) [A] 9, 10* , claims 1, 2, 10, 12 to 14; paragraphs [0001], [0025] to [0027], [0041] to [0061]; fig. 3, 7 & IT RM20060102 A1 *;
 [A]JP2008104452  (UNIV KUMAMOTO) [A] 1-10 * , claims 13, 18 to 20; paragraphs [0001], [0008] to [0010], [0014] to [0016], [0019], [0025] to [0038], [0042] to [0067]; fig. 1, 2 (Family: none) *;
 [A]WO2010146243  (VALTION TEKNILLINEN [FI], et al) [A] 1-10 * , claims 1 to 4, 10; page 1, lines 4 to 7; page 2, line 15 to page 6, line 9; page 8, line 31 to page 10, line 17; page 12, lines 1 to 16; page 13, line 21 to page 18, line 18; page 20, lines 8 to 24; fig. 1 & EP 2443243 A1 & FI 20095691 A *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.