EP3379872 - METHODS AND APPARATUSES FOR TRANSMITTING DOWNLINK DATA NOTIFICATION MESSAGE [Right-click to bookmark this link] | |||
Former [2018/39] | METHOD AND APPARATUS FOR TRANSMITTING DOWNLINK DATA NOTIFICATION MESSAGE | ||
[2022/29] | Status | No opposition filed within time limit Status updated on 01.12.2023 Database last updated on 06.11.2024 | |
Former | The patent has been granted Status updated on 23.12.2022 | ||
Former | Grant of patent is intended Status updated on 03.07.2022 | ||
Former | Examination is in progress Status updated on 05.03.2021 | ||
Former | Request for examination was made Status updated on 24.08.2018 | ||
Former | The international publication has been made Status updated on 23.06.2017 | Most recent event Tooltip | 30.08.2024 | Lapse of the patent in a contracting state New state(s): MC | published on 02.10.2024 [2024/40] | Applicant(s) | For all designated states Huawei Technologies Co., Ltd. Huawei Administration Building Bantian Longgang District Shenzhen, Guangdong 518129 / CN | [2018/39] | Inventor(s) | 01 /
CAO, Longyu Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 02 /
SHU, Lin Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | 03 /
ZHANG, Yanping Huawei Administration Building Bantian Longgang District Shenzhen Guangdong 518129 / CN | [2018/39] | Representative(s) | Pfenning, Meinig & Partner mbB Patent- und Rechtsanwälte Theresienhöhe 11a 80339 München / DE | [2018/39] | Application number, filing date | 15910548.5 | 17.12.2015 | [2018/39] | WO2015CN97733 | Filing language | ZH | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | WO2017101076 | Date: | 22.06.2017 | Language: | ZH | [2017/25] | Type: | A1 Application with search report | No.: | EP3379872 | Date: | 26.09.2018 | Language: | EN | [2018/39] | Type: | B1 Patent specification | No.: | EP3379872 | Date: | 25.01.2023 | Language: | EN | [2023/04] | Search report(s) | International search report - published on: | CN | 22.06.2017 | (Supplementary) European search report - dispatched on: | EP | 11.09.2018 | Classification | IPC: | H04W68/00 | [2018/39] | CPC: |
H04W68/00 (EP,US);
H04W68/005 (KR,RU,US);
H04W24/10 (KR,RU,US);
H04W40/246 (RU,US);
H04W40/248 (US);
H04W68/04 (US);
H04W8/08 (RU,US)
(-)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/39] | Extension states | BA | Not yet paid | ME | Not yet paid | Validation states | MA | Not yet paid | MD | Not yet paid | Title | German: | VERFAHREN UND VORRICHTUNGEN ZUM SENDEN EINER DOWNLINK-DATENMITTEILUNGSNACHRICHT | [2022/29] | English: | METHODS AND APPARATUSES FOR TRANSMITTING DOWNLINK DATA NOTIFICATION MESSAGE | [2022/29] | French: | PROCÉDÉS ET APPAREILS DE TRANSMISSION DE MESSAGE DE NOTIFICATION DE DONNÉES DE LIAISON DESCENDANTE | [2022/29] |
Former [2018/39] | VERFAHREN UND VORRICHTUNG ZUM SENDEN EINER DOWNLINK-DATENMITTEILUNGSNACHRICHT | ||
Former [2018/39] | METHOD AND APPARATUS FOR TRANSMITTING DOWNLINK DATA NOTIFICATION MESSAGE | ||
Former [2018/39] | PROCÉDÉ ET APPAREIL DE TRANSMISSION DE MESSAGE DE NOTIFICATION DE DONNÉES DE LIAISON DESCENDANTE | Entry into regional phase | 18.06.2018 | Translation filed | 18.06.2018 | National basic fee paid | 18.06.2018 | Search fee paid | 18.06.2018 | Designation fee(s) paid | 18.06.2018 | Examination fee paid | Examination procedure | 18.06.2018 | Examination requested [2018/39] | 18.06.2018 | Date on which the examining division has become responsible | 04.04.2019 | Amendment by applicant (claims and/or description) | 10.03.2021 | Despatch of a communication from the examining division (Time limit: M04) | 19.07.2021 | Reply to a communication from the examining division | 16.05.2022 | Cancellation of oral proceeding that was planned for 17.05.2022 | 17.05.2022 | Date of oral proceedings (cancelled) | 04.07.2022 | Communication of intention to grant the patent | 08.09.2022 | Fee for grant paid | 08.09.2022 | Fee for publishing/printing paid | 11.11.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 26.10.2023 | No opposition filed within time limit [2024/01] | Fees paid | Renewal fee | 18.06.2018 | Renewal fee patent year 03 | 31.12.2018 | Renewal fee patent year 04 | 20.12.2019 | Renewal fee patent year 05 | 23.12.2020 | Renewal fee patent year 06 | 27.12.2021 | Renewal fee patent year 07 | 20.12.2022 | Renewal fee patent year 08 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | AT | 25.01.2023 | CZ | 25.01.2023 | DK | 25.01.2023 | EE | 25.01.2023 | ES | 25.01.2023 | FI | 25.01.2023 | HR | 25.01.2023 | IT | 25.01.2023 | LT | 25.01.2023 | LV | 25.01.2023 | MC | 25.01.2023 | NL | 25.01.2023 | PL | 25.01.2023 | RO | 25.01.2023 | RS | 25.01.2023 | SE | 25.01.2023 | SI | 25.01.2023 | SK | 25.01.2023 | SM | 25.01.2023 | NO | 25.04.2023 | GR | 26.04.2023 | IS | 25.05.2023 | PT | 25.05.2023 | [2024/40] |
