Extract from the Register of European Patents

EP About this file: EP3270236

EP3270236 - RUNNING TIME EQUATION MECHANISM CONTROLLED BY A DIFFERENTIAL DEVICE [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.12.2020
Database last updated on 18.03.2026
FormerThe patent has been granted
Status updated on  10.01.2020
FormerGrant of patent is intended
Status updated on  10.11.2019
FormerExamination is in progress
Status updated on  07.09.2018
FormerRequest for examination was made
Status updated on  20.07.2018
FormerThe application has been published
Status updated on  15.12.2017
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
MONTRES BREGUET S.A.
1344 L'Abbaye / CH
[2018/03]
Inventor(s)01 / DAUBY, Sylvain
Rue de l'Arcadie 7
1347 Le Sentier / CH
02 / ZAUGG, Alain
Derrière-la-Côte 42
1347 Le Sentier / CH
 [2019/49]
Former [2018/03]01 / Dauby, Sylvain
Rue de l'Arcadie 7
1347 Le Sentier / CH
02 / Zaugg, Alain
Derrière-la-Côte 42
1347 Le Sentier / CH
Representative(s)Supper, Marc, et al
ICB
Ingénieurs Conseils en Brevets SA
Faubourg de l'Hôpital 3
2001 Neuchâtel / CH
[2018/03]
Application number, filing date16179617.215.07.2016
[2018/03]
Filing languageFR
Procedural languageFR
PublicationType: A1 Application with search report 
No.:EP3270236
Date:17.01.2018
Language:FR
[2018/03]
Type: B1 Patent specification 
No.:EP3270236
Date:12.02.2020
Language:FR
[2020/07]
Search report(s)(Supplementary) European search report - dispatched on:EP17.01.2017
ClassificationIPC:G04B19/26
[2018/03]
CPC:
G04B19/262 (EP,US); G04B19/025 (US); G04B49/00 (US);
G04B19/24 (US); G04B27/001 (US)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2018/34]
Former [2018/03]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:MECHANISMUS DER ZEITGLEICHUNG, DER DURCH EINE DIFFERENZIALVORRICHTUNG GESTEUERT WIRD[2018/03]
English:RUNNING TIME EQUATION MECHANISM CONTROLLED BY A DIFFERENTIAL DEVICE[2018/03]
French:MECANISME D'EQUATION DU TEMPS MARCHANTE COMMANDE PAR UN DISPOSITIF DIFFERENTIEL[2018/03]
Examination procedure15.07.2016Date on which the examining division has become responsible
12.07.2018Amendment by applicant (claims and/or description)
17.07.2018Examination requested  [2018/34]
06.09.2018Despatch of a communication from the examining division (Time limit: M04)
12.02.2019Despatch of communication that the application is deemed to be withdrawn, reason: reply to the communication from the examining division not received in time
25.02.2019Reply to a communication from the examining division
10.10.2019Cancellation of oral proceeding that was planned for 12.11.2019
11.11.2019Communication of intention to grant the patent
12.11.2019Date of oral proceedings (cancelled)
17.12.2019Fee for grant paid
17.12.2019Fee for publishing/printing paid
17.12.2019Receipt of the translation of the claim(s)
Divisional application(s)EP19207360.9  / EP3640747
Opposition(s)13.11.2020No opposition filed within time limit [2021/03]
Request for further processing for:The application is deemed to be withdrawn due to failure to reply to the examination report
25.02.2019Request for further processing filed
25.02.2019Full payment received (date of receipt of payment)
Request granted
13.03.2019Decision despatched
Fees paidRenewal fee
24.07.2018Renewal fee patent year 03
22.07.2019Renewal fee patent year 04
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU15.07.2016
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MK12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
[2022/31]
Former [2022/30]HU15.07.2016
AL12.02.2020
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
Former [2022/27]HU15.07.2016
AT12.02.2020
CY12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
MT12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
TR12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
Former [2021/37]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
IE15.07.2020
LU15.07.2020
BE31.07.2020
Former [2021/24]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
LU15.07.2020
BE31.07.2020
Former [2021/20]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
LU15.07.2020
Former [2021/13]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
MC12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2021/10]AT12.02.2020
CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
IT12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
PL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SI12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/50]CZ12.02.2020
DK12.02.2020
EE12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/49]CZ12.02.2020
DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SK12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/48]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RO12.02.2020
RS12.02.2020
SE12.02.2020
SM12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
PT05.07.2020
Former [2020/47]DK12.02.2020
ES12.02.2020
FI12.02.2020
HR12.02.2020
LT12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/45]FI12.02.2020
HR12.02.2020
LV12.02.2020
NL12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/40]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
IS12.06.2020
Former [2020/39]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
BG12.05.2020
NO12.05.2020
GR13.05.2020
Former [2020/38]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
GR13.05.2020
Former [2020/37]FI12.02.2020
HR12.02.2020
LV12.02.2020
RS12.02.2020
SE12.02.2020
NO12.05.2020
Former [2020/35]FI12.02.2020
NO12.05.2020
Documents cited:Search[XAI] EP1637942  (PIGUET FREDERIC SA et al.)
 [XAI] EP1637941  (PIGUET FREDERIC SA et al.) [X] 1,3 * paragraphs [0019] , [0020] * * figure - *[A] 4-16 [I] 2
 [XA] EP2778800  (BLANCPAIN SA et al.) [X] 1 * paragraph [23.24] * * figure - *[A] 2-16
 [X] CH698613  (RICHEMONT INT SA et al.) [X] 1 * paragraph [0024] * * figures 4a,4b *
by applicantEP1286233
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.