| EP3051258 - DETERMINATION OF A ROUTE USING A FIRST AND A SECOND NAVIGATION DEVICE [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 08.04.2022 Database last updated on 09.04.2026 | |
| Former | The patent has been granted Status updated on 30.04.2021 | ||
| Former | Grant of patent is intended Status updated on 22.12.2020 | ||
| Former | Examination is in progress Status updated on 16.06.2017 | ||
| Former | Request for examination was made Status updated on 10.02.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states JOYNEXT GmbH Gewerbepark Merbitz 5 01156 Dresden / DE | [2020/39] |
| Former [2016/39] | For all designated states Preh Car Connect GmbH Gewerbepark Merbitz Nr. 5 01156 Dresden / DE | ||
| Former [2016/31] | For all designated states TechniSat Digital GmbH Gewerbepark Merbitz Nr. 5 01156 Dresden / DE | Inventor(s) | 01 /
Porstmann, Frank Am Brunnen 4 01705 Freital / DE | 02 /
Ulbricht, Dirk Prießnitzstr. 27 01099 Dresden / DE | 03 /
Kahlenbach, Andreas Malterstr. 33 01159 Dresden / DE | 04 /
Lietz, Holger Wittenberger Str. 10 09126 Chemnitz / DE | [2016/31] | Application number, filing date | 16020021.8 | 29.01.2016 | [2016/31] | Priority number, date | DE20151001469 | 30.01.2015 Original published format: DE102015001469 | [2016/31] | Filing language | DE | Procedural language | DE | Publication | Type: | A2 Application without search report | No.: | EP3051258 | Date: | 03.08.2016 | Language: | DE | [2016/31] | Type: | A3 Search report | No.: | EP3051258 | Date: | 10.08.2016 | Language: | DE | [2016/32] | Type: | B1 Patent specification | No.: | EP3051258 | Date: | 02.06.2021 | Language: | DE | [2021/22] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 08.07.2016 | Classification | IPC: | G01C21/34 | [2016/31] | CPC: |
G01C21/3438 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/11] |
| Former [2016/31] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | BESTIMMEN EINER ROUTE UNTER VERWENDUNG EINER ERSTEN NAVIGATIONSEINRICHTUNG UND EINER ZWEITEN NAVIGATIONSEINRICHTUNG | [2016/31] | English: | DETERMINATION OF A ROUTE USING A FIRST AND A SECOND NAVIGATION DEVICE | [2016/31] | French: | DÉTERMINATION D'UN ITINÉRAIRE À L'AIDE D'UN PREMIER SYSTÈME DE NAVIGATION ET D'UN SECOND SYSTÈME DE NAVIGATION | [2021/03] |
| Former [2016/31] | DETERMINATION D'UN ITINERAIRE A L'AIDE D'UN PREMIER SYSTEME DE NAVIGATION ET D'UN SECOND SYSTEME DE NAVIGATION | Examination procedure | 29.01.2016 | Date on which the examining division has become responsible | 06.02.2017 | Examination requested [2017/11] | 10.02.2017 | Amendment by applicant (claims and/or description) | 19.06.2017 | Despatch of a communication from the examining division (Time limit: M06) | 22.12.2017 | Reply to a communication from the examining division | 25.11.2019 | Despatch of a communication from the examining division (Time limit: M04) | 25.03.2020 | Reply to a communication from the examining division | 23.12.2020 | Communication of intention to grant the patent | 12.04.2021 | Fee for grant paid | 12.04.2021 | Fee for publishing/printing paid | 23.04.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 03.03.2022 | No opposition filed within time limit [2022/19] | Fees paid | Renewal fee | 01.02.2018 | Renewal fee patent year 03 | 28.01.2019 | Renewal fee patent year 04 | 02.03.2020 | Renewal fee patent year 05 | 18.01.2021 | Renewal fee patent year 06 | Penalty fee | Additional fee for renewal fee | 31.01.2018 | 03   M06   Fee paid on   22.02.2018 | 31.01.2020 | 05   M06   Fee paid on   30.03.2020 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 29.01.2016 | AL | 02.06.2021 | CY | 02.06.2021 | CZ | 02.06.2021 | DK | 02.06.2021 | EE | 02.06.2021 | ES | 02.06.2021 | FI | 02.06.2021 | HR | 02.06.2021 | IT | 02.06.2021 | LT | 02.06.2021 | LV | 02.06.2021 | MC | 02.06.2021 | MK | 02.06.2021 | MT | 02.06.2021 | NL | 02.06.2021 | PL | 02.06.2021 | RO | 02.06.2021 | RS | 02.06.2021 | SE | 02.06.2021 | SI | 02.06.2021 | SK | 02.06.2021 | SM | 02.06.2021 | TR | 02.06.2021 | BG | 02.09.2021 | NO | 02.09.2021 | GR | 03.09.2021 | IS | 02.10.2021 | PT | 04.10.2021 | AT | 29.01.2022 | GB | 29.01.2022 | IE | 29.01.2022 | LU | 29.01.2022 | BE | 31.01.2022 | CH | 31.01.2022 | FR | 31.01.2022 | LI | 31.01.2022 | [2024/41] |
| Former [2024/29] | HU | 29.01.2016 | |
| AL | 02.06.2021 | ||
| CY | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| MK | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| TR | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| AT | 29.01.2022 | ||