Former [2024/26] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
IT | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2024/11] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SI | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/50] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SK | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/49] | AT | 25.01.2023 | |
CZ | 25.01.2023 | ||
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RO | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/48] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
EE | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/46] | AT | 25.01.2023 | |
DK | 25.01.2023 | ||
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
SM | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/39] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
IS | 25.05.2023 | ||
PT | 25.05.2023 | ||
Former [2023/38] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
PL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/37] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
GR | 26.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/36] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
FI | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
LV | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
SE | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/35] | AT | 25.01.2023 | |
ES | 25.01.2023 | ||
HR | 25.01.2023 | ||
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
NO | 25.04.2023 | ||
PT | 25.05.2023 | ||
Former [2023/34] | ES | 25.01.2023 | |
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
RS | 25.01.2023 | ||
PT | 25.05.2023 | ||
Former [2023/33] | ES | 25.01.2023 | |
LT | 25.01.2023 | ||
NL | 25.01.2023 | ||
Former [2023/31] | NL | 25.01.2023 | Documents cited: | Search | [A]WO2007079689 (ZTE CORP [CN], et al) [A] 1-14* paragraphs [0033] , [0034] , [0046] - [0052] *; | [XI] - NOKIA NETWORKS ET AL, "Paging priority setting in the MME", vol. SA WG2, no. Sorrento, Italy; 20150126 - 20150130, (20150304), 3GPP DRAFT; 23401_CR2812R2_TEI12 SAES_(REL-13)_S2-150549_REL-13-MIRROR-S2-150328-PAGINGPRIORITY-REL12_REV2 - COPY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/SA/Docs/, (20150304), XP050940312 [X] 1,2,6,9,10,14 * chapters "Reason for change", 5.3.4.3 * [I] 3-5,7,8,11-13 | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS) enhancements for Evolved Universal Terrestrial Radio Access Network (E-UTRAN) access (Release 13)", 3GPP STANDARD; 3GPP TS 23.401, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20151215), vol. SA WG2, no. V13.5.0, pages 1 - 337, XP051046483 [A] 1-14 * chapters 4.3.7.1 and 4.3.7.1-4.3.7.4.1a * | [A] - "3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS); Service description; Stage 2 (Release 12)", 3GPP STANDARD ; TECHNICAL SPECIFICATION ; 3GPP TS 23.060, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, (20151215), vol. SA WG2, no. V12.11.0, pages 1 - 351, XP051294432 [A] 1-14 * chapter 5.3.6.5 * | [A] - "3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; 3GPP Evolved Packet System (EPS); Evolved General Packet Radio Service (GPRS) Tunnelling Protocol for Control plane (GTPv2-C); Stage 3 (Release 13)", (20151216), 3GPP DRAFT; 29274-D40, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ct/WG4_protocollars_ex-CN4/TSGCT4_71ah_Nashville/Draft_Specs_after_CT70/, (20151216), XP051062917 [A] 1-14 * chapters 7.2.11-7.2.11.2 * | International search | [A]WO2010127609 (ZTE CORP [CN], et al) [A] 1-30* , the whole document *; | [A]CN102769932 (HUAWEI TECH CO LTD) [A] 1-30 * , the whole document *; | [A]CN103546968 (DATANG MOBILE TECHNOLOGIES CO) [A] 1-30 * , description, paragraphs [0075]-[0088], and figures 3-4 *; | [A]CN103581888 (CHINA ACADEMY OF TELECOMM TECH) [A] 1-30 * , the whole document * |