| EP3038362 - DECODING METHOD FOR INTRA PREDICTING A BLOCK BY FIRST PREDICTING THE PIXELS AT THE BOUNDARY [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 18.10.2019 Database last updated on 28.03.2026 | |
| Former | The patent has been granted Status updated on 09.11.2018 | ||
| Former | Grant of patent is intended Status updated on 08.05.2018 | ||
| Former | Examination is in progress Status updated on 18.04.2017 | Most recent event Tooltip | 23.07.2021 | Lapse of the patent in a contracting state New state(s): MT | published on 25.08.2021 [2021/34] | Applicant(s) | For all designated states Maxell, Ltd. 1, Koizumi Oyamazaki Oyamazaki-cho Otokuni-gun, Kyoto 618-8525 / JP | [2018/08] |
| Former [2016/26] | For all designated states Hitachi Maxell, Ltd. 1-88, Ushitora 1-chome Ibaraki-shi, Osaka 567-8567 / JP | Inventor(s) | 01 /
TAKAHASHI, Masashi c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku, Tokyo 100-8220 / JP | 02 /
MURAKAMI, Tomokazu c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku, Tokyo 100-8220 / JP | [2018/50] |
| Former [2016/26] | 01 /
TAKAHASHI, Masashi c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku, Tokyo 100-8220 / JP | ||
| 02 /
MURAKAMI, Tomokazu c/o Hitachi, Ltd., Intellectual Property Group 12th Floor, Marunouchi Center Building, 6-1 Marunouchi 1-chome Chiyoda-ku, Tokyo 100-8220 / JP | Representative(s) | Mewburn Ellis LLP Aurora Building Counterslip Bristol BS1 6BX / GB | [N/P] |
| Former [2018/50] | Addiss, John William, et al Mewburn Ellis LLP City Tower 40 Basinghall Street London EC2V 5DE / GB | ||
| Former [2016/26] | Calderbank, Thomas Roger, et al Mewburn Ellis LLP City Tower 40 Basinghall Street London EC2V 5DE / GB | Application number, filing date | 16150161.4 | 09.10.2008 | [2016/26] | Priority number, date | JP20070263888 | 10.10.2007 Original published format: JP 2007263888 | [2016/26] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3038362 | Date: | 29.06.2016 | Language: | EN | [2016/26] | Type: | B1 Patent specification | No.: | EP3038362 | Date: | 12.12.2018 | Language: | EN | [2018/50] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 06.04.2016 | Classification | IPC: | H04N19/593 | [2018/22] | CPC: |
H04N19/593 (EP,US);
H04N19/11 (US);
H04N19/107 (EP);
H04N19/124 (US);
H04N19/147 (EP,US);
H04N19/159 (US);
H04N19/17 (US);
H04N19/176 (EP,US);
H04N19/182 (US);
H04N19/567 (US)
(-)
|
| Former IPC [2016/26] | H04N19/11, H04N19/147, H04N19/176, H04N19/593 | Designated contracting states | AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MT, NL, NO, PL, PT, RO, SE, SI, SK, TR [2016/26] | Title | German: | VERFAHREN ZUR INTRAPRÄDIKTIVEN BLOCKDEKODIERUNG FÜR ERSTMALIGE PRÄDIKTION VON AUSSENRANDPIXELS | [2016/26] | English: | DECODING METHOD FOR INTRA PREDICTING A BLOCK BY FIRST PREDICTING THE PIXELS AT THE BOUNDARY | [2016/26] | French: | PROCÉDÉ DE DÉCODAGE POUR LA INTRA-PRÉDICTION D'UN BLOC EN COMMENÇANT PAR DES PIXELS À LA LIMITE DU BLOC | [2018/23] |
| Former [2016/26] | PROCÉDÉ DE DÉCODAGE POUR LA INTRA-PRÉDICTION DES PIXELS HORS LIMITE | Examination procedure | 22.01.2016 | Examination requested [2016/26] | 21.12.2016 | Amendment by applicant (claims and/or description) | 19.04.2017 | Despatch of a communication from the examining division (Time limit: M06) | 26.10.2017 | Reply to a communication from the examining division | 15.11.2017 | Despatch of a communication from the examining division (Time limit: M04) | 27.02.2018 | Reply to a communication from the examining division | 16.05.2018 | Communication of intention to grant the patent | 20.09.2018 | Fee for grant paid | 20.09.2018 | Fee for publishing/printing paid | 20.09.2018 | Receipt of the translation of the claim(s) | Parent application(s) Tooltip | EP08253302.7 / EP2059048 | Divisional application(s) | EP18195786.1 / EP3448038 | EP20159494.2 / EP3684059 | EP23202909.0 / EP4283994 | EP25154628.9 / EP4529165 | Opposition(s) | 13.09.2019 | No opposition filed within time limit [2019/47] | Fees paid | Renewal fee | 22.01.2016 | Renewal fee patent year 03 | 22.01.2016 | Renewal fee patent year 04 | 22.01.2016 | Renewal fee patent year 05 | 22.01.2016 | Renewal fee patent year 06 | 22.01.2016 | Renewal fee patent year 07 | 22.01.2016 | Renewal fee patent year 08 | 24.10.2016 | Renewal fee patent year 09 | 25.10.2017 | Renewal fee patent year 10 | 25.10.2018 | Renewal fee patent year 11 |
| Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
| Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.10.2008 | AT | 12.12.2018 | CY | 12.12.2018 | CZ | 12.12.2018 | DK | 12.12.2018 | EE | 12.12.2018 | ES | 12.12.2018 | FI | 12.12.2018 | HR | 12.12.2018 | LT | 12.12.2018 | LV | 12.12.2018 | MC | 12.12.2018 | MT | 12.12.2018 | NL | 12.12.2018 | RO | 12.12.2018 | SE | 12.12.2018 | SI | 12.12.2018 | SK | 12.12.2018 | BG | 12.03.2019 | NO | 12.03.2019 | GR | 13.03.2019 | IS | 12.04.2019 | PT | 12.04.2019 | [2021/34] |
