EP3118141 - SECURITY SYSTEM FOR SAFEGUARDING A LIFTING-TILTING PATH OF A LOADING SYSTEM, AND A METHOD THEREFOR [Right-click to bookmark this link] | Status | No opposition filed within time limit Status updated on 12.05.2023 Database last updated on 30.10.2024 | |
Former | The patent has been granted Status updated on 03.06.2022 | ||
Former | Grant of patent is intended Status updated on 10.02.2022 | ||
Former | Examination is in progress Status updated on 09.11.2018 | ||
Former | Request for examination was made Status updated on 14.07.2017 | ||
Former | The application has been published Status updated on 16.12.2016 | Most recent event Tooltip | 06.09.2024 | Lapse of the patent in a contracting state New state(s): MT | published on 09.10.2024 [2024/41] | Applicant(s) | For all designated states Terberg Machines B.V. Baronieweg 23 3403 NL Ijsselstein / NL | [2017/03] | Inventor(s) | 01 /
Versteeg, Jan Paul W. Elsschotstraat 10 6708 RV Wageningen / NL | [2017/03] | Representative(s) | Verdijck, Gerardus, et al Arnold & Siedsma Bezuidenhoutseweg 57 2594 AC The Hague / NL | [2017/03] | Application number, filing date | 16179561.2 | 14.07.2016 | [2017/03] | Priority number, date | NL20152015164 | 14.07.2015 Original published format: NL 2015164 | [2017/03] | Filing language | NL | Procedural language | EN | Publication | Type: | A1 Application with search report | No.: | EP3118141 | Date: | 18.01.2017 | Language: | EN | [2017/03] | Type: | B1 Patent specification | No.: | EP3118141 | Date: | 06.07.2022 | Language: | EN | [2022/27] | Search report(s) | (Supplementary) European search report - dispatched on: | EP | 10.11.2016 | Classification | IPC: | B65F3/00 | [2017/03] | CPC: |
B65F3/00 (EP)
| Designated contracting states | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR [2017/33] |
Former [2017/03] | AL, AT, BE, BG, CH, CY, CZ, DE, DK, EE, ES, FI, FR, GB, GR, HR, HU, IE, IS, IT, LI, LT, LU, LV, MC, MK, MT, NL, NO, PL, PT, RO, RS, SE, SI, SK, SM, TR | Title | German: | SICHERHEITSSYSTEM ZUR SICHERUNG EINES HUB-SCHWENK-PFADS EINES LADESYSTEMS UND VERFAHREN DAFÜR | [2017/03] | English: | SECURITY SYSTEM FOR SAFEGUARDING A LIFTING-TILTING PATH OF A LOADING SYSTEM, AND A METHOD THEREFOR | [2017/03] | French: | SYSTEME DE SECURITE DESTINE A SECURISER UN TRAJET DE LEVAGE/BASCULEMENT D'UN SYSTEME DE CHARGEMENT ET UN PROCEDE ASSOCIE | [2017/03] | Examination procedure | 14.07.2016 | Date on which the examining division has become responsible | 06.07.2017 | Amendment by applicant (claims and/or description) | 10.07.2017 | Examination requested [2017/33] | 13.11.2018 | Despatch of a communication from the examining division (Time limit: M04) | 13.03.2019 | Reply to a communication from the examining division | 02.09.2019 | Despatch of a communication from the examining division (Time limit: M04) | 19.12.2019 | Reply to a communication from the examining division | 11.02.2022 | Communication of intention to grant the patent | 30.05.2022 | Fee for grant paid | 30.05.2022 | Fee for publishing/printing paid | 30.05.2022 | Receipt of the translation of the claim(s) | Opposition(s) | 11.04.2023 | No opposition filed within time limit [2023/24] | Fees paid | Renewal fee | 27.07.2018 | Renewal fee patent year 03 | 29.07.2019 | Renewal fee patent year 04 | 27.07.2020 | Renewal fee patent year 05 | 27.07.2021 | Renewal fee patent year 06 |
Opt-out from the exclusive Tooltip competence of the Unified Patent Court | See the Register of the Unified Patent Court for opt-out data | ||
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court. | Lapses during opposition Tooltip | HU | 14.07.2016 | AL | 06.07.2022 | BG | 06.07.2022 | CY | 06.07.2022 | CZ | 06.07.2022 | FI | 06.07.2022 | HR | 06.07.2022 | MC | 06.07.2022 | MK | 06.07.2022 | MT | 06.07.2022 | RO | 06.07.2022 | RS | 06.07.2022 | SI | 06.07.2022 | SK | 06.07.2022 | SM | 06.07.2022 | TR | 06.07.2022 | LU | 14.07.2022 | CH | 31.07.2022 | LI | 31.07.2022 | GR | 07.10.2022 | IS | 06.11.2022 | [2024/41] |
Former [2024/34] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
BG | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
TR | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2024/29] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
TR | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2024/22] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
FI | 06.07.2022 | ||
HR | 06.07.2022 | ||
MC | 06.07.2022 | ||
MK | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2024/20] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
CY | 06.07.2022 | ||
CZ | 06.07.2022 | ||
FI | 06.07.2022 | ||
MC | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2024/18] | HU | 14.07.2016 | |
AL | 06.07.2022 | ||
CZ | 06.07.2022 | ||
FI | 06.07.2022 | ||
MC | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/37] | AL | 06.07.2022 | |
CZ | 06.07.2022 | ||
FI | 06.07.2022 | ||
MC | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SI | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/29] | AL | 06.07.2022 | |
CZ | 06.07.2022 | ||
FI | 06.07.2022 | ||
MC | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/23] | CZ | 06.07.2022 | |
FI | 06.07.2022 | ||
MC | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SK | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/22] | CZ | 06.07.2022 | |
FI | 06.07.2022 | ||
MC | 06.07.2022 | ||
RO | 06.07.2022 | ||
RS | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/21] | FI | 06.07.2022 | |
RS | 06.07.2022 | ||
SM | 06.07.2022 | ||
LU | 14.07.2022 | ||
CH | 31.07.2022 | ||
LI | 31.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/20] | FI | 06.07.2022 | |
RS | 06.07.2022 | ||
SM | 06.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/12] | FI | 06.07.2022 | |
RS | 06.07.2022 | ||
GR | 07.10.2022 | ||
IS | 06.11.2022 | ||
Former [2023/10] | FI | 06.07.2022 | |
RS | 06.07.2022 | ||
GR | 07.10.2022 | ||
Former [2023/08] | FI | 06.07.2022 | |
RS | 06.07.2022 | Documents cited: | Search | [XA]EP0818402 (GEESINK BV [NL]) [X] 1,6,8-13 * column 1, line 57 - column 2, line 52 * * column 5, line 23 - line 54 * * figures 1,2 * [A] 2-5,7; | [XA]DE102005023154 (SCHNEIDER SYSTEMTECHNIK GMBH [DE]) [X] 1,6,7,9-13 * paragraph [0015] - paragraph [0028] * * figures 1-5 * [A] 2-5,8; | [XD]NL2008407C (TERBERG MACHINES) [XD] 1,7,9-13 * page 8, line 11 - page 10, line 19 ** figures 1-4; claims 1-12 * | by applicant | NL2008407C |