blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3067764

EP3067764 - PHOTOELECTRIC SENSOR WITH PULSE DETECTION [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  27.05.2022
Database last updated on 13.11.2024
FormerThe patent has been granted
Status updated on  18.06.2021
FormerGrant of patent is intended
Status updated on  21.02.2021
FormerRequest for examination was made
Status updated on  05.02.2021
FormerGrant of patent is intended
Status updated on  17.12.2020
FormerRequest for examination was made
Status updated on  24.03.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
Rockwell Automation Technologies, Inc.
1 Allen-Bradley Drive
Mayfield Heights, OH 44124 / US
[2016/37]
Inventor(s)01 / BOUTAUD, Frederic
5 Fulton Road
Lexington, MA Massachusetts 02420 / US
 [2016/37]
Representative(s)Grünecker Patent- und Rechtsanwälte PartG mbB
Leopoldstraße 4
80802 München / DE
[2016/37]
Application number, filing date16159394.209.03.2016
[2016/37]
Priority number, dateUS20151464268709.03.2015         Original published format: US201514642687
[2016/37]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3067764
Date:14.09.2016
Language:EN
[2016/37]
Type: B1 Patent specification 
No.:EP3067764
Date:21.07.2021
Language:EN
[2021/29]
Search report(s)(Supplementary) European search report - dispatched on:EP20.07.2016
ClassificationIPC:G05B19/042, G01S17/02
[2016/37]
CPC:
G05B19/042 (EP,US); G01D5/34 (CN); G01J1/44 (US);
G01D5/36 (CN); G01S17/04 (EP,US); G01S7/4868 (EP,US);
G01S7/487 (EP,US); G01J2001/4238 (US); G05B2219/37283 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/17]
Former [2016/37]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:PHOTOELEKTRISCHER SENSOR MIT PULS-ERKENNUNG[2016/37]
English:PHOTOELECTRIC SENSOR WITH PULSE DETECTION[2016/37]
French:CAPTEUR PHOTOÉLECTRIQUE AVEC DÉTECTEUR D'IMPULSIONS[2016/37]
Examination procedure09.03.2016Date on which the examining division has become responsible
14.03.2017Amendment by applicant (claims and/or description)
14.03.2017Examination requested  [2017/17]
18.12.2020Communication of intention to grant the patent
04.02.2021Disapproval of the communication of intention to grant the patent by the applicant or resumption of examination proceedings by the EPO
22.02.2021Communication of intention to grant the patent
09.06.2021Fee for grant paid
09.06.2021Fee for publishing/printing paid
09.06.2021Receipt of the translation of the claim(s)
Opposition(s)22.04.2022No opposition filed within time limit [2022/26]
Fees paidRenewal fee
27.03.2018Renewal fee patent year 03
27.03.2019Renewal fee patent year 04
20.03.2020Renewal fee patent year 05
23.03.2021Renewal fee patent year 06
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU09.03.2016
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
MT21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
[2024/41]
Former [2024/22]HU09.03.2016
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
MK21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/20]HU09.03.2016
AL21.07.2021
AT21.07.2021
CY21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2024/18]HU09.03.2016
AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/10]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE09.03.2022
LU09.03.2022
BE31.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/09]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE09.03.2022
LU09.03.2022
CH31.03.2022
LI31.03.2022
Former [2023/08]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
IE09.03.2022
LU09.03.2022
Former [2022/47]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
MC21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/36]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
IT21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/29]AL21.07.2021
AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SI21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/26]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
SM21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/24]AT21.07.2021
CZ21.07.2021
DK21.07.2021
EE21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RO21.07.2021
RS21.07.2021
SE21.07.2021
SK21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/21]AT21.07.2021
DK21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/11]AT21.07.2021
ES21.07.2021
FI21.07.2021
HR21.07.2021
LT21.07.2021
LV21.07.2021
NL21.07.2021
PL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
GR22.10.2021
IS21.11.2021
PT22.11.2021
Former [2022/09]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
RS21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
PT22.11.2021
Former [2022/08]AT21.07.2021
ES21.07.2021
FI21.07.2021
LT21.07.2021
NL21.07.2021
SE21.07.2021
BG21.10.2021
NO21.10.2021
Former [2022/07]AT21.07.2021
LT21.07.2021
NL21.07.2021
NO21.10.2021
Documents cited:Search[A]EP2442135  (ROCKWELL AUTOMATION TECH INC [US], et al) [A] 1,11,16* the whole document *;
 [A]EP2581759  (AZBIL CORP [JP]) [A] 1,11,16 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.