| GB | 29.01.2022 | ||
| IE | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2024/22] | HU | 29.01.2016 | |
| AL | 02.06.2021 | ||
| CY | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| MK | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| AT | 29.01.2022 | ||
| GB | 29.01.2022 | ||
| IE | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2024/20] | HU | 29.01.2016 | |
| AL | 02.06.2021 | ||
| CY | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| AT | 29.01.2022 | ||
| GB | 29.01.2022 | ||
| IE | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2024/18] | HU | 29.01.2016 | |
| AL | 02.06.2021 | ||
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| AT | 29.01.2022 | ||
| GB | 29.01.2022 | ||
| IE | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2023/22] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| AT | 29.01.2022 | ||
| GB | 29.01.2022 | ||
| IE | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2023/09] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| GB | 29.01.2022 | ||
| IE | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2023/03] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| GB | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| CH | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| LI | 31.01.2022 | ||
| Former [2023/01] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| GB | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| BE | 31.01.2022 | ||
| FR | 31.01.2022 | ||
| Former [2022/50] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| GB | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| FR | 31.01.2022 | ||
| Former [2022/47] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| GB | 29.01.2022 | ||
| LU | 29.01.2022 | ||
| Former [2022/46] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| LU | 29.01.2022 | ||
| Former [2022/39] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| MC | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/36] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| IT | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/29] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SI | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/26] | AL | 02.06.2021 | |
| CZ | 02.06.2021 | ||
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/21] | CZ | 02.06.2021 | |
| DK | 02.06.2021 | ||
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/10] | CZ | 02.06.2021 | |
| EE | 02.06.2021 | ||
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| IS | 02.10.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/09] | CZ | 02.06.2021 | |
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RO | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SK | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| PT | 04.10.2021 | ||
| Former [2022/08] | CZ | 02.06.2021 | |
| ES | 02.06.2021 | ||
| FI | 02.06.2021 | ||
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2022/07] | FI | 02.06.2021 | |
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| NL | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| SM | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/52] | FI | 02.06.2021 | |
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| PL | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/51] | FI | 02.06.2021 | |
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| RS | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/49] | FI | 02.06.2021 | |
| HR | 02.06.2021 | ||
| LT | 02.06.2021 | ||
| LV | 02.06.2021 | ||
| SE | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| NO | 02.09.2021 | ||
| GR | 03.09.2021 | ||
| Former [2021/47] | FI | 02.06.2021 | |
| LT | 02.06.2021 | ||
| BG | 02.09.2021 | ||
| Former [2021/46] | FI | 02.06.2021 | |
| LT | 02.06.2021 | Documents cited: | Search | [XA] US2009276154 (SUBRAMANIAN SANKAR et al.) [X] 1,3,9,10 * paragraph [0015] - paragraph [0034]; figures 1-3 * * paragraph [0038] - paragraph [0039]; figure 4 * * paragraph [0042] - paragraph [0043]; figures 5B,5C *[A] 2,4-8 | [XA] US2014129143 (DAVE SWAPNIL R et al.) [X] 1-4,6,10 * paragraph [0003] * * paragraph [0023] - paragraph [0050]; figures 1,2 * * paragraph [0070] - paragraph [0081]; figures 7,8 * * paragraph [0082] - paragraph [0087]; figure 9 * * claims 1-4 *[A] 5,7-9 | [XA] DE602005001841 (ALCATEL LUCENT et al.) [X] 1-5,8-10 * paragraph [0053] - paragraph [0070]; figures 3,4; claims 1,8 *[A] 6,7 | [A] US2007168118 (LAPPE DIRK et al.) [A] 7 * paragraph [0061]; figure 10 * | Examination | US2005222756 |