blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3081810

EP3081810 - PUMP FOR AN SCR SYSTEM IN VEHICLES [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  16.12.2022
Database last updated on 02.11.2024
FormerThe patent has been granted
Status updated on  07.01.2022
FormerGrant of patent is intended
Status updated on  26.05.2021
FormerRequest for examination was made
Status updated on  28.04.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Niethammer, Bernd
Weitbrechtweg 1
78126 Königsfeld / DE
[2016/42]
Inventor(s)01 / Niethammer, Bernd
Weitbrechtweg 1
78126 Königsfeld / DE
 [2016/42]
Representative(s)Kohl, Karl-Heinz
Jackisch-Kohl und Kohl
Stuttgarter Straße 115
70469 Stuttgart / DE
[2016/42]
Application number, filing date16000772.005.04.2016
[2016/42]
Priority number, dateDE2015100486813.04.2015         Original published format: DE102015004868
[2016/42]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3081810
Date:19.10.2016
Language:DE
[2016/42]
Type: B1 Patent specification 
No.:EP3081810
Date:09.02.2022
Language:DE
[2022/06]
Search report(s)(Supplementary) European search report - dispatched on:EP20.09.2016
ClassificationIPC:F04B9/04, F01N3/20, F04B43/08, F04B17/03
[2016/42]
CPC:
F01N3/2066 (EP,US); F04B43/084 (EP,CN,US); F04B49/16 (US);
F01N3/206 (CN); F04B13/00 (CN); F04B19/22 (US);
F04B43/08 (EP,US); F04B43/086 (CN); F04B53/14 (US);
F04B53/16 (US); F04B9/045 (EP,CN,US); F01N2570/14 (CN);
F01N2610/02 (EP,CN,US); F01N2610/1433 (EP,CN,US); F04B17/03 (EP,US);
Y02A50/20 (EP,US); Y02T10/12 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/22]
Former [2016/42]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PUMPE FÜR EIN SCR-SYSTEM IN FAHRZEUGEN[2016/42]
English:PUMP FOR AN SCR SYSTEM IN VEHICLES[2016/42]
French:POMPE POUR UN SYSTEME SCR DE VEHICULES AUTOMOBILES[2016/42]
Examination procedure05.04.2016Date on which the examining division has become responsible
19.04.2017Amendment by applicant (claims and/or description)
19.04.2017Examination requested  [2017/22]
27.05.2021Communication of intention to grant the patent
06.10.2021Fee for grant paid
06.10.2021Fee for publishing/printing paid
12.11.2021Despatch of communication that the application is deemed to be withdrawn, reason: fee for grant / fee for printing not paid in time
29.12.2021Receipt of the translation of the claim(s)
Opposition(s)10.11.2022No opposition filed within time limit [2023/03]
Request for further processing for:The application is deemed to be withdrawn due to failure to fulfill actions required for granting the patent
03.01.2022Request for further processing filed
03.01.2022Full payment received (date of receipt of payment)
Request granted
10.01.2022Decision despatched
Fees paidRenewal fee
30.04.2018Renewal fee patent year 03
30.04.2019Renewal fee patent year 04
30.04.2020Renewal fee patent year 05
30.04.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.04.2016
AL09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
MK09.02.2022
MT09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
AT05.04.2022
IE05.04.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
GB09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
[2024/41]
Former [2024/22]HU05.04.2016
AL09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
MK09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
AT05.04.2022
IE05.04.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
GB09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2024/20]HU05.04.2016
AL09.02.2022
CY09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
AT05.04.2022
IE05.04.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
GB09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2024/18]HU05.04.2016
AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
AT05.04.2022
IE05.04.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
GB09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/35]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
IT09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
AT05.04.2022
IE05.04.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
GB09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/27]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
IE05.04.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
GB09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/20]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
IE05.04.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/10]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SI09.02.2022
SK09.02.2022
SM09.02.2022
LU05.04.2022
FR09.04.2022
BE30.04.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/09]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
LU05.04.2022
FR09.04.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/08]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
LU05.04.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/06]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
MC09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2023/01]AL09.02.2022
CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/49]CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SK09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/48]CZ09.02.2022
DK09.02.2022
EE09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/47]DK09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RO09.02.2022
RS09.02.2022
SE09.02.2022
SM09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/46]DK09.02.2022
ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/42]ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
IS09.06.2022
PT09.06.2022
Former [2022/39]ES09.02.2022
FI09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
PT09.06.2022
Former [2022/36]ES09.02.2022
HR09.02.2022
LT09.02.2022
LV09.02.2022
NL09.02.2022
PL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
GR10.05.2022
PT09.06.2022
Former [2022/35]ES09.02.2022
HR09.02.2022
LT09.02.2022
NL09.02.2022
RS09.02.2022
SE09.02.2022
BG09.05.2022
NO09.05.2022
PT09.06.2022
Former [2022/34]ES09.02.2022
LT09.02.2022
NL09.02.2022
NO09.05.2022
PT09.06.2022
Former [2022/33]LT09.02.2022
NO09.05.2022
Documents cited:Search[XI]US1330919  (SNELL LYLE K) [X] 1-3,6,7,12 * page 1, line 73 - page 2, line 90; figures 3,5 * [I] 4,5,8-11,13-15;
 [XI]US1557878  (REEVES DONALD H) [X] 1-3,5-8,10,12 * page 2, line 5 - line 106; figure 2 * [I] 4,9,11,13-15;
 [X]US2008008605  (BAUER PHILIPPE [FR], et al) [X] 1,8,11,12* paragraphs [0022] - [0042]; figures 1-5 *;
 [X]WO2009075581  (OTTESTAD BREATHING SYST AS [NO], et al) [X] 1,6,7,12 * page 2, line 25 - page 3, line 33; figures 1,2 * * page 5, line 11 - line 28; figure 5 *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.