blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3236178

EP3236178 - SORPTION HEAT PUMP AND SORPTION CIRCUIT PROCESS [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.06.2021
Database last updated on 06.11.2024
FormerThe patent has been granted
Status updated on  10.07.2020
FormerGrant of patent is intended
Status updated on  03.05.2020
FormerRequest for examination was made
Status updated on  17.11.2017
FormerThe application has been published
Status updated on  22.09.2017
Most recent event   Tooltip06.09.2024Lapse of the patent in a contracting state
New state(s): MT
published on 09.10.2024  [2024/41]
Applicant(s)For all designated states
AGO GmbH Energie + Anlagen
Am Goldenen Feld 23
95326 Kulmbach / DE
[2020/35]
Former [2017/43]For all designated states
AGO AG Energie + Anlagen
Am Goldenen Feld 23
95326 Kulmbach / DE
Inventor(s)01 / Ramming, Klaus
Eichberg 15
95336 Mainleus / DE
 [2017/43]
Representative(s)Bauer, Dirk
Bauer Wagner Pellengahr Sroka
Patent- & Rechtsanwalts PartG mbB
Grüner Weg 1
52070 Aachen / DE
[N/P]
Former [2017/43]Bauer, Dirk
Bauer Wagner Priesmeyer
Patent- und Rechtsanwälte
Grüner Weg 1
52070 Aachen / DE
Application number, filing date16166600.322.04.2016
[2017/43]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3236178
Date:25.10.2017
Language:DE
[2017/43]
Type: B1 Patent specification 
No.:EP3236178
Date:12.08.2020
Language:DE
[2020/33]
Search report(s)(Supplementary) European search report - dispatched on:EP04.10.2016
ClassificationIPC:F25B25/02, F25B37/00, F25B40/00, F25B15/04, F25B15/00, F25B1/10
[2017/43]
CPC:
F25B25/02 (EP); F25B1/10 (EP); F25B15/008 (EP);
F25B15/04 (EP); F25B37/00 (EP); F25B40/00 (EP);
F25B2400/075 (EP); Y02A30/27 (EP); Y02B30/62 (EP) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/51]
Former [2017/43]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SORPTIONSWÄRMEPUMPE UND SORPTIONSKREISPROZESS[2017/43]
English:SORPTION HEAT PUMP AND SORPTION CIRCUIT PROCESS[2017/43]
French:POMPE A CHALEUR A ABSORPTION ET PROCEDE DE CIRCUIT A ABSORPTION[2017/43]
Examination procedure22.04.2016Date on which the examining division has become responsible
09.11.2017Amendment by applicant (claims and/or description)
09.11.2017Examination requested  [2017/51]
04.05.2020Communication of intention to grant the patent
02.07.2020Fee for grant paid
02.07.2020Fee for publishing/printing paid
02.07.2020Receipt of the translation of the claim(s)
Opposition(s)14.05.2021No opposition filed within time limit [2021/29]
Fees paidRenewal fee
19.02.2018Renewal fee patent year 03
06.03.2019Renewal fee patent year 04
03.03.2020Renewal fee patent year 05
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU22.04.2016
AL12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MK12.08.2020
MT12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
AT22.04.2021
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
[2024/41]
Former [2024/22]HU22.04.2016
AL12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
MK12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
AT22.04.2021
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2023/30]HU22.04.2016
AL12.08.2020
CY12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
AT22.04.2021
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2023/27]HU22.04.2016
AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
AT22.04.2021
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2023/20]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
PT14.12.2020
AT22.04.2021
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/37]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
AT22.04.2021
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/34]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
BE30.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/23]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/21]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
GB22.04.2021
IE22.04.2021
LU22.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/10]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
GB22.04.2021
LU22.04.2021
CH30.04.2021
FR30.04.2021
LI30.04.2021
Former [2022/09]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
GB22.04.2021
LU22.04.2021
FR30.04.2021
Former [2022/04]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
LU22.04.2021
Former [2021/50]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
MC12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/36]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SI12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/34]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
IT12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/28]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SK12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/25]AL12.08.2020
CZ12.08.2020
DK12.08.2020
EE12.08.2020
ES12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/22]CZ12.08.2020
DK12.08.2020
EE12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RO12.08.2020
RS12.08.2020
SE12.08.2020
SM12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/21]DK12.08.2020
FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/12]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
NL12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/10]FI12.08.2020
HR12.08.2020
LT12.08.2020
LV12.08.2020
PL12.08.2020
RS12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
IS12.12.2020
Former [2021/09]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
GR13.11.2020
Former [2021/08]FI12.08.2020
LT12.08.2020
SE12.08.2020
BG12.11.2020
NO12.11.2020
Former [2021/07]FI12.08.2020
LT12.08.2020
NO12.11.2020
Documents cited:Search[YD]DE3808257  (TCH THERMO-CONSULTING-HEIDELBERG GMBH) [YD] 1-10 * column 9 - column 13; figure 1 *;
 [Y]FR2758616  (GAZ DE FRANCE [FR]) [Y] 1-10 * page 6 - page 8; figures 1,2 *;
 [A]US5791157  (MAEDA KENSAKU [JP]) [A] 1-10 * column 3 - column 21; figures 1-21 *;
 [A]US2013167581  (PARK SEONG-RYONG [KR], et al) [A] 1-10 * page 3 - page 7; figures 4,7 *;
 [A]US4475361  (ALEFELD GEORG [DE]) [A] 1-10 * column 2 - column 8; figures 1-4a *;
 [A]DE102012017314  (MAN DIESEL & TURBO SE [DE]) [A] 1-10 * page 2 - page 3; figure 1 *
by applicantDD236979
 CN1240953
 DE3808257
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.