blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability
Register Forum

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3091143

EP3091143 - VEHICLE-MOUNTED CONCRETE PUMP WITH SUPPORTING DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  01.01.2021
Database last updated on 03.09.2024
FormerThe patent has been granted
Status updated on  24.01.2020
FormerGrant of patent is intended
Status updated on  28.10.2019
FormerExamination is in progress
Status updated on  24.11.2017
FormerRequest for examination was made
Status updated on  28.04.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
Putzmeister Engineering GmbH
Max-Eyth-Strasse 10
72631 Aichtal / DE
[2016/45]
Inventor(s)01 / GÖGGELMANN, Gernot
Saalfelder Strasse 15
72622 Nürtingen / DE
02 / PETZOLD, Wolf-Michael
Akazienstrasse 23
73773 Aichwald / DE
03 / NEUBERT, Michael
Kantstrasse 16
72631 Aichtal / DE
 [2016/45]
Representative(s)Gauss, Nikolai, et al
Pfiz/Gauss Patentanwälte PartmbB
Tübingerstraße 26
70178 Stuttgart / DE
[2020/09]
Former [2016/45]Gauss, Nikolai, et al
Wolf Pfiz & Gauss
Patentanwälte
Hauptmannsreute 93
70193 Stuttgart / DE
Application number, filing date16173078.305.04.2012
[2016/45]
Priority number, dateDE2011107531005.05.2011         Original published format: DE102011075310
[2016/45]
Filing languageDE
Procedural languageDE
PublicationType: A1 Application with search report 
No.:EP3091143
Date:09.11.2016
Language:DE
[2016/45]
Type: B1 Patent specification 
No.:EP3091143
Date:26.02.2020
Language:DE
[2020/09]
Search report(s)(Supplementary) European search report - dispatched on:EP27.09.2016
ClassificationIPC:E04G21/04, B66C23/80, B66C23/90, B60S9/04
[2016/45]
CPC:
B66C23/80 (EP,US); B60S9/04 (US); B66C23/905 (EP,US);
E04G21/04 (EP,US); E04G21/0436 (EP,US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/22]
Former [2016/45]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:AUTOBETONPUMPE MIT ABSTÜTZVORRICHTUNG[2016/45]
English:VEHICLE-MOUNTED CONCRETE PUMP WITH SUPPORTING DEVICE[2016/45]
French:POMPE À BÉTON MOBILE COMPRENANT UN DISPOSITIF D'APPUI[2016/45]
Examination procedure06.06.2016Date on which the examining division has become responsible
19.04.2017Amendment by applicant (claims and/or description)
19.04.2017Examination requested  [2017/22]
24.11.2017Despatch of a communication from the examining division (Time limit: M06)
28.05.2018Reply to a communication from the examining division
19.09.2018Despatch of a communication from the examining division (Time limit: M06)
20.03.2019Reply to a communication from the examining division
29.10.2019Communication of intention to grant the patent
20.01.2020Fee for grant paid
20.01.2020Fee for publishing/printing paid
20.01.2020Receipt of the translation of the claim(s)
Parent application(s)   TooltipEP12714649.6  / EP2705201
Opposition(s)27.11.2020No opposition filed within time limit [2021/05]
Fees paidRenewal fee
06.06.2016Renewal fee patent year 03
06.06.2016Renewal fee patent year 04
06.06.2016Renewal fee patent year 05
24.04.2017Renewal fee patent year 06
23.04.2018Renewal fee patent year 07
24.04.2019Renewal fee patent year 08
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU05.04.2012
AL26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MK26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
AT05.04.2020
IE05.04.2020
LU05.04.2020
FR26.04.2020
BE30.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
GB26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
[2022/31]
Former [2022/30]HU05.04.2012
AL26.02.2020
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
AT05.04.2020
IE05.04.2020
LU05.04.2020
FR26.04.2020
BE30.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
GB26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2022/28]HU05.04.2012
CY26.02.2020
CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
MT26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
AT05.04.2020
IE05.04.2020
LU05.04.2020
FR26.04.2020
BE30.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
GB26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/37]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
AT05.04.2020
IE05.04.2020
LU05.04.2020
FR26.04.2020
BE30.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
GB26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/22]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
IE05.04.2020
LU05.04.2020
FR26.04.2020
BE30.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
GB26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/20]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
IE05.04.2020
LU05.04.2020
FR26.04.2020
BE30.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/12]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
PL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SI26.02.2020
SK26.02.2020
SM26.02.2020
LU05.04.2020
FR26.04.2020
BE30.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/08]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
LU05.04.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2021/07]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
CH30.04.2020
LI30.04.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/52]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
MC26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/50]CZ26.02.2020
DK26.02.2020
EE26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/49]CZ26.02.2020
DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SK26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/48]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RO26.02.2020
RS26.02.2020
SE26.02.2020
SM26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
PT19.07.2020
Former [2020/47]DK26.02.2020
ES26.02.2020
FI26.02.2020
HR26.02.2020
LT26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/45]FI26.02.2020
HR26.02.2020
LV26.02.2020
NL26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/40]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
IS26.06.2020
Former [2020/39]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
BG26.05.2020
NO26.05.2020
GR27.05.2020
Former [2020/38]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
GR27.05.2020
Former [2020/37]FI26.02.2020
HR26.02.2020
LV26.02.2020
RS26.02.2020
SE26.02.2020
NO26.05.2020
Former [2020/35]FI26.02.2020
NO26.05.2020
Documents cited:Search[A]DE19710341  (DEUTSCHE BAHN AG [DE]) [A] 1-8* the whole document *;
 [A]US6351696  (KRASNY ALEXANDER [US], et al) [A] 1-8 * column 2, line 2 - column 4, line 15; figures 1-3 *;
 [A]DE102004012966  (PUTZMEISTER AG [DE]) [A] 1-8 * figure -; claims 1,3 *;
 [A]EP1849931  (ITALIANA FORME ACCIAIO [IT]) [A] 1-8 * column 3, line 27 - column 5, line 40; figure - *;
 [A]DE102007030107  (EWO FLUID POWER GMBH [DE]) [A] 1-8 * page 5, paragraphs 47-52; figure 1 *;
 [A]WO2010003636  (MOBA MOBILE AUTOMATION AG [DE], et al) [A] 1-8 * page 8, line 35 - page 13, line 5; figures 1-3 *
ExaminationDE4231441
 JP2001106487
 DE102007030107
by applicantDE10110176
 DE10349234
    - BETON, vol. 6/96, page 362,364
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.