Extract from the Register of European Patents

EP About this file: EP3051258

EP3051258 - DETERMINATION OF A ROUTE USING A FIRST AND A SECOND NAVIGATION DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  08.04.2022
Database last updated on 09.04.2026
FormerThe patent has been granted
Status updated on  30.04.2021
FormerGrant of patent is intended
Status updated on  22.12.2020
FormerExamination is in progress
Status updated on  16.06.2017
FormerRequest for examination was made
Status updated on  10.02.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
JOYNEXT GmbH
Gewerbepark Merbitz 5
01156 Dresden / DE
[2020/39]
Former [2016/39]For all designated states
Preh Car Connect GmbH
Gewerbepark Merbitz Nr. 5
01156 Dresden / DE
Former [2016/31]For all designated states
TechniSat Digital GmbH
Gewerbepark Merbitz Nr. 5
01156 Dresden / DE
Inventor(s)01 / Porstmann, Frank
Am Brunnen 4
01705 Freital / DE
02 / Ulbricht, Dirk
Prießnitzstr. 27
01099 Dresden / DE
03 / Kahlenbach, Andreas
Malterstr. 33
01159 Dresden / DE
04 / Lietz, Holger
Wittenberger Str. 10
09126 Chemnitz / DE
 [2016/31]
Application number, filing date16020021.829.01.2016
[2016/31]
Priority number, dateDE2015100146930.01.2015         Original published format: DE102015001469
[2016/31]
Filing languageDE
Procedural languageDE
PublicationType: A2 Application without search report 
No.:EP3051258
Date:03.08.2016
Language:DE
[2016/31]
Type: A3 Search report 
No.:EP3051258
Date:10.08.2016
Language:DE
[2016/32]
Type: B1 Patent specification 
No.:EP3051258
Date:02.06.2021
Language:DE
[2021/22]
Search report(s)(Supplementary) European search report - dispatched on:EP08.07.2016
ClassificationIPC:G01C21/34
[2016/31]
CPC:
G01C21/3438 (EP)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/11]
Former [2016/31]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:BESTIMMEN EINER ROUTE UNTER VERWENDUNG EINER ERSTEN NAVIGATIONSEINRICHTUNG UND EINER ZWEITEN NAVIGATIONSEINRICHTUNG[2016/31]
English:DETERMINATION OF A ROUTE USING A FIRST AND A SECOND NAVIGATION DEVICE[2016/31]
French:DÉTERMINATION D'UN ITINÉRAIRE À L'AIDE D'UN PREMIER SYSTÈME DE NAVIGATION ET D'UN SECOND SYSTÈME DE NAVIGATION[2021/03]
Former [2016/31]DETERMINATION D'UN ITINERAIRE A L'AIDE D'UN PREMIER SYSTEME DE NAVIGATION ET D'UN SECOND SYSTEME DE NAVIGATION
Examination procedure29.01.2016Date on which the examining division has become responsible
06.02.2017Examination requested  [2017/11]
10.02.2017Amendment by applicant (claims and/or description)
19.06.2017Despatch of a communication from the examining division (Time limit: M06)
22.12.2017Reply to a communication from the examining division
25.11.2019Despatch of a communication from the examining division (Time limit: M04)
25.03.2020Reply to a communication from the examining division
23.12.2020Communication of intention to grant the patent
12.04.2021Fee for grant paid
12.04.2021Fee for publishing/printing paid
23.04.2021Receipt of the translation of the claim(s)
Opposition(s)03.03.2022No opposition filed within time limit [2022/19]
Fees paidRenewal fee
01.02.2018Renewal fee patent year 03
28.01.2019Renewal fee patent year 04
02.03.2020Renewal fee patent year 05
18.01.2021Renewal fee patent year 06
Penalty fee
Additional fee for renewal fee
31.01.201803   M06   Fee paid on   22.02.2018
31.01.202005   M06   Fee paid on   30.03.2020
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU29.01.2016
AL02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
MT02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
TR02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
AT29.01.2022
GB29.01.2022
IE29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
[2024/41]
Former [2024/29]HU29.01.2016
AL02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
TR02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
AT29.01.2022
GB29.01.2022
IE29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
Former [2024/22]HU29.01.2016
AL02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
MK02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
AT29.01.2022
GB29.01.2022
IE29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
Former [2024/20]HU29.01.2016
AL02.06.2021
CY02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
AT29.01.2022
GB29.01.2022
IE29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
Former [2024/18]HU29.01.2016
AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
AT29.01.2022
GB29.01.2022
IE29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
Former [2023/22]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
AT29.01.2022
GB29.01.2022
IE29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
Former [2023/09]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
GB29.01.2022
IE29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
Former [2023/03]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
GB29.01.2022
LU29.01.2022
BE31.01.2022
CH31.01.2022
FR31.01.2022
LI31.01.2022
Former [2023/01]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
GB29.01.2022
LU29.01.2022
BE31.01.2022
FR31.01.2022
Former [2022/50]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
GB29.01.2022
LU29.01.2022
FR31.01.2022
Former [2022/47]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
GB29.01.2022
LU29.01.2022
Former [2022/46]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
LU29.01.2022
Former [2022/39]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
MC02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/36]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
IT02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/29]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SI02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/26]AL02.06.2021
CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/21]CZ02.06.2021
DK02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/10]CZ02.06.2021
EE02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
IS02.10.2021
PT04.10.2021
Former [2022/09]CZ02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RO02.06.2021
RS02.06.2021
SE02.06.2021
SK02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
PT04.10.2021
Former [2022/08]CZ02.06.2021
ES02.06.2021
FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2022/07]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
NL02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
SM02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/52]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
PL02.06.2021
RS02.06.2021
SE02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/51]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
RS02.06.2021
SE02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/49]FI02.06.2021
HR02.06.2021
LT02.06.2021
LV02.06.2021
SE02.06.2021
BG02.09.2021
NO02.09.2021
GR03.09.2021
Former [2021/47]FI02.06.2021
LT02.06.2021
BG02.09.2021
Former [2021/46]FI02.06.2021
LT02.06.2021
Documents cited:Search[XA] US2009276154  (SUBRAMANIAN SANKAR et al.) [X] 1,3,9,10 * paragraph [0015] - paragraph [0034]; figures 1-3 * * paragraph [0038] - paragraph [0039]; figure 4 * * paragraph [0042] - paragraph [0043]; figures 5B,5C *[A] 2,4-8
 [XA] US2014129143  (DAVE SWAPNIL R et al.) [X] 1-4,6,10 * paragraph [0003] * * paragraph [0023] - paragraph [0050]; figures 1,2 * * paragraph [0070] - paragraph [0081]; figures 7,8 * * paragraph [0082] - paragraph [0087]; figure 9 * * claims 1-4 *[A] 5,7-9
 [XA] DE602005001841  (ALCATEL LUCENT et al.) [X] 1-5,8-10 * paragraph [0053] - paragraph [0070]; figures 3,4; claims 1,8 *[A] 6,7
 [A] US2007168118  (LAPPE DIRK et al.) [A] 7 * paragraph [0061]; figure 10 *
ExaminationUS2005222756
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.