blank Quick help
blank Maintenance news

Scheduled maintenance

Regular maintenance outages:
between 05.00 and 05.15 hrs CET (Monday to Sunday).

Other outages
Availability

2022.02.11

More...
blank News flashes

News Flashes

New version of the European Patent Register – SPC proceedings information in the Unitary Patent Register.

2024-07-24

More...
blank Related links

Extract from the Register of European Patents

EP About this file: EP3121454

EP3121454 - HYDRAULIC SIGNAL CONTROL SYSTEM AND METHOD [Right-click to bookmark this link]
StatusNo opposition filed within time limit
Status updated on  18.10.2019
Database last updated on 11.09.2024
FormerThe patent has been granted
Status updated on  09.11.2018
FormerGrant of patent is intended
Status updated on  01.07.2018
FormerRequest for examination was made
Status updated on  28.07.2017
FormerThe application has been published
Status updated on  23.12.2016
Most recent event   Tooltip08.07.2022Lapse of the patent in a contracting state
New state(s): MK
published on 10.08.2022  [2022/32]
Applicant(s)For all designated states
CNH Industrial Italia S.p.A.
Via Plava 80
10135 Torino / IT
[2017/04]
Inventor(s)01 / JOHNSON, Thomas
Commonwealth ave apt 2C 2327 N
Chicago 60614 / US
 [2017/04]
Representative(s)CNH Industrial IP Department
Leon Claeysstraat 3A
8210 Zedelgem / BE
[N/P]
Former [2017/04]CNH Industrial IP Department
Patent Department
Leon Claeysstraat 3A
8210 Zedelgem / BE
Application number, filing date16180354.920.07.2016
[2017/04]
Priority number, dateUS20151480640622.07.2015         Original published format: US201514806406
[2017/04]
Filing languageEN
Procedural languageEN
PublicationType: A1 Application with search report 
No.:EP3121454
Date:25.01.2017
Language:EN
[2017/04]
Type: B1 Patent specification 
No.:EP3121454
Date:12.12.2018
Language:EN
[2018/50]
Search report(s)(Supplementary) European search report - dispatched on:EP19.12.2016
ClassificationIPC:F15B11/08, // F15B19/00
[2017/04]
CPC:
F15B11/003 (EP,US); F16K31/00 (BR); F16K31/423 (US);
A01B76/00 (US); E02F9/2278 (US); E02F9/2285 (US);
F15B19/002 (EP,US); F15B2211/30515 (EP,US); F15B2211/30525 (EP,US);
F15B2211/329 (EP,US); F15B2211/355 (EP,US); F15B2211/7053 (US);
F15B2211/71 (US); F15B2211/783 (EP,US) (-)
Designated contracting statesAL,   AT,   BE,   BG,   CH,   CY,   CZ,   DE,   DK,   EE,   ES,   FI,   FR,   GB,   GR,   HR,   HU,   IE,   IS,   IT,   LI,   LT,   LU,   LV,   MC,   MK,   MT,   NL,   NO,   PL,   PT,   RO,   RS,   SE,   SI,   SK,   SM,   TR [2017/35]
Former [2017/04]AL,  AT,  BE,  BG,  CH,  CY,  CZ,  DE,  DK,  EE,  ES,  FI,  FR,  GB,  GR,  HR,  HU,  IE,  IS,  IT,  LI,  LT,  LU,  LV,  MC,  MK,  MT,  NL,  NO,  PL,  PT,  RO,  RS,  SE,  SI,  SK,  SM,  TR 
TitleGerman:SYSTEM UND VERFAHREN ZUR STEUERUNG EINES HYDRAULISCHEN SIGNALS[2017/04]
English:HYDRAULIC SIGNAL CONTROL SYSTEM AND METHOD[2017/04]
French:SYSTÈME ET PROCÉDÉ DE COMMANDE DE SIGNAL HYDRAULIQUE[2017/04]
Examination procedure20.07.2016Date on which the examining division has become responsible
17.07.2017Amendment by applicant (claims and/or description)
25.07.2017Examination requested  [2017/35]
02.07.2018Communication of intention to grant the patent
26.10.2018Fee for grant paid
26.10.2018Fee for publishing/printing paid
26.10.2018Receipt of the translation of the claim(s)
Opposition(s)13.09.2019No opposition filed within time limit [2019/47]
Fees paidRenewal fee
31.07.2018Renewal fee patent year 03
Opt-out from the exclusive  Tooltip
competence of the Unified
Patent Court
See the Register of the Unified Patent Court for opt-out data
Responsibility for the accuracy, completeness or quality of the data displayed under the link provided lies entirely with the Unified Patent Court.
Lapses during opposition  TooltipHU20.07.2016
AL12.12.2018
AT12.12.2018
CY12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
MK12.12.2018
MT12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
TR12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