| Former [2021/32] | HU | 09.10.2008 | |
| AT | 12.12.2018 | ||
| CY | 12.12.2018 | ||
| CZ | 12.12.2018 | ||
| DK | 12.12.2018 | ||
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| MC | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| SI | 12.12.2018 | ||
| SK | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| IS | 12.04.2019 | ||
| PT | 12.04.2019 | ||
| Former [2021/26] | AT | 12.12.2018 | |
| CY | 12.12.2018 | ||
| CZ | 12.12.2018 | ||
| DK | 12.12.2018 | ||
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| MC | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| SI | 12.12.2018 | ||
| SK | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| IS | 12.04.2019 | ||
| PT | 12.04.2019 | ||
| Former [2020/29] | AT | 12.12.2018 | |
| CZ | 12.12.2018 | ||
| DK | 12.12.2018 | ||
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| MC | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| SI | 12.12.2018 | ||
| SK | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| IS | 12.04.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/50] | AT | 12.12.2018 | |
| CZ | 12.12.2018 | ||
| DK | 12.12.2018 | ||
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| SI | 12.12.2018 | ||
| SK | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| IS | 12.04.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/48] | AT | 12.12.2018 | |
| CZ | 12.12.2018 | ||
| DK | 12.12.2018 | ||
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| SK | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| IS | 12.04.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/46] | AT | 12.12.2018 | |
| CZ | 12.12.2018 | ||
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| SK | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| IS | 12.04.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/39] | CZ | 12.12.2018 | |
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| SK | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| IS | 12.04.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/37] | CZ | 12.12.2018 | |
| EE | 12.12.2018 | ||
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| RO | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/35] | CZ | 12.12.2018 | |
| ES | 12.12.2018 | ||
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/33] | ES | 12.12.2018 | |
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| PT | 12.04.2019 | ||
| Former [2019/30] | ES | 12.12.2018 | |
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| NL | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| Former [2019/25] | ES | 12.12.2018 | |
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| SE | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| GR | 13.03.2019 | ||
| Former [2019/23] | ES | 12.12.2018 | |
| FI | 12.12.2018 | ||
| HR | 12.12.2018 | ||
| LT | 12.12.2018 | ||
| LV | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| Former [2019/22] | FI | 12.12.2018 | |
| LT | 12.12.2018 | ||
| BG | 12.03.2019 | ||
| NO | 12.03.2019 | ||
| Former [2019/21] | FI | 12.12.2018 | |
| LT | 12.12.2018 | ||
| NO | 12.03.2019 | ||
| Former [2019/20] | LT | 12.12.2018 | |
| NO | 12.03.2019 | Documents cited: | Search | [Y] US2007110153 (CHO DAE-SUNG et al.) | [A] WO2006106935 (MATSUSHITA ELECTRIC INDUSTRIAL CO LTD et al.) | [Y] PENG ZHANG ET AL: "Multiple modes intra-prediction in intra coding", 2004 IEEE INTERNATIONAL CONFERENCE ON MULTIMEDIA AND EXPO (ICME) (IEEE CAT. NO.04TH8763) IEEE PISCATAWAY, NJ, USA,, vol. 1, 27 June 2004 (2004-06-27), pages 419 - 422, XP010770800, ISBN: 978-0-7803-8603-7 DOI: http://dx.doi.org/10.1109/ICME.2004.1394218 | [Y] SHIODERA T ET AL: "Bidirectional intra prediction", 31. VCEG MEETING; 79. MPEG MEETING; 15-01-2007 - 16-01-2007;MARRAKECH; (VIDEO CODING EXPERTS GROUP OF ITU-T SG.16),, no. VCEG-AE14, 14 January 2007 (2007-01-14), XP030003517, ISSN: 0000-0157 | [Y] MARTA KARCZEWICZ ET AL: "Interpolation Solution with Low Encoder Memory Requirements and Low Decoder Complexity", 14. VCEG MEETING; 24-09-2001 - 27-09-2001; SANTA BARBARA, CALIFORNIA,US; (VIDEO CODING EXPERTS GROUP OF ITU-T SG.16),, no. VCEG-N31r1, 1 October 2001 (2001-10-01), XP030003281, ISSN: 0000-0460 [Y] 1 * section 2.3 * * figure 3 * | Examination | US2007121731 | by applicant | JP2006352181 | T. SHIODERA; A. TANIZAWA; T. CHUJOH: "Block Based Extra/Interpolating Prediction for Intra Coding", PCSJ2006, November 2006 (2006-11-01) | G, SULLIVAN; T. WIEGAND: "Rate-Distortion Optimization for Video Compression", IEEE SIGNAL PROCESSING MAGAZINE, vol. 15, no. 6, 1998, pages 74 - 90, XP011089821, DOI: doi:10.1109/79.733497 DOI: http://dx.doi.org/10.1109/79.733497 |