blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3240332

EP3240332 - METHOD FOR TRANSMITTING SYSTEM INFORMATION BY A BASE NODE [Right-click to bookmark this link]
StatusThe application is deemed to be withdrawn
Status updated on  21.09.2018
Database last updated on 03.10.2024
FormerThe application has been published
Status updated on  29.09.2017
Most recent event   Tooltip21.09.2018Application deemed to be withdrawnpublished on 24.10.2018  [2018/43]
Applicant(s)For all designated states
Gemalto M2M GmbH
Werinherstraße 81
81541 Munich / DE
[2017/44]
Inventor(s)01 / BREUER, Volker
Schwalbenring 20
16727 Boetzow / DE
02 / WEHMEIER, Lars
Leistikowstrasse 62
14612 Falkensee / DE
 [2017/44]
Representative(s)Grevin, Emmanuel
Thales Dis France SAS
Intellectual Property Department
525, avenue du Pic de Bertagne
CS12023
13881 Gémenos Cedex / FR
[N/P]
Former [2017/44]Grevin, Emmanuel
Gemalto SA
525 avenue du Pic de Bertagne
CS 12023
13881 Gemenos Cedex / FR
Application number, filing date16167799.229.04.2016
[2017/44]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3240332
Date:01.11.2017
Language:EN
[2017/44]
Search report(s)(Supplementary) European search report - dispatched on:EP26.10.2016
ClassificationIPC:H04W48/12, // H04W84/04, H04W72/12
[2017/44]
CPC:
H04W48/12 (EP,US); H04W84/042 (EP,US); H04W88/08 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/44]
Extension statesBANot yet paid
MENot yet paid
Validation statesMANot yet paid
MDNot yet paid
TitleGerman:VERFAHREN ZUR ÜBERMITTLUNG VON SYSTEM INFORMATIONEN DURCH EINE BASISSTATION[2017/44]
English:METHOD FOR TRANSMITTING SYSTEM INFORMATION BY A BASE NODE[2017/44]
French:PROCÉDÉ POUR TRANSMETTRE DES INFORMATIONS DE SYSTÈME PAR UN NOEUD DE BASE[2017/44]
Examination procedure03.05.2018Application deemed to be withdrawn, date of legal effect  [2018/43]
08.06.2018Despatch of communication that the application is deemed to be withdrawn, reason: examination fee not paid in time  [2018/43]
Fees paidPenalty fee
Additional fee for renewal fee
30.04.201803   M06   Not yet paid
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Documents cited:Search[A]WO2016048045  (LG ELECTRONICS INC [KR]) [A] 1-14 * abstract * * figure 14 * * paragraphs [0001] - [0007] - [0048] , [0050] , [0061] , [0062] , [0080] - [0086] - [0202] , [0203] , [0208] , [0217] *;
 [Y]  - RAN WG1, "Status Report to TSG 1 Work plan related evaluation", vol. TSG RAN, no. GÖTEBORG; 20160307 - 20160310, (20160306), 3GPP DRAFT; RP-160183, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN/Docs/, (20160306), XP051076140 [Y] 1-14 * page 5/2 - page 7/2 * * page 11/2 * * page 17/2 *
 [Y]  - SAMSUNG, "Impact on System Information for In-band Operations of NB-IoT", vol. RAN WG2, no. Budapest, HU; 20160119 - 20160121, (20160118), 3GPP DRAFT; R2-160516 IMPACT ON SYSTEM INFORMATION FOR IN-BAND OPERATIONS OF NB-IOT, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTI, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20160118), XP051054802 [Y] 1-14 * the whole document *
 [A]  - INTEL CORPORATION, "Email discussion report on [NBAH#05][NBIOT/SI] System Information", vol. RAN WG2, no. St. Julian's, Malta; 20160215 - 20160219, (20160214), 3GPP DRAFT; R2-161254_NB-IOT_SI_EMAIL-DICUSSION-5, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/tsg_ran/WG2_RL2/TSGR2_93/Docs/, (20160214), XP051065995 [A] 1-14 * abstract * * page 11111111 *
 [XP]  - GEMALTO N V, "Applicability of Downlink Sub frames for Transmission", vol. RAN WG2, no. Nanjing, China; 20160523 - 20160527, (20160522), 3GPP DRAFT; R2-163370, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE, URL: http://www.3gpp.org/ftp/Meetings_3GPP_SYNC/RAN2/Docs/, (20160522), XP051104901 [XP] 1-14 * the whole document *
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.