EP3067773 - VOLTAGE REGULATION SYSTEM AND METHOD [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 03.12.2021 Database last updated on 04.11.2024 | |
Former | The patent has been granted Status updated on 25.12.2020 | ||
Former | Grant of patent is intended Status updated on 04.10.2020 | ||
Former | Examination is in progress Status updated on 08.06.2018 | ||
Former | Request for examination was made Status updated on 24.03.2017 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Legend Power Systems Inc. 8561 Commerce Court Burnaby, British Columbia V5A 4N5 / CA | [2016/37] | Inventor(s) | 01 /
PETERSEN, Mark 749 West 20th North Vancouver, British Columbia V7P 2B3 / CA | 02 /
THOMSON, Jonathan Stewart 2831 East 1st Avenue Vancouver, British Columbia V5M 1A9 / CA | [2016/37] | Representative(s) | HGF HGF Limited 1 City Walk Leeds LS11 9DX / GB | [N/P] |
Former [2021/04] | HGF 1 City Walk Leeds LS11 9DX / GB | ||
Former [2016/37] | Cassie, Matthew David, et al HGF Limited 140 London Wall London EC2Y 5DN / GB | Application number, filing date | 16159525.1 | 09.03.2016 | [2016/37] | Priority number, date | US201514644655 | 11.03.2015 Original published format: US201514644655 | [2016/37] | Filing language | EN | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3067773 | Date: | 14.09.2016 | Language: | EN | [2016/37] | Type: | B1 Patent specification | No.: | EP3067773 | Date: | 27.01.2021 | Language: | EN | [2021/04] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 26.07.2016 | Classification | IPC: | G05F1/14 | [2016/37] | CPC: |
G05F1/14 (EP,US);
H03K17/13 (US);
H02M5/10 (US);
H02M5/12 (US);
H02M5/18 (US)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/17] |
Former [2016/37] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SPANNUNGSREGELUNGSSYSTEM UND VERFAHREN | [2016/37] | English: | VOLTAGE REGULATION SYSTEM AND METHOD | [2016/37] | French: | SYSTÈME ET PROCÉDÉ DE RÉGULATION DE TENSION | [2016/37] | Examination procedure | 09.03.2016 | Date on which the examining division has become responsible | 14.03.2017 | Amendment by applicant (claims and/or description) | 17.03.2017 | Examination requested [2017/17] | 08.06.2018 | Despatch of a communication from the examining division (Time limit: M04) | 08.10.2018 | Reply to a communication from the examining division | 08.02.2019 | Despatch of a communication from the examining division (Time limit: M04) | 07.06.2019 | Reply to a communication from the examining division | 05.10.2020 | Communication of intention to grant the patent | 16.12.2020 | Fee for grant paid | 16.12.2020 | Fee for publishing/printing paid | 16.12.2020 | Receipt of the translation of the claim(s) | Opposition(s) | 28.10.2021 | No opposition filed within time limit [2022/01] | Request for further processing for: | The application is deemed to be withdrawn due to non-payment of the examination fee | 17.03.2017 | Request for further processing filed | 17.03.2017 | Full payment received (date of receipt of payment) Request granted | 04.04.2017 | Decision despatched | The application is deemed to be withdrawn due to non-payment of designation fees TR, SM, SK, SI, SE, RS, RO, PT, PL, NO, NL, MT, MK, MC, LV, LU, LT, IT, IS, IE, HU, HR, GR, GB, FR, FI, ES, EE, DK, DE, CZ, CY, CH, BG, BE, AT, AL | 17.03.2017 | Request for further processing filed | 17.03.2017 | Full payment received (date of receipt of payment) Request granted | 04.04.2017 | Decision despatched | 17.03.2017 | Request for further processing filed | 17.03.2017 | Full payment received (date of receipt of payment) Request granted | 04.04.2017 | Decision despatched | Fees paid | Renewal fee | 05.03.2018 | Renewal fee patent year 03 | 29.03.2019 | Renewal fee patent year 04 | 10.03.2020 | Renewal fee patent year 05 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 09.03.2016 | AL | 27.01.2021 | AT | 27.01.2021 | CY | 27.01.2021 | CZ | 27.01.2021 | DK | 27.01.2021 | EE | 27.01.2021 | ES | 27.01.2021 | FI | 27.01.2021 | HR | 27.01.2021 | IT | 27.01.2021 | LT | 27.01.2021 | LV | 27.01.2021 | MC | 27.01.2021 | MK | 27.01.2021 | MT | 27.01.2021 | NL | 27.01.2021 | PL | 27.01.2021 | RO | 27.01.2021 | RS | 27.01.2021 | SE | 27.01.2021 | SI | 27.01.2021 | SK | 27.01.2021 | SM | 27.01.2021 | TR | 27.01.2021 | IE | 09.03.2021 | LU | 09.03.2021 | BE | 31.03.2021 | CH | 31.03.2021 | LI | 31.03.2021 | BG | 27.04.2021 | NO | 27.04.2021 | GR | 28.04.2021 | IS | 27.05.2021 | PT | 27.05.2021 | [2024/41] |
Former [2024/29] | HU | 09.03.2016 | |
AL | 27.01.2021 | ||
AT | 27.01.2021 | ||
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
MK | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
TR | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2024/22] | HU | 09.03.2016 | |
AL | 27.01.2021 | ||
AT | 27.01.2021 | ||
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
MK | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2023/30] | HU | 09.03.2016 | |
AL | 27.01.2021 | ||
AT | 27.01.2021 | ||
CY | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2023/27] | HU | 09.03.2016 | |
AL | 27.01.2021 | ||
AT | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2022/34] | AL | 27.01.2021 | |
AT | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BE | 31.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2022/23] | AL | 27.01.2021 | |
AT | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
IT | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2022/11] | AL | 27.01.2021 | |
AT | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SI | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2022/10] | AL | 27.01.2021 | |
AT | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
CH | 31.03.2021 | ||
LI | 31.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2022/09] | AL | 27.01.2021 | |
AT | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
LU | 09.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2022/07] | AL | 27.01.2021 | |
AT | 27.01.2021 | ||
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
IE | 09.03.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/51] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
ES | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/50] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RO | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SK | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/49] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
DK | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/48] | AT | 27.01.2021 | |
CZ | 27.01.2021 | ||
EE | 27.01.2021 | ||
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/46] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
SM | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/45] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
MC | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/42] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
IS | 27.05.2021 | ||
PT | 27.05.2021 | ||
Former [2021/39] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
PL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/38] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
RS | 27.01.2021 | ||
SE | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/37] | AT | 27.01.2021 | |
FI | 27.01.2021 | ||
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
LV | 27.01.2021 | ||
NL | 27.01.2021 | ||
RS | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/36] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
NL | 27.01.2021 | ||
BG | 27.04.2021 | ||
NO | 27.04.2021 | ||
GR | 28.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/35] | FI | 27.01.2021 | |
HR | 27.01.2021 | ||
LT | 27.01.2021 | ||
NL | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/34] | FI | 27.01.2021 | |
LT | 27.01.2021 | ||
NL | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | ||
Former [2021/33] | FI | 27.01.2021 | |
LT | 27.01.2021 | ||
NO | 27.04.2021 | ||
PT | 27.05.2021 | Documents cited: | Search | [A]US6137277 (RAJDA JANOS [CA], et al) [A] 1-15 * abstract *; | [A]US6906476 (BEATENBOUGH BRYAN [US], et al) [A] 1-15* abstract *; | [A]WO2009137908 (LEGEND POWER SYSTEMS INC [CA], et al) [A] 1-15 * the whole document * |