IE20.07.2019
LU20.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
[2022/32]
Former [2021/34]HU20.07.2016
AL12.12.2018
AT12.12.2018
CY12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
MT12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
TR12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
IE20.07.2019
LU20.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2021/32]HU20.07.2016
AL12.12.2018
AT12.12.2018
CY12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
TR12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
IE20.07.2019
LU20.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2021/26]AL12.12.2018
AT12.12.2018
CY12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
TR12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
IE20.07.2019
LU20.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2020/36]AL12.12.2018
AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
TR12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
IE20.07.2019
LU20.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2020/25]AL12.12.2018
AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
TR12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
LU20.07.2019
BE31.07.2019
CH31.07.2019
LI31.07.2019
Former [2020/17]AL12.12.2018
AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
TR12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2020/14]AL12.12.2018
AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
MC12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/50]AL12.12.2018
AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SI12.12.2018
SK12.12.2018
SM12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/48]AL12.12.2018
AT12.12.2018
CZ12.12.2018
DK12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SK12.12.2018
SM12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/46]AL12.12.2018
AT12.12.2018
CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SK12.12.2018
SM12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/39]AL12.12.2018
CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SK12.12.2018
SM12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
IS12.04.2019
PT12.04.2019
Former [2019/37]AL12.12.2018
CZ12.12.2018
EE12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RO12.12.2018
RS12.12.2018
SE12.12.2018
SM12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
PT12.04.2019
Former [2019/35]AL12.12.2018
CZ12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
PL12.12.2018
RS12.12.2018
SE12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
PT12.04.2019
Former [2019/33]AL12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
RS12.12.2018
SE12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
PT12.04.2019
Former [2019/30]AL12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
NL12.12.2018
RS12.12.2018
SE12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
Former [2019/26]AL12.12.2018
ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
RS12.12.2018
SE12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
Former [2019/25]ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
RS12.12.2018
SE12.12.2018
BG12.03.2019
NO12.03.2019
GR13.03.2019
Former [2019/23]ES12.12.2018
FI12.12.2018
HR12.12.2018
LT12.12.2018
LV12.12.2018
BG12.03.2019
NO12.03.2019
Former [2019/22]FI12.12.2018
LT12.12.2018
BG12.03.2019
NO12.03.2019
Former [2019/21]FI12.12.2018
LT12.12.2018
NO12.03.2019
Former [2019/20]LT12.12.2018
NO12.03.2019
Documents cited:Search[A]EP0331076  (KOBE STEEL LTD [JP]) [A] 1 * column 5, lines 15-50 *;
 [A]US4967554  (KAUSS WOLFGANG [DE]) [A] 1 * column 3, lines 8-58 *;
 [A]EP0756089  (DEERE & CO [US]) [A] 1* column 5, line 31 - column 6, line 4 *;
 [A]US6196247  (KNOELL BURKHARD [DE], et al) [A] 1-10 * column 9, line 33 - column 11, line 31 *
by applicantUS6571190
The EPO accepts no responsibility for the accuracy of data originating from other authorities; in particular, it does not guarantee that it is complete, up to date or fit for specific purposes.