EP3176922 - ROTOR FOR A SLIP RING MOTOR AND SLIP RING MOTOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 06.05.2022 Database last updated on 26.07.2024 | |
Former | The patent has been granted Status updated on 28.05.2021 | ||
Former | Grant of patent is intended Status updated on 04.02.2021 | ||
Former | Examination is in progress Status updated on 03.09.2019 | ||
Former | Request for examination was made Status updated on 08.12.2017 | ||
Former | The application has been published Status updated on 15.06.2017 | Most recent event Tooltip | 14.06.2024 | Lapse of the patent in a contracting state New state(s): TR | published on 17.07.2024 [2024/29] | Applicant(s) | For all designated states Linde GmbH Dr.-Carl-von-Linde-Straße 6-14 82049 Pullach / DE | For all designated states Weg Equipamentos Electricos S.A. Av. Prefeito Waldemar Grubba 3000 Vila Lalau 89256-900 Jaragua do Sul - SC / BR | [2020/25] |
Former [2017/23] | For all designated states Linde Aktiengesellschaft Klosterhofstrasse 1 80331 München / DE | ||
For all designated states Weg Equipamentos Electricos S.A. Av. Prefeito Waldemar Grubba 3000 Vila Lalau 89256-900 Jaragua do Sul - SC / BR | Inventor(s) | 01 /
Posselt, Heinz Krankenhausstraße 6 83043 Bad Aibling / DE | 02 /
Kleis, Marco Föhrenweg 29 83064 Raubling / DE | 03 /
Pinter, Cesar Luis Street Clemente Schiochetti, n°193, Jaraguá Esquerd Santa Catarina 89253425 Jaraguá, do Sul / BR | [2017/23] | Representative(s) | Imhof, Dietmar Linde GmbH Intellectual Property EMEA Dr.-Carl-von-Linde-Straße 6-14 82049 Pullach / DE | [2021/26] |
Former [2017/23] | Imhof, Dietmar Linde AG Legal Services Intellectual Property Dr.-Carl-von-Linde-Straße 6-14 82049 Pullach / DE | Application number, filing date | 16002464.2 | 18.11.2016 | [2017/23] | Priority number, date | DE20151015679 | 03.12.2015 Original published format: DE102015015679 | [2017/23] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3176922 | Date: | 07.06.2017 | Language: | EN | [2017/23] | Type: | B1 Patent specification | No.: | EP3176922 | Date: | 30.06.2021 | Language: | EN | [2021/26] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 02.05.2017 | Classification | IPC: | H02K13/02 | [2017/23] | CPC: |
H02K13/02 (EP,US);
H02K3/51 (CN);
H02K17/02 (US);
H02K1/22 (US);
H02K13/003 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2018/02] |
Former [2017/23] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | ROTOR FÜR EINEN SCHLEIFRINGMOTOR UND SCHLEIFRINGMOTOR | [2017/23] | English: | ROTOR FOR A SLIP RING MOTOR AND SLIP RING MOTOR | [2017/23] | French: | ROTOR POUR UN MOTEUR À BAGUE DE GLISSEMENT ET MOTEUR À BAGUE DE GLISSEMENT | [2017/23] | Examination procedure | 18.11.2016 | Date on which the examining division has become responsible | 05.12.2017 | Amendment by applicant (claims and/or description) | 05.12.2017 | Examination requested [2018/02] | 06.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 13.01.2020 | Reply to a communication from the examining division | 16.06.2020 | Despatch of a communication from the examining division (Time limit: M04) | 14.10.2020 | Reply to a communication from the examining division | 05.02.2021 | Communication of intention to grant the patent | 25.05.2021 | Fee for grant paid | 25.05.2021 | Fee for publishing/printing paid | 25.05.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 31.03.2022 | No opposition filed within time limit [2022/23] | Fees paid | Renewal fee | 14.11.2018 | Renewal fee patent year 03 | 21.11.2019 | Renewal fee patent year 04 | 19.11.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 18.11.2016 | AL | 30.06.2021 | CY | 30.06.2021 | DK | 30.06.2021 | EE | 30.06.2021 | ES | 30.06.2021 | FI | 30.06.2021 | GR | 30.06.2021 | HR | 30.06.2021 | LT | 30.06.2021 | LV | 30.06.2021 | MC | 30.06.2021 | MK | 30.06.2021 | NL | 30.06.2021 | RO | 30.06.2021 | RS | 30.06.2021 | SE | 30.06.2021 | SI | 30.06.2021 | SK | 30.06.2021 | SM | 30.06.2021 | TR | 30.06.2021 | BG | 30.09.2021 | NO | 30.09.2021 | IS | 30.10.2021 | PT | 02.11.2021 | IE | 18.11.2021 | LU | 18.11.2021 | BE | 30.11.2021 | [2024/29] |
Former [2024/22] | HU | 18.11.2016 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
GR | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
MK | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 18.11.2021 | ||
LU | 18.11.2021 | ||
BE | 30.11.2021 | ||
Former [2023/36] | HU | 18.11.2016 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
GR | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 18.11.2021 | ||
LU | 18.11.2021 | ||
BE | 30.11.2021 | ||
Former [2023/30] | HU | 18.11.2016 | |
AL | 30.06.2021 | ||
CY | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 18.11.2021 | ||
LU | 18.11.2021 | ||
BE | 30.11.2021 | ||
Former [2023/29] | HU | 18.11.2016 | |
AL | 30.06.2021 | ||
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 18.11.2021 | ||
LU | 18.11.2021 | ||
BE | 30.11.2021 | ||
Former [2023/19] | AL | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LT | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 18.11.2021 | ||
LU | 18.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/48] | AL | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
IE | 18.11.2021 | ||
LU | 18.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/34] | AL | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
LU | 18.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/33] | AL | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
MC | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
BE | 30.11.2021 | ||
Former [2022/29] | AL | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SI | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/26] | AL | 30.06.2021 | |
DK | 30.06.2021 | ||
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/21] | DK | 30.06.2021 | |
EE | 30.06.2021 | ||
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/10] | EE | 30.06.2021 | |
ES | 30.06.2021 | ||
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RO | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SK | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
IS | 30.10.2021 | ||
PT | 02.11.2021 | ||
Former [2022/08] | ES | 30.06.2021 | |
FI | 30.06.2021 | ||
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
Former [2022/07] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
NL | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
SM | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
Former [2021/51] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
RS | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
Former [2021/49] | FI | 30.06.2021 | |
HR | 30.06.2021 | ||
LV | 30.06.2021 | ||
SE | 30.06.2021 | ||
BG | 30.09.2021 | ||
NO | 30.09.2021 | ||
Former [2021/47] | FI | 30.06.2021 | |
BG | 30.09.2021 | ||
Former [2021/46] | FI | 30.06.2021 | Documents cited: | Search | [A]JPS4934081B (HITACHI LTD.) [A] 1-15* figures 1, 2 *; | [A]JPS4936727B (MITSUBISHI ELECTRIC CORPORATION) [A] 1-15 * figures 1, 2 *; | [A]JPS55125048 (TOKYO SHIBAURA ELECTRIC CO) [A] 1 * abstract * * figure 1 *; | [A]JPH01116567U (TOSHIBA CORPORATION) [A] 1-15 * figures 1-3 *; | [XI]DE10244746 (SIEMENS AG [DE]) [X] 1-3,15 * paragraphs [0011] , [ 0012] * * paragraphs [0015] , [ 0016] , [ 0018] * * paragraph [0026] - paragraph [0028] * * figures 1-3 * [I] 4-14 |