EP3067764 - PHOTOELECTRIC SENSOR WITH PULSE DETECTION [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 27.05.2022 Database last updated on 13.11.2024 | |
Former | The patent has been granted Status updated on 18.06.2021 | ||
Former | Grant of patent is intended Status updated on 21.02.2021 | ||
Former | Request for examination was made Status updated on 05.02.2021 | ||
Former | Grant of patent is intended Status updated on 17.12.2020 | ||
Former | Request for examination was made Status updated on 24.03.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Rockwell Automation Technologies, Inc. 1 Allen-Bradley Drive Mayfield Heights, OH 44124 / US | [2016/37] | Inventor(s) | 01 /
BOUTAUD, Frederic 5 Fulton Road Lexington, MA Massachusetts 02420 / US | [2016/37] | Representative(s) | Grünecker Patent- und Rechtsanwälte PartG mbB Leopoldstraße 4 80802 München / DE | [2016/37] | Application number, filing date | 16159394.2 | 09.03.2016 | [2016/37] | Priority number, date | US201514642687 | 09.03.2015 Original published format: US201514642687 | [2016/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3067764 | Date: | 14.09.2016 | Language: | EN | [2016/37] | Type: | B1 Patent specification | No.: | EP3067764 | Date: | 21.07.2021 | Language: | EN | [2021/29] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 20.07.2016 | Classification | IPC: | G05B19/042, G01S17/02 | [2016/37] | CPC: |
G05B19/042 (EP,US);
G01D5/34 (CN);
G01J1/44 (US);
G01D5/36 (CN);
G01S17/04 (EP,US);
G01S7/4868 (EP,US);
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/17] |
Former [2016/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | PHOTOELEKTRISCHER SENSOR MIT PULS-ERKENNUNG | [2016/37] | English: | PHOTOELECTRIC SENSOR WITH PULSE DETECTION | [2016/37] | French: | CAPTEUR PHOTOÉLECTRIQUE AVEC DÉTECTEUR D'IMPULSIONS | [2016/37] | Examination procedure | 09.03.2016 | Date on which the examining division has become responsible | 14.03.2017 | Amendment by applicant (claims and/or description) | 14.03.2017 | Examination requested [2017/17] | 18.12.2020 | Communication of intention to grant the patent | 04.02.2021 | Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO | 22.02.2021 | Communication of intention to grant the patent | 09.06.2021 | Fee for grant paid | 09.06.2021 | Fee for publishing/printing paid | 09.06.2021 | Receipt of the translation of the claim(s) | Opposition(s) | 22.04.2022 | No opposition filed within time limit [2022/26] | Fees paid | Renewal fee | 27.03.2018 | Renewal fee patent year 03 | 27.03.2019 | Renewal fee patent year 04 | 20.03.2020 | Renewal fee patent year 05 | 23.03.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.03.2016 | AL | 21.07.2021 | AT | 21.07.2021 | CY | 21.07.2021 | CZ | 21.07.2021 | DK | 21.07.2021 | EE | 21.07.2021 | ES | 21.07.2021 | FI | 21.07.2021 | HR | 21.07.2021 | IT | 21.07.2021 | LT | 21.07.2021 | LV | 21.07.2021 | MC | 21.07.2021 | MK | 21.07.2021 | MT | 21.07.2021 | NL | 21.07.2021 | PL | 21.07.2021 | RO | 21.07.2021 | RS | 21.07.2021 | SE | 21.07.2021 | SI | 21.07.2021 | SK | 21.07.2021 | SM | 21.07.2021 | BG | 21.10.2021 | NO | 21.10.2021 | GR | 22.10.2021 | IS | 21.11.2021 | PT | 22.11.2021 | IE | 09.03.2022 | LU | 09.03.2022 | BE | 31.03.2022 | CH | 31.03.2022 | LI | 31.03.2022 | [2024/41] |
Former [2024/22] | HU | 09.03.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
MK | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 09.03.2022 | ||
LU | 09.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/20] | HU | 09.03.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CY | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 09.03.2022 | ||
LU | 09.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2024/18] | HU | 09.03.2016 | |
AL | 21.07.2021 | ||
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 09.03.2022 | ||
LU | 09.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/10] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 09.03.2022 | ||
LU | 09.03.2022 | ||
BE | 31.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/09] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 09.03.2022 | ||
LU | 09.03.2022 | ||
CH | 31.03.2022 | ||
LI | 31.03.2022 | ||
Former [2023/08] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
IE | 09.03.2022 | ||
LU | 09.03.2022 | ||
Former [2022/47] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
MC | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/36] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
IT | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/29] | AL | 21.07.2021 | |
AT | 21.07.2021 | ||
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SI | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/26] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
SM | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/24] | AT | 21.07.2021 | |
CZ | 21.07.2021 | ||
DK | 21.07.2021 | ||
EE | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RO | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
SK | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/21] | AT | 21.07.2021 | |
DK | 21.07.2021 | ||
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/11] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
HR | 21.07.2021 | ||
LT | 21.07.2021 | ||
LV | 21.07.2021 | ||
NL | 21.07.2021 | ||
PL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
GR | 22.10.2021 | ||
IS | 21.11.2021 | ||
PT | 22.11.2021 | ||
Former [2022/09] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
RS | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
PT | 22.11.2021 | ||
Former [2022/08] | AT | 21.07.2021 | |
ES | 21.07.2021 | ||
FI | 21.07.2021 | ||
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
SE | 21.07.2021 | ||
BG | 21.10.2021 | ||
NO | 21.10.2021 | ||
Former [2022/07] | AT | 21.07.2021 | |
LT | 21.07.2021 | ||
NL | 21.07.2021 | ||
NO | 21.10.2021 | Documents cited: | Search | [A]EP2442135 (ROCKWELL AUTOMATION TECH INC [US], et al) [A] 1,11,16* the whole document *; | [A]EP2581759 (AZBIL CORP [JP]) [A] 1,11,16 * the whole document